PAS::99 Certified    ISO::9001:2000, ISO::14001 & OHSAS::18001 Certified                                                                                                  Skip Navigation Links
हमारे बारे में
About Us
Expand <font size=3>हमारे बारे में</font> <br> About Us
अन्य क्षेत्रीय भार प्रेषण केंद्र
Other RLDCs
Expand <font size=3>अन्य क्षेत्रीय भार प्रेषण केंद्र</font> <br>Other RLDCs
आरटीआई अधिनियम 2005
RTI Act 2005
संपर्क करें
Contact Us
Skip Navigation Links
घर / Home
स्थानांतरण क्षमता
Transfer Capability
Expand <font size=3>स्थानांतरण क्षमता</font> <br>Transfer Capability
समयबद्धन / SchedulingExpand <font size=3>समयबद्धन </font> / Scheduling
ओपन एक्सेस / Open Access
वाणिज्यिक / CommercialExpand <font size=3>वाणिज्यिक</font> / Commercial
उपलब्धता सत्यापन
Availability Verification
रिपोर्ट / ReportsExpand <font size=3>रिपोर्ट</font> / Reports
दस्तावेज़ / Documents
मौसम / WeatherExpand <font size=3>मौसम</font> / Weather
उपयोगी कड़ियाँ / Useful Links
शिकायतें / Complaints
प्रतिक्रिया / Feedback
खोज / Search
अस्वीकरण / Disclaimer
केवल इंट्रानेट-अधिकृत व्यक्ति
Intranet-authorized person only


केवल ई मेल अधिकृत व्यक्ति
E-mail-authorized person only
Calculations...
SEM Hand book
 


Net injection of Inter State Generating stations (ISGS)/BBMB generating stations & net drawal of State Utilities using Special Energy Meters (SEMs)

(i)            The sign convention of power flow recorded by meters is positive for flow out of bus-bar and negative for power flow into the bus-bar. However, for meters on LV/HV side of Generator Transformers, the meters have actually been connected so as to read positive for power flow into the HV bus-bar.

(ii)          Net injection/drawal at any location is algebraic sum of meters (including sign) on all feeders/ICTs/GTs listed with that location.

(iii)         Net drawal of State Utilities would be algebraic sum of drawals at all the locations listed for that utility.

(iv)        Multiplying factor to be applied with standby meters is to compensate for transmission/transformation losses & would depend upon voltage level (1.5 % for 400 kV, 3% for 220 kV lines & 4% for 132 & below lines) as agreed by Commercial Committee of NREB in its 105th meeting held on 08.03.2001. 

(v)          State Utilities would also be required to send daily readings of the Existing Conventional Meter (ECM) along with time of outages of some LV feeders listed with respective states to NRLDC on a weekly basis. (SEMs on these feeder have not been installed in view of negligible/ constant power flows).