Northern Regional Load Despatch Centre
POSOCO Ltd LOGO POSOCO LOGO
POSOCO
POSOCO Intranet E-Mail Hindi
POSOCO ISO 9001 Certified. ISO 1001 Certified OHSAS 18001 Certifiied ISO 27001 Certified
POSOCO
Skip Navigation Links
Home
Transfer capabilityExpand Transfer capability
SchedulingExpand Scheduling
Open Access
CommercialExpand Commercial
Availability Verification
ReportsExpand Reports
Documents
WeatherExpand Weather
Disaster Management
RE Initiative
Tenders
NR Grid Frequency
50.12
Last Updated at : 21/10/2014 15:45:30
UI Rate
00.00
Current Sch Status Rev No
51
View Changes Made in Last Revision
States Stations


NRLDC submission dated 14th July 2014 in petition 008/SM/2014 before Hon'ble CERC
NRLDC submission before hon’ble CERC in Petition 006/SM/2014 dated 16.07.2014

NRLDC is the apex body to ensure integrated operation of the power system in the Northern Region.

The main responsibilities of NRLDC are:


  • To ensure the integrated operation of the power system in the Northern Region.

  • Monitoring of system parameters and system security.

  • Daily scheduling and operational planning.

  • Facilitating bilateral and inter-regional exchanges of power.

  • Analysis of tripping/disturbances and facilitating immediate remedial measures.

  • System studies,planning and contingency analysis.

  • Augmentation of telemetry, computing and communication facilities.

  • Computation of energy despatch and drawal values using SEMs.