Voltage Analysis For 220 KV Jullundhar Substation For :   19-11-2004

A. Voltage Trend:























B. Voltage Duration Curve:


(Note: The figures shown above are indicative only and are calculated based on data acquired from remote locations
in Northern Region over existing communication links.)

C. Summary Report:

Voltage Greater Than Percentage of Time
245 0.07
240 0.56
230 51.63
227 75.63
213 98.93
210 98.93
200 98.93
190 98.93
Maximum KV 004 KV at 23:43 Hrs.
Minimum KV 000 KV at 23:43 Hrs.
Average KV 228 KV
% of Time Voltage (All values in %)
Between 213-227 KV 23.30
Between 200-245 KV 53.37
<190 KV 01.08
<200 KV 01.08
<210 KV 01.08
<213 KV 01.08
>227 KV 75.63
>230 KV 51.63
>240 KV 00.56
>245 KV 00.07

D. Hourly Values:

Hour KV Hour KV
01:00 239 13:00 227
02:00 236 14:00 224
03:00 236 15:00 229
04:00 235 16:00 227
05:00 234 17:00 227
06:00 231 18:00 224
07:00 232 19:00 225
08:00 234 20:00 230
09:00 230 21:00 231
10:00 226 22:00 234
11:00 228 23:00 234
12:00 225 24:00 234