Generating Unit and Transmission Line Outage Report for 16-Feb-2011
Reports updated at 00.00 hrs of 17-Feb-2011

I. Planned Outages
Sl.No. Station Agency Unit No. Capacity Reason of outage Outage Date Outage Time Expected Revival Date
A. Central Sector
1 RAPS -A NPCIL 1 100 Subject to regulatory clearance 09-Oct-2004 22:58 -
2 Bhakra BBMB 2 108 Up gradation from 105 to 126 MW. 26-Apr-2010 8:00 27-Apr-2011
3 Bhakra BBMB 5 105 Up gradation from 105 to 126 MW. 22-Dec-2010 13:30 07-Mar-2011
4 Dehar BBMB 3 165 Annual maintenance 20-Oct-2010 9:00 20-Feb-2011
5 Dehar BBMB 1 165 Annual maintenance 12-Feb-2011 16:00 31-Mar-2011
6 Dehar BBMB 2 165 Annual maintenance 12-Feb-2011 16:00 31-Mar-2011
7 Dulhasti HPS NHPC 1 130 Leakage in downstream seal of MIV 12-Feb-2011 0:00 21-Feb-2011
8 Dulhasti HPS NHPC 2 130 Leakage in downstream seal of MIV 12-Feb-2011 0:00 21-Feb-2011
9 Dulhasti HPS NHPC 3 130 Leakage in downstream seal of MIV 12-Feb-2011 0:00 21-Feb-2011
10 Bhakra BBMB 10 157 Mid term maintenance 14-Feb-2011 8:00 25-Feb-2011
11 Auraiya GPS NTPC 1 165 Reserve shut down 14-Feb-2011 23:03 -
12 Anta GPS NTPC 1 140 Reserve shut down 15-Feb-2011 21:04 -
13 Dadri GPS NTPC 2 210 Reserve shut down 16-Feb-2011 8:41 -
14
15
16
17
18
19
20
B. State Sector
1 GNDTPS BHATINDA PSEB 3 110 Renovation work. 29-Dec-2009 0:00 --
2 Lehra Mohabbat TPS PSEB 1 210 Annual maintenance 16-Jan-2011 2:36 20-Feb-2011
3 Chhabra TPS RRVUNL 2 250 Oil leakage in main Tank 05-Sep-2010 19:57 28-Feb-2011
4 Panipat TPS HPGCL 2 110 Generator Rotar problem 25-Oct-2010 23:55 10-Mar-2011
5 Vishnuprayag (H) (IPP) JP Hydro 1 100 Penstock inspection work 09-Feb-2011 11:40 --
6 Vishnuprayag (H) (IPP) JP Hydro 2 100 Penstock inspection work 09-Feb-2011 11:40 --
7 Vishnuprayag (H) (IPP) JP Hydro 3 100 Penstock inspection work 09-Feb-2011 11:40 --
8 Vishnuprayag (H) (IPP) JP Hydro 4 100 Penstock inspection work 09-Feb-2011 11:40 --
9
10
11
12
13
14
15
16
17
18
19
20


II. Forced Outages
Sl.No. Station Agency Unit No. Capacity (MW) Reason of outage Outage Date Outage Time Expected Date of Restoration
A. Central Sector
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
B. State Sector
1 Obra TPS UPRVUNL 9 200 Turbine problem 30-Oct-2010 14:17 -
2 Obra TPS UPRVUNL 13 200 Boiler tube leakage/Annual Maintenance 06-Jan-2011 22:45 28-Feb-2011
3 Paricha TPS UPRVUNL 2 110 Generater fault 05-Jan-2011 7:52 25-Feb-2011
4 Lehra Mohabbat TPS PSEB 2 210 Generator Earth fault 01-Feb-2011 11:52 20-Feb-2011
5 Paricha TPS UPRVUNL 1 110 ID Fan problem 16-Feb-2011 14:34 17-Feb-2011
6 Barsingsar NLC 1 125 Boiler tripped 14-Jan-2011 7:05 -
7 Kota TPS RRVUNL 4 210 Low demand 16-Feb-2011 1:57 -
8 Chhabra TPS RRVUNL 1 250 Generater tranformer protection operated 11-Jan-2011 21:18 20-Feb-2011
9 Suratgarh TPS RRVUNL 6 250 Turbine problem 27-Jan-2011 4:50 31-Mar-2011
10 Giral LTPS RRVUNL 2 125 Boiler Tube leakage 10-Feb-2011 18:30 -
11 Barsingsar NLC 2 125 High furnace temperature 14-Feb-2011 18:38 -
12 Rajwest JSW 1 135 Problem in boiler 16-Feb-2011 22:51 17-Feb-2011
13
14
15
16
17
18
19
20


III. Generating Units Revived During Last 24 Hrs. :
Sl.No. Station Agency Unit No. Capacity Reason of Outage Outage Date Outage Time Revival Date Revival Time
A. Central Sector
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
B. State Sector
1 GNDTPS BHATINDA PSEB 1 110 Leakage in Turbine 12/Feb/2011 10:10 16/Feb/2011 20:20
2 Rajwest JSW 1 135 Cyclon ash problem 14/Feb/2011 21:47 16/Feb/2011 20:12
3 Suratgarh TPS RRVUNL 1 250 Low demand 15/Feb/2011 4:56 16/Feb/2011 20:48
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20


IV. Details of Transmission Element under Planned Outages :
Sl.No. Element Owner/Utility Voltage Level Outage Date Outage Time Revival Date Revival Time Expected Date of Revival Reasons for Outage
1 GURGAON - BHIWADI POWERGRID 400 kV 13-02-11 8:51 * * 22-02-11 Construction of new element
2 KOTA - MERTA 1 POWERGRID 400 kV 14-02-11 13:14 * * NA Construction of new element
3 KOTA - MERTA 2 POWERGRID 400 kV 14-02-11 13:14 * * NA Construction of new element
4 BASPA - JHAKRI 1 JAI PRAKASH 400 kV 15-02-11 9:15 * * 18-02-11 Protection Testing.
5 MANDOLA-WAZIBAD 4 DELHI 220 kV 29-01-11 17:40 * * 28-02-11 Construction of new element
6 BADOD-MODAK RAJASTHAN 220 kV 05-02-11 15:08 * * NA To avoid O/L of other network
7 BALLABGARH(PG) POWERGRID FACTS 05-02-11 10:48 * * NA To attend capacitor leakage
NA - Not Available *-Line not revived till time of reporting


V. Details of Transmission Element under Forced Outages  :
Sl.No. Element Owner/Utility Voltage Level Outage Date Outage Time Revival Date Revival Time Expected Date of Revival Reasons for Outage
1 NJPC - ABDULLAPUR 1 POWERGRID 400 kV 20-11-09 4:56 ** ** NA Failure of CB
2 ROORKEE- RISHIKESH UTTRAKHAND 400 kV 09-08-10 4:03 ** ** 03-04-11 Tower collapsed
3 GORAKHPUR- LUCKNOW(PG) 3 POWER LINK 400 kV 15-02-11 0:05 ** ** NA Tripped on High voltage
4 KANKROLI - JODHPUR POWERGRID 400 kV 15-02-11 2:16 15-02-11 7:29 - Tripped on High voltage
5 LUCKNOW(PG)-UNNAO 1 UP 400 kV 15-02-11 23:45 16-02-11 7:53 - Reason Awaited
6 UNNAO - BAREILLY(UP) 2 UP 400 kV 15-02-11 23:45 16-02-11 7:49 - Reason Awaited
7 BASPA - JHAKRI 2 JAI PRAKASH 400 kV 16-02-11 1:03 16-02-11 6:10 - Tripped on High voltage
8 RATANGARH - SURATGARH 1 RAJASTHAN 400 kV 16-02-11 3:40 16-02-11 14:50 - Phase to earth fault
9 JAIPUR - MERTA RAJASTHAN 400 kV 16-02-11 4:02 16-02-11 5:58 - Tripped on High voltage
10 MURADNAGAR - AGRA(UP) UP 400 kV 16-02-11 4:16 16-02-11 4:53 - Kept open due to high voltage
11 TEHRI -KOTESHWER POWERGRID 400 kV 16-02-11 5:33 16-02-11 7:08 - Reason Awaited
12 KOTESHWER-MEERUT POWERGRID 400 kV 16-02-11 5:33 16-02-11 7:08 - Reason Awaited
13 ANPARA - MAU UP 400 kV 16-02-11 21:22 16-02-11 22:13 - Transient fault
14 MAU - AZAMGARH UP 400 kV 16-02-11 21:22 16-02-11 22:50 - Transient fault
15 MURADNAGAR - AGRA(UP) UP 400 kV 16-02-11 22:21 16-02-11 22:54 - Reason Awaited
16 BASPA - JHAKRI 2 JAI PRAKASH 400 kV 17-02-11 2:57 ** ** NA Tripped on High voltage
17 MAU - AZAMGARH UP 400 kV 17-02-11 3:52 ** ** NA Transient fault
18 ANPARA - MAU UP 400 kV 17-02-11 4:06 17-02-11 4:27 - Transient fault
19 ANPARA - MAU UP 400 kV 17-02-11 4:55 ** ** NA Transient fault
20 ANPARA - SARNATH 1 UP 400 kV 17-02-11 4:56 ** ** NA Transient fault
21 UNNAO(315 MVA)-2 UP 400/220 kV 15-02-11 23:45 ** ** NA Fire in ICT
22 BUS REACTOR AT BAREILLY UP REACTOR 05-08-07 0:00 ** ** NA Failure of Reactor
23 BUS REACTOR AT LUCKNOW UP REACTOR 10-07-08 0:46 ** ** NA Failure of Reactor
24 BUS REACTOR AT SARNATH UP REACTOR 16-02-09 6:14 ** ** NA Failure of Reactor
NA - Not Available **-Shall be closed after it is declared healthy


VI. Details of Transmission Element Opened manually on High Voltages  :
Sl.No. Element Owner/Utility Voltage Level Outage Date Outage Time Revival Date Revival Time Expected Date of Revival Reasons for Outage
1 GORAKHPUR- LUCKNOW(PG) 3 POWER LINK 400 kV 03-01-11 23:08 $ $ $ Manually opened due to High Voltage.
2 HINDON - CHHABRA RAJASTHAN 400 kV 09-02-11 11:00 $ $ $ Manually opened due to High Voltage.
3 GORAKHPUR- LUCKNOW(PG) 4 POWER LINK 400 kV 09-02-11 17:04 $ $ $ Manually opened due to High Voltage.
4 BALIA - BIHARSARIFF 1 POWERGRID 400 kV 11-02-11 16:07 $ $ $ Manually opened due to High Voltage.
5 GORAKHPUR- MUZAFFARPUR 1 POWER LINK 400 kV 11-02-11 17:10 $ $ $ Manually opened due to High Voltage.
6 CHHABRA - BHILWARA RAJASTHAN 400 kV 12-02-11 12:02 $ $ $ Manually opened due to High Voltage.
7 BALIA - PATNA 1 POWERGRID 400 kV 12-02-11 17:30 $ $ $ Manually opened due to High Voltage.
8 BADMER - AKAL RAJASTHAN 400 kV 12-02-11 18:22 $ $ $ Manually opened due to High Voltage.
9 GORAKHPUR- LUCKNOW(PG) 1 POWER LINK 400 kV 14-02-11 18:11 16-02-11 9:13 - Manually opened due to High Voltage.
10 BHIWADI - BASSI 2 POWERGRID 400 kV 14-02-11 20:53 16-02-11 9:46 - Manually opened due to High Voltage.
11 BAHADURGARH -SONIPAT 1 POWERGRID 400 kV 14-02-11 21:02 16-02-11 10:47 - Manually opened due to High Voltage.
12 KISHENPUR - DULHASTI POWERGRID 400 kV 14-02-11 23:00 $ $ $ Manually opened due to High Voltage.
13 BHIWADI - MOGA 2 POWERGRID 400 kV 15-02-11 0:37 16-02-11 8:09 - Manually opened due to High Voltage.
14 MUZAFFARNAGAR- VISHNU PRAYAG 1 UP 400 kV 15-02-11 1:58 $ $ $ Manually opened due to High Voltage.
15 MERTA - JODHPUR 1 RAJASTHAN 400 kV 15-02-11 2:15 16-02-11 10:04 - Manually opened due to High Voltage.
16 JAIPUR - HINDON RAJASTHAN 400 kV 15-02-11 2:16 $ $ $ Manually opened due to High Voltage.
17 MERTA- RATANGARH RAJASTHAN 400 kV 15-02-11 4:10 16-02-11 9:45 $ Manually opened due to High Voltage.
18 MEERUT - KAITHAL 2 POWERGRID 400 kV 15-02-11 13:30 $ $ - Manually opened due to High Voltage.
19 DEHAR - BHIWANI BBMB 400 kV 15-02-11 21:02 16-02-11 6:02 - Manually opened due to High Voltage.
20 NJPC - NALAGARH 1 POWERGRID 400 kV 15-02-11 21:14 16-02-11 6:30 - Manually opened due to High Voltage.
21 BAHADURGARH -SONIPAT 2 POWERGRID 400 kV 15-02-11 21:55 $ $ $ Manually opened due to High Voltage.
22 NALAGARH - KAITHAL POWERGRID 400 kV 15-02-11 21:56 16-02-11 6:46 - Manually opened due to High Voltage.
23 DEHAR - PANIPAT BBMB 400 kV 15-02-11 22:07 16-02-11 5:36 - Manually opened due to High Voltage.
24 KANPUR - BALLABHGARH 3 POWERGRID 400 kV 15-02-11 22:29 16-02-11 7:56 - Manually opened due to High Voltage.
25 AGRA - BASSI 3 POWERGRID 400 kV 15-02-11 22:31 16-02-11 9:10 - Manually opened due to High Voltage.
26 KANPUR - BALLABHGARH 2 POWERGRID 400 kV 15-02-11 22:43 $ $ $ Manually opened due to High Voltage.
27 BAREILLY - MANDOLA 2 POWER LINK 400 kV 15-02-11 22:45 16-02-11 7:24 - Manually opened due to High Voltage.
28 ALLAHABAD - MAINPURI 1 POWERGRID 400 kV 15-02-11 22:53 16-02-11 9:17 - Manually opened due to High Voltage.
29 BALLABHGARH - MAINPURI 1 POWERGRID 400 kV 15-02-11 22:57 16-02-11 7:40 - Manually opened due to High Voltage.
30 MOGA - JALLANDHAR 1 POWERGRID 400 kV 15-02-11 23:11 16-02-11 8:11 - Manually opened due to High Voltage.
31 JALLANDHAR - CHAMERA (1) 1 POWERGRID 400 kV 15-02-11 23:30 16-02-11 8:14 - Manually opened due to High Voltage.
32 ABDULLAPUR - BAWANA 1 POWERGRID 400 kV 15-02-11 23:30 16-02-11 7:45 - Manually opened due to High Voltage.
33 AGRA - BHIWADI 1 POWERGRID 400 kV 15-02-11 23:32 16-02-11 6:42 - Manually opened due to High Voltage.
34 ALLAHABAD - SASARAM POWERGRID 400 kV 15-02-11 23:41 $ $ $ Manually opened due to High Voltage.
35 KISHENPUR - MOGA 1 POWERGRID 400 kV 15-02-11 23:42 16-02-11 6:09 - Manually opened due to High Voltage.
36 LUCKNOW(UP)-BAREILLY(PG) 1 POWERGRID 400 kV 16-02-11 0:06 16-02-11 9:32 - Manually opened due to High Voltage.
37 MEERUT - MANDOLA 1 POWERGRID 400 kV 16-02-11 0:22 16-02-11 7:57 - Manually opened due to High Voltage.
38 BALIA - LUCKNOW 1 POWERGRID 400 kV 16-02-11 0:26 $ $ $ Manually opened due to High Voltage.
39 TEHRI - MEERUT 2 POWERGRID 400 kV 16-02-11 0:38 16-02-11 6:15 - Manually opened due to High Voltage.
40 AGRA - BASSI 2 POWERGRID 400 kV 16-02-11 1:04 16-02-11 6:30 - Manually opened due to High Voltage.
41 MOGA - JALLANDHAR 2 POWERGRID 400 kV 16-02-11 1:10 16-02-11 6:06 - Manually opened due to High Voltage.
42 AGRA-AURAIYA -1 POWERGRID 400 kV 16-02-11 1:23 16-02-11 7:18 - Manually opened due to High Voltage.
43 RIHAND - ALLAHABAD 1 POWERGRID 400 kV 16-02-11 1:34 16-02-11 6:30 - Manually opened due to High Voltage.
44 KANKROLI - JODHPUR POWERGRID 400 kV 16-02-11 4:07 16-02-11 4:54 - Manually opened due to High Voltage.
45 NJPC - NALAGARH 1 POWERGRID 400 kV 16-02-11 21:11 $ $ $ Manually opened due to High Voltage.
46 DEHAR - BHIWANI BBMB 400 kV 16-02-11 21:19 $ $ $ Manually opened due to High Voltage.
47 MOGA - JALLANDHAR 1 POWERGRID 400 kV 16-02-11 21:42 $ $ $ Manually opened due to High Voltage.
48 NALAGARH - KAITHAL POWERGRID 400 kV 16-02-11 21:43 $ $ $ Manually opened due to High Voltage.
49 AGRA - BASSI 1 POWERGRID 400 kV 16-02-11 21:44 $ $ $ Manually opened due to High Voltage.
50 JALLANDHAR - CHAMERA (1) 1 POWERGRID 400 kV 16-02-11 21:45 $ $ $ Manually opened due to High Voltage.
51 BHIWADI - BASSI 2 POWERGRID 400 kV 16-02-11 21:45 $ $ $ Manually opened due to High Voltage.
52 AGRA - BHIWADI 1 POWERGRID 400 kV 16-02-11 21:46 $ $ $ Manually opened due to High Voltage.
53 BAREILLY - MANDOLA 2 POWERGRID 400 kV 16-02-11 23:16 $ $ $ Manually opened due to High Voltage.
54 LUCKNOW -BAREILLY 1 POWERGRID 400 kV 16-02-11 23:21 $ $ $ Manually opened due to High Voltage.
55 BHIWADI - MOGA 1 POWERGRID 400 kV 16-02-11 23:30 $ $ $ Manually opened due to High Voltage.
56 BAHADURGARH -SONIPAT 1 POWERGRID 400 kV 17-02-11 0:18 $ $ $ Manually opened due to High Voltage.
57 DEHAR - PANIPAT BBMB 400 kV 17-02-11 1:07 $ $ $ Manually opened due to High Voltage.
58 ABDULLAPUR - BAWANA 1 POWERGRID 400 kV 17-02-11 1:15 $ $ $ Manually opened due to High Voltage.
59 KISHENPUR - MOGA 2 POWERGRID 400 kV 17-02-11 1:15 $ $ $ Manually opened due to High Voltage.
60 ALLAHABAD - MAINPURI 1 POWERGRID 400 kV 17-02-11 1:18 $ $ $ Manually opened due to High Voltage.
61 BALLABHGARH - MAINPURI 1 POWERGRID 400 kV 17-02-11 1:27 $ $ $ Manually opened due to High Voltage.
62 NALAGARH-ADHYDRO 1 AD HYDRO IPP 220 kV 15-02-11 21:28 16-02-11 17:03 - Manually opened due to High Voltage.
63 NALAGARH-ADHYDRO 2 AD HYDRO IPP 220 kV 15-02-11 21:28 16-02-11 16:22 - Manually opened due to High Voltage.
64 NALAGARH-ADHYDRO 1 AD HYDRO IPP 220 kV 16-02-11 21:37 $ $ $ Manually opened due to High Voltage.
65 NALAGARH-ADHYDRO 2 AD HYDRO IPP 220 kV 16-02-11 21:37 $ $ $ Manually opened due to High Voltage.
66 MAINPURI POWERGRID FACTS 07-02-11 3:17 $ $ $ Manually opened due to High Voltage.
$-Line Shall be closed subject to voltage permissibility