| PARTICULARS | MORNING PEAK 0900 HRS. OF 15.04.2005 (MW) | EVENING PEAK 1900 HRS. OF 14.04.2005 (MW) | TOTAL ENERGY FOR 14.04.2005 NET MU |
| Demand Met | 2240 MW | 2781 MW | 53.00 MU |
| DVB's Generation(IP+GT+RGT) | 741 MW | 716 MW | 15.90 MU |
|
Badarpur TPS (Ex-Bus) |
437 MW | 450 MW | 10.90 MU |
| Import From Grid | 1062 MW | 1615 MW | 26.20 MU |
| Schedule | 1343 MW | 1522 MW | 28.60 MU |
| Overdrawal | -281 MW | 93 MW | -2.40 MU |
| Regulated Overdrawl | -239 MW | 147 MW | - |
ON 14.04.2005 DELHI MET A MAX. DEMAND OF 2781 MW AT 20:00 HRS WITH OVER DRAWAL OF 93 MW.
| GRID PARAMETERS |
THIS MORNING |
LAST EVENING |
| Gross Generation | 18500 MW | 20600 MW |
| Average Peaking Frequency | 49.38 HZ | 49.35 HZ |
| 400 KV Bus Voltage at Dadri | 400-404 KV | 402-409 KV |
| 220 KV Bus Voltage at BTPS | 212-215 KV | 214-218 KV |