STOA Scheduling Acceptance for 06-Aug-2010

    Colored transactions are Revised/Surrendered
 
S.No Acceptance No Application no Utilities FromDate ToDate Schedule Route
1 Aug-10/AP-10212-SD
06-Aug-10
CC/NVVN/OA/5660
dt06-Aug-10
NVVN
AURY_RF
-RPPC
06-Aug-10 06-Aug-10 1900-2300: 20 MW ----
2 Aug-10/AP-10211-SD
06-Aug-10
CC/NVVN/OA/5659
dt06-Aug-10
NVVN
ANTA_RF
-RPPC
06-Aug-10 06-Aug-10 1900-2300: 15 MW ----
3 Aug-10/AP-10210-SD
06-Aug-10
CC/NVVN/OA/5658
dt06-Aug-10
NVVN
DADRI_RF
-RPPC
06-Aug-10 06-Aug-10 1900-2300: 30 MW ----
4 Aug-10/AP-9389-AD
06-Aug-10

Rev.No: 1
LPTL/OA/2010-11/07
dt28-May-10
LEUL
LKPPL
-PSEB
01-Aug-10 08-Aug-10 0000-2400: 175 MW SR-ER-NR
5 Aug-10/AP-9387-AD
06-Aug-10

Rev.No: 1
10F/JSWEL-HPPC/2010
dt21-May-10
JSWPTCL
JSWEL
-HPPC
01-Aug-10 08-Aug-10 0000-2400: 300 MW SR-ER-NR
6 Aug-10/AP-9353-AD
06-Aug-10

Rev.No: 2
RETL/NRLDC/1150205
dt12-May-10
Reliance
MPPTCL
-BRPL
02-Aug-10 08-Aug-10 0000-0200: 60 MW
0200-1000: 0 MW
1000-2400: 60 MW
WR-NR
7 Aug-10/AP-10208-SD
05-Aug-10
10547
dt05-Aug-10
PTC
HPSEB
-NDPL
06-Aug-10 06-Aug-10 0000-0230: 19 MW
0230-0400: 18 MW
0400-0645: 19 MW
0645-0800: 17 MW
0800-0945: 18 MW
0945-1300: 19 MW
1300-1400: 18 MW
1400-1630: 19 MW
1630-1715: 18 MW
1715-1815: 17 MW
1815-2400: 19 MW
----
8 Aug-10/AP-10207-SD
05-Aug-10
10549
dt05-Aug-10
PTC
HPSEB
-HPPC
06-Aug-10 06-Aug-10 0000-0230: 43 MW
0230-0400: 41 MW
0400-0645: 43 MW
0645-0815: 39 MW
0815-0945: 41 MW
0945-1300: 43 MW
1300-1400: 41 MW
1400-1630: 43 MW
1630-1715: 41 MW
1715-1815: 39 MW
1815-1830: 42 MW
1830-2400: 43 MW
----
9 Aug-10/AP-10206-SD
05-Aug-10
10548
dt05-Aug-10
PTC
HPSEB
-PSEB
06-Aug-10 06-Aug-10 0000-0230: 59 MW
0230-0400: 56 MW
0400-0645: 59 MW
0645-0800: 53 MW
0800-0815: 54 MW
0815-0945: 56 MW
0945-1300: 59 MW
1300-1400: 56 MW
1400-1630: 59 MW
1630-1715: 56 MW
1715-1815: 53 MW
1815-1830: 57 MW
1830-2400: 59 MW
----
10 Aug-10/AP-10203-SD
05-Aug-10
PSPCL/OA/2010-11/43
dt05-Aug-10
PSEB
J & K
-PSEB
06-Aug-10 06-Aug-10 0000-1000: 100 MW
1000-2400: 50 MW
----
11 Aug-10/AP-10202-SD
05-Aug-10
10553
dt05-Aug-10
PTC
SPDC-JK
-HPPC
06-Aug-10 06-Aug-10 0000-2400: 50 MW ----
12 Aug-10/AP-10201-SD
05-Aug-10
10552
dt05-Aug-10
PTC
SPDC-JK
-PSEB
06-Aug-10 06-Aug-10 0000-2400: 175 MW ----
13 Aug-10/AP-10200-SD
05-Aug-10
10550
dt05-Aug-10
PTC
MALANA
-PSEB
06-Aug-10 06-Aug-10 0000-2400: 72 MW ----
14 Aug-10/AP-10199-DA
05-Aug-10
UP/BRPL/NRLDC/OA/82
dt05-Aug-10
UPPCL
BRPL
-UPPCL
06-Aug-10 06-Aug-10 0000-0200: 100 MW
2300-2400: 100 MW
----
15 Aug-10/AP-10180-FS
05-Aug-10
OA/ISL-UPPCL/352
dt02-Aug-10
KISPL
ISL-CSEB
-UPPCL
06-Aug-10 15-Aug-10 0000-0600: 6 MW
2300-2400: 6 MW
WR-NR
16 Aug-10/AP-9756-AD
05-Aug-10

Rev.No: 2
LPTL/OA/2010-11/85
dt24-Jun-10
LEUL
VSWNI-CS
-BRPL
01-Aug-10 07-Aug-10 0000-1800: 6 MW
1800-2300: 0 MW
2300-2400: 6 MW
WR-NR
17 Aug-10/AP-9371-AD
05-Aug-10

Rev.No: 2
26482-TPC U8-PSEB
dt25-May-10
TATA
Tata Power
-PSEB
01-Aug-10 07-Aug-10 0000-2400: 74 MW WR-NR
18 Aug-10/AP-9367-AD
05-Aug-10

Rev.No: 1
1136D/JPL-A1/2010
dt22-May-10
JPL
JPL
-BRPL
06-Aug-10 31-Aug-10 0000-1800: 135 MW
1800-2400: 150 MW
WR-NR
19 Aug-10/AP-9745-AD
04-Aug-10

Rev.No: 1
RETL/NRLDC/1150211
dt05-Jun-10
Reliance
VJSPL-KTK
-BRPL
06-Aug-10 31-Aug-10 0000-1800: 12 MW
1800-2400: 14 MW
SR-ER-NR
20 Aug-10/AP-9383-AD
04-Aug-10

Rev.No: 2
26481-GFL D-PSEB
dt31-May-10
TATA
GFL-GUJ
-PSEB
04-Aug-10 06-Aug-10 0000-2400: 22 MW WR-NR
21 Aug-10/AP-10153-FS
03-Aug-10
UP/BYPL/NRLDC/OA/74
dt31-Jul-10
UPPCL
BYPL
-UPPCL
04-Aug-10 31-Aug-10 0000-0100: 100 MW
0100-0200: 50 MW
2300-2400: 100 MW
----
22 Aug-10/AP-10152-FS
03-Aug-10
UP/BRPL/NRLDC/OA/75
dt31-Jul-10
UPPCL
BRPL
-UPPCL
04-Aug-10 31-Aug-10 0000-0200: 50 MW
2300-2400: 50 MW
----
23 Aug-10/AP-9746-AD
03-Aug-10

Rev.No: 1
RETL/NRLDC/1150191
dt07-Jun-10
Reliance
NBVL(AP)
-BYPL
01-Aug-10 06-Aug-10 0000-2400: 18 MW SR-ER-NR
24 Aug-10/AP-9386-AD
03-Aug-10

Rev.No: 2
RETL/NRLDC/1150190
dt18-May-10
Reliance
NBVL(AP)
-BYPL
01-Aug-10 06-Aug-10 0000-2400: 23.4 MW SR-ER-NR
25 Aug-10/AP-9384-AD
03-Aug-10

Rev.No: 1
704079
dt31-May-10
ADANI
APL
-PSEB
04-Aug-10 21-Aug-10 0000-2400: 60 MW WR-NR
26 Aug-10/AP-10143-FS
02-Aug-10
OA/SSPL-UPPCL/351
dt30-Jul-10
KISPL
SSIL-CS
-UPPCL
03-Aug-10 21-Aug-10 0000-0600: 13 MW
2300-2400: 13 MW
WR-NR
27 Aug-10/AP-10142-FS
02-Aug-10
NVVN/OA/5633
dt30-Jul-10
NVVN
J & K
-HPPC
03-Aug-10 10-Aug-10 0000-2400: 100 MW ----
28 Aug-10/AP-10141-FS
02-Aug-10
UP/BRPL/NRLDC/OA/70
dt30-Jul-10
UPPCL
BRPL
-UPPCL
03-Aug-10 31-Aug-10 0000-0200: 50 MW
0200-1000: 200 MW
2300-2400: 50 MW
----
29 Aug-10/AP-10140-FS
02-Aug-10
UP/BYPL/NRLDC/OA/71
dt30-Jul-10
UPPCL
BYPL
-UPPCL
03-Aug-10 31-Aug-10 0100-0200: 50 MW
0200-1000: 100 MW
----
30 Aug-10/AP-9763-AD
02-Aug-10

Rev.No: 1
LPTL/OA/2010-11/82
dt24-Jun-10
LEUL
MSPPL
-BRPL
03-Aug-10 10-Aug-10 0000-1800: 6 MW
1800-2300: 0 MW
2300-2400: 6 MW
WR-NR
31 Aug-10/AP-9388-AD
02-Aug-10

Rev.No: 1
11F/JSWEL-PSEB/2010
dt28-May-10
JSWPTCL
JSWEL
-PSEB
04-Aug-10 11-Aug-10 0000-2400: 100 MW SR-ER-NR
32 Aug-10/AP-9370-AD
02-Aug-10

Rev.No: 1
LPTL/OA/2010-11/10
dt28-May-10
LEUL
JPL
-PSEB
04-Aug-10 09-Aug-10 0000-2400: 50 MW WR-NR
33 Aug-10/AP-9358-AD
02-Aug-10

Rev.No: 1
26483-TPC(H)-PSEB
dt20-May-10
TATA
TPH-WB
-PSEB
04-Aug-10 09-Aug-10 0000-2400: 30 MW ER-NR
34 Jul-10/AP-10103-FS
30-Jul-10
PSPCL/OA/2010-11/38
dt29-Jul-10
PSEB
HPSEB
-PSEB
02-Aug-10 31-Aug-10 0000-2400: 68 MW ----
35 Jul-10/AP-10102-FS
30-Jul-10
PSPCL/OA/2010-11/37
dt29-Jul-10
PSEB
HPSEB
-PSEB
02-Aug-10 31-Aug-10 0000-0600: 85 MW
0600-2400: 65 MW
----
36 Jul-10/AP-10101-FS
30-Jul-10
NG/BRPL/Jul10/OA/04
dt29-Jul-10
Nagaland
Nagaland
-BRPL
02-Aug-10 15-Aug-10 0000-1700: 24 MW
1700-2200: 10 MW
2200-2400: 24 MW
NER-ER-NR
37 Jul-10/AP-10100-FS
30-Jul-10
OA/BALCO-UPPCL/350
dt29-Jul-10
KISPL
BALCO
-UPPCL
02-Aug-10 08-Aug-10 0000-0600: 75 MW
2300-2400: 75 MW
WR-NR
38 Jul-10/AP-9761-AD
30-Jul-10

Rev.No: 1
LPTL/OA/2010-11/73
dt24-Jun-10
LEUL
Real Ispat
-BRPL
03-Aug-10 31-Aug-10 0000-1800: 12 MW
1800-2300: 0 MW
2300-2400: 12 MW
WR-NR
39 Jul-10/AP-9758-AD
30-Jul-10

Rev.No: 1
LPTL/OA/2010-11/70
dt24-Jun-10
LEUL
SBMPL-CS
-BRPL
01-Aug-10 15-Aug-10 0000-1800: 9 MW
1800-2300: 0 MW
2300-2400: 9 MW
WR-NR
40 Jul-10/AP-9757-AD
30-Jul-10

Rev.No: 1
LPTL/OA/2010-11/79
dt24-Jun-10
LEUL
SBPIL-CS
-BRPL
01-Aug-10 15-Aug-10 0000-1800: 16 MW
1800-2300: 0 MW
2300-2400: 16 MW
WR-NR
41 Jul-10/AP-9382-AD
30-Jul-10

Rev.No: 1
LPTL/OA/2009-10/43
dt29-May-10
LEUL
MPPTCL
-BYPL
01-Aug-10 31-Aug-10 0000-2400: 40 MW WR-NR
42 Jul-10/AP-9368-AD
30-Jul-10

Rev.No: 1
PSPCL/OA/2010-11/06
dt25-May-10
PSEB
MPSEB
-PSEB
01-Aug-10 08-Aug-10 0000-2400: 50 MW WR-NR
43 Jul-10/AP-10077-FS
29-Jul-10
AP/BRPL/Jul10/OA/99
dt27-Jul-10
ARUNANCHAL
ARUNANCHAL
-BRPL
01-Aug-10 31-Aug-10 0000-1200: 25 MW
1200-1700: 20 MW
1700-2200: 30 MW
2200-2400: 25 MW
NER-ER-NR
44 Jul-10/AP-10076-FS
29-Jul-10
BYPL/HPSEB-01/AUG-10
dt27-Jul-10
BYPL
HPSEB
-BYPL
01-Aug-10 31-Aug-10 0000-2400: 18.44 MW ----
45 Jul-10/AP-10075-FS
29-Jul-10
LPTL/OA/2010-11/100
dt26-Jul-10
LEUL
MPSEB
-BRPL
01-Aug-10 31-Aug-10 1800-2300: 70 MW WR-NR
46 Jul-10/AP-9366-AD
29-Jul-10

Rev.No: 1
1137D/JPL-A1/2010
dt21-May-10
JPL
JPL
-BYPL
01-Aug-10 31-Aug-10 0000-2400: 135 MW WR-NR
47 Jul-10/AP-10063-FS
28-Jul-10
RETL/NRLDC/1150268
dt23-Jul-10
Reliance
NBVL(Or)
-BRPL
01-Aug-10 31-Aug-10 0000-2400: 4 MW ER-NR
48 Jul-10/AP-10062-AD
28-Jul-10
spl-2/hppc-pp-89/III
dt26-Jul-10
HPPC
HPSEB
-HPPC
01-Aug-10 31-Aug-10 0000-2400: 50 MW ----
49 Jul-10/AP-10061-AD
28-Jul-10
spl-/hppc/pp-89/III
dt26-Jul-10
HPPC
HPSEB
-HPPC
01-Aug-10 31-Aug-10 0000-0600: 70 MW
1900-2400: 70 MW
----
50 Jul-10/AP-10059-FS
28-Jul-10
NVVN/5591
dt22-Jul-10
NVVN
MSEDCL
-PSEB
01-Aug-10 13-Aug-10 0600-0900: 13 MW WR-NR
51 Jul-10/AP-10040-FS
26-Jul-10
UTC/2010-11/4
dt21-Jul-10
UT-Chd
J & K
-UT-Chd
01-Aug-10 31-Aug-10 1000-1800: 30 MW ----
52 Jul-10/AP-10021-AD
23-Jul-10

dt20-Jul-10
NPCL(UP)
GUVNL
-NPCL(UP)
01-Aug-10 30-Aug-10 0000-0600: 43.2 MW
0600-0900: 0 MW
0900-1000: 30.3 MW
1000-1700: 50 MW
1700-2300: 0 MW
2300-2400: 43.2 MW
WR-ER-NR
53 Jul-10/AP-10021-AD
23-Jul-10

dt20-Jul-10
NPCL(UP)
GUVNL
-NPCL(UP)
01-Aug-10 30-Aug-10 0000-0600: 6.8 MW
0600-0900: 50 MW
0900-1000: 19.7 MW
1000-1700: 0 MW
1700-2300: 50 MW
2300-2400: 6.8 MW
WR-NR
54 Jul-10/AP-10020-AD
23-Jul-10
OA/VAL-NPCL/302
dt05-Jul-10
KISPL
VDANT
-NPCL(UP)
01-Aug-10 31-Aug-10 0000-2400: 15 MW ER-NR
55 Jul-10/AP-10019-AD
23-Jul-10
513/OAN/GMRETL/APPCC
dt29-Jun-10
GMRETL
APPCC
-BRPL
01-Aug-10 30-Aug-10 0000-0600: 101 MW
2200-2400: 55 MW
SR-ER-NR
56 Jun-10/AP-9767-AD
30-Jun-10
LPTL/OA/2010-11/66
dt24-Jun-10
LEUL
NAKODA
-BRPL
01-Aug-10 31-Aug-10 0000-1800: 14 MW
2300-2400: 14 MW
WR-NR
57 Jun-10/AP-9764-AD
30-Jun-10
LPTL/OA/2010-11/49
dt24-Jun-10
LEUL
SCPL-CS
-BRPL
01-Aug-10 31-Aug-10 0000-1800: 4.9 MW
2300-2400: 4.9 MW
WR-NR
58 Jun-10/AP-9762-AD
30-Jun-10
LPTL/OA/2010-11/76
dt24-Jun-10
LEUL
RSIPL-CS
-BRPL
01-Aug-10 31-Aug-10 0000-1800: 6 MW
2300-2400: 6 MW
WR-NR
59 Jun-10/AP-9760-AD
30-Jun-10
LPTL/OA/2010-11/31
dt24-Jun-10
LEUL
ACPL-CS
-UT-Chd
01-Aug-10 31-Aug-10 0000-1800: 16 MW
2300-2400: 16 MW
WR-NR
60 Jun-10/AP-9759-AD
30-Jun-10
LPTL/OA/2010-11/87
dt24-Jun-10
LEUL
VGL-CSEB
-BRPL
01-Aug-10 31-Aug-10 0000-1800: 25 MW
2300-2400: 25 MW
WR-NR
61 Jun-10/AP-9755-AD
30-Jun-10
LPTL/OA/2010-11/52
dt24-Jun-10
LEUL
ARORA-CS
-BRPL
01-Aug-10 31-Aug-10 0000-1800: 8.8 MW
2300-2400: 8.8 MW
WR-NR
62 Jun-10/AP-9754-AD
30-Jun-10
LPTL/OA/2010-11/36
dt24-Jun-10
LEUL
MISL
-UT-Chd
01-Aug-10 31-Aug-10 0000-1800: 35 MW
2300-2400: 35 MW
WR-NR
63 Jun-10/AP-9753-AD
30-Jun-10
RETL/NRLDC/1150226
dt18-Jun-10
Reliance
MPPTCL
-BRPL
01-Aug-10 30-Aug-10 0900-1700: 79 MW WR-NR
64 Jun-10/AP-9752-AD
30-Jun-10
PTC/OA/10171
dt18-Jun-10
PTC
CSEB
-NDMC
01-Aug-10 31-Aug-10 1000-1800: 30 MW WR-NR
65 Jun-10/AP-9750-AD
30-Jun-10
CC/NVVN/OA/5553
dt24-Jun-10
NVVN
Tripura
-NDPL
01-Aug-10 31-Aug-10 0000-0200: 40 MW
1700-2400: 40 MW
NER-ER-NR
66 Jun-10/AP-9749-AD
30-Jun-10
NVVN/5541
dt23-Jun-10
NVVN
ASEB
-HPPC
01-Aug-10 30-Aug-10 0000-2400: 40 MW NER-ER-NR
67 Jun-10/AP-9747-AD
30-Jun-10
BRPL/OA/AUG/CONC-1
dt07-Jun-10
BRPL
HPSEB
-BRPL
01-Aug-10 13-Aug-10 0000-2400: 43 MW ----
68 Jun-10/AP-9744-AD
30-Jun-10
BRPL/OA/AUG/CONC-1
dt02-Jun-10
BRPL
UPCL
-BRPL
01-Aug-10 31-Aug-10 0000-2400: 40 MW ----
69 Jun-10/AP-9385-AD
04-Jun-10
LPTL/OA/2010-11/57
dt31-May-10
LEUL
MPPTCL
-PSEB
01-Aug-10 30-Aug-10 0000-0600: 118.14 MW
0600-1700: 14.37 MW
1700-2200: 46.26 MW
2200-2400: 118.14 MW
WR-NR
70 Jun-10/AP-9381-AD
04-Jun-10
PTC/OA/9886
dt17-May-10
PTC
TNEB
-PSEB
01-Aug-10 31-Aug-10 0000-2400: 40 MW SR-ER-NR
71 Jun-10/AP-9380-AD
04-Jun-10
NVVN/OA/5417
dt12-May-10
NVVN
MeSEB
-NDPL
01-Aug-10 30-Aug-10 1400-2200: 21.3 MW NER-ER-NR
72 Jun-10/AP-9379-AD
04-Jun-10
LPTL/OA/2010-11/42
dt28-May-10
LEUL
MPPTCL
-BYPL
01-Aug-10 30-Aug-10 0000-0600: 19.95 MW
0600-1700: 22.34 MW
1700-2200: 6.17 MW
2200-2400: 19.95 MW
WR-NR
73 Jun-10/AP-9378-AD
04-Jun-10
LPTL/OA/2010-11/41
dt28-May-10
LEUL
MPPTCL
-BRPL
01-Aug-10 30-Aug-10 0000-0600: 14 MW
0600-1700: 20.49 MW
1700-2200: 3 MW
2200-2400: 14 MW
WR-NR
74 Jun-10/AP-9376-AD
04-Jun-10
NVVN/OA/5420
dt12-May-10
NVVN
MeSEB
-NDPL
01-Aug-10 31-Aug-10 0000-0200: 40 MW
1200-2400: 40 MW
NER-ER-NR
75 Jun-10/AP-9375-AD
04-Jun-10
LPTL/OA/2010-11/35
dt28-May-10
LEUL
BALCO
-BRPL
01-Aug-10 31-Aug-10 0000-1800: 50 MW
2300-2400: 50 MW
WR-NR
76 Jun-10/AP-9374-AD
04-Jun-10
NVVN/OA/5403
dt12-May-10
NVVN
BESCOM
-NDPL
01-Aug-10 31-Aug-10 0800-1800: 70 MW SR-ER-NR
77 Jun-10/AP-9373-AD
04-Jun-10
LPTL/OA/2010-11/34
dt28-May-10
LEUL
MISL
-BRPL
01-Aug-10 31-Aug-10 0000-1800: 40 MW
2300-2400: 40 MW
WR-NR
78 Jun-10/AP-9372-AD
04-Jun-10
LPTL/OA/2010-11/33
dt28-May-10
LEUL
MISL
-BRPL
01-Aug-10 31-Aug-10 0000-1800: 20 MW
2300-2400: 20 MW
WR-NR
79 Jun-10/AP-9369-AD
04-Jun-10
PSPCL/OA/2010-11/07
dt25-May-10
PSEB
MSEDCL
-PSEB
01-Aug-10 31-Aug-10 0000-2400: 100 MW WR-NR
80 Jun-10/AP-9365-AD
04-Jun-10
26490-JPL-NDPL
dt21-May-10
TATA
JPL
-NDPL
01-Aug-10 31-Aug-10 0000-2400: 65 MW WR-NR
81 Jun-10/AP-9364-AD
04-Jun-10
LPTL/OA/2010-11/37
dt20-May-10
LEUL
MISL
-UT-Chd
01-Aug-10 31-Aug-10 0000-1800: 5 MW
2300-2400: 5 MW
WR-NR
82 Jun-10/AP-9363-AD
04-Jun-10
CC/NVVN/OA/5467
dt25-May-10
NVVN
GRIDCO
-PSEB
01-Aug-10 31-Aug-10 0000-2400: 20 MW ER-NR
83 Jun-10/AP-9362-AD
04-Jun-10
CC/NVVN/OA/5458
dt25-May-10
NVVN
WBSEDCL
-HPPC
01-Aug-10 31-Aug-10 0000-2400: 100 MW ER-NR
84 Jun-10/AP-9361-AD
04-Jun-10
CC/NVVN/OA/5415
dt25-May-10
NVVN
WBSEDCL
-HPPC
01-Aug-10 31-Aug-10 0000-2400: 100 MW ER-NR
85 Jun-10/AP-9357-AD
04-Jun-10
otc/oa/9885
dt17-May-10
PTC
GRIDCO
-PSEB
01-Aug-10 31-Aug-10 0000-2400: 44.33 MW ER-NR
86 Jun-10/AP-9356-AD
04-Jun-10
RETL/NRLDC/1150203
dt12-May-10
Reliance
NBVL(Or)
-BRPL
01-Aug-10 31-Aug-10 0000-2400: 50 MW ER-NR
87 Jun-10/AP-9355-AD
04-Jun-10
NVVN/OA/5413
dt11-May-10
NVVN
WBSEDCL
-NDPL
01-Aug-10 31-Aug-10 0000-0200: 40 MW
1200-2400: 40 MW
ER-NR
88 Jun-10/AP-9354-AD
04-Jun-10
PTC/OA/9894
dt18-May-10
PTC
MPSEB
-NDPL
01-Aug-10 31-Aug-10 0000-0600: 14 MW
0600-1700: 17 MW
2200-2400: 14 MW
WR-NR
89 Jun-10/AP-9352-AD
04-Jun-10
RETL/NRLDC/1150204
dt12-May-10
Reliance
MPPTCL
-BYPL
01-Aug-10 31-Aug-10 0000-2400: 90 MW WR-NR
90 Jun-10/AP-9351-AD
04-Jun-10
NVVN/OA/5416
dt14-May-10
NVVN
UPPCL
-NDPL
01-Aug-10 31-Aug-10 0900-1700: 70 MW ----
91 May-10/AP-9191-AD
25-May-10
067
dt12-May-10
MITTAL
MPPTCL
-UPPCL
01-Aug-10 31-Aug-10 0000-2400: 125 MW WR-NR