Voltage Analysis For 400 KV Singrauli Substation For : 15-04-2005
A. Voltage Trend:
(Note: The figures shown above are indicative only and are calculated based on data acquired from remote locations
in Northern Region over existing communication links.)
B. Voltage Duration Curve:
(Note: The figures shown above are indicative only and are calculated based on data acquired from remote locations
in Northern Region over existing communication links.)
C. Summary Report:
| Voltage Greater Than | Percentage of Time |
| 440 | 0 |
| 430 | 0 |
| 420 | 0 |
| 412 | 64.6 |
| 388 | 100 |
| 380 | 100 |
| 370 | 100 |
| 360 | 100 |
| Maximum KV | 417 KV at 18:30 Hrs. |
| Minimum KV | 409 KV at 04:34 Hrs. |
| Average KV | 412 KV |
| % of Time Voltage | (All values in %) |
| Between 388-412 KV | 35.40 |
| Between 360-420 KV | 100.00 |
| <360 KV | 00.00 |
| <370 KV | 00.00 |
| <380 KV | 00.00 |
| <388 KV | 00.00 |
| >412 KV | 64.60 |
| >420 KV | 00.00 |
| >430 KV | 00.00 |
| >440 KV | 00.00 |
D. Hourly Values:
| Hour | KV | Hour | KV |
| 01:00 | 412 | 13:00 | 400 |
| 02:00 | 413 | 14:00 | 400 |
| 03:00 | 412 | 15:00 | 400 |
| 04:00 | 411 | 16:00 | 412 |
| 05:00 | 411 | 17:00 | 414 |
| 06:00 | 410 | 18:00 | 414 |
| 07:00 | 410 | 19:00 | 413 |
| 08:00 | 412 | 20:00 | 412 |
| 09:00 | 413 | 21:00 | 412 |
| 10:00 | 413 | 22:00 | 412 |
| 11:00 | 411 | 23:00 | 413 |
| 12:00 | 411 | 24:00 | 414 |