POWER GRID CORPORATION OF INDIA LTD.
Northern Regional Load Despatch Center
18-A, Qutub Institutional Area
New Delhi 110 016

Generating Unit and Transmission Line Outage Report for 06.12.2004
Report updated at 06:00 hrs. of

I. Generating Unit Revived During Last 24 Hrs.:

Sr. No. Station Unit No. Capacity Outage Date Outage Time Revival Date Revival Time Reason Of Outage
A. Central Sector
1 BTPS 2 95 05.12.2004 04.45 05.12.2004 09.09 Ecentricity high.
2 BTPS 3 95 05.12.2004 13.07 05.12.2004 14.41 Spurious tripping
3
4
5
6
7
8
9
10
B. State Sector
1 OBRA 10 200 04.12.2004 09.23 05.12.2004 12.48 ID fan problem
2 PANIPAT 6 210 05.12.2004 09.21 05.12.2004 10.23 Flame failure
3 OBRA 12 200 05.12.2004 16.56 06.12.2004 05.27 UAT problem
4
5
6
7
8
9
10

II. Generating Unit Outage Report:

Sr. No. Station Unit No. Capacity (MW) Outage Date Outage Time Expected Date of Restoration Reason Of Outage
A. Central Sector
1 ANTA(GT) 3 143 28.11.2004 00.36 12.12.2004 Annual Inespection
2 NJPC 3 250 29.09.2004 13.00 ------- Turbine problem.
3 RAPP ( A ) 1 100 09.10.2004 22.58 ------- Station fault.
4 AURAIYA (GT) 4 166 17.10.2004 12.35 31.01.2005 Rotor damaged.
5 NJPC 6 250 13.11.2004 10.00 --------- Annual maintenance.
6 CHAMERA - I I 2 100 04.12.2004 05.50 --------- High vibration in Bearing
7 DEHAR 1 165 04.10.2004 09.20 21.01.2005 Capital maintenance
8 BHAKRA ( L ) 2 108 02.12.2004 00.00 15.12.2004 Maintenace work.
9 BHAKRA ( R ) 6 157 23.11.2004 08.40 11.12.2004 Mid term maintenance
10
11
12
13
14
15
B. State Sector
1 BHATINDA 2 110 09.03.2004 12.05 12.01.2005 Capital maintenance .
2 BHATINDA 4 110 31.10.2004 15.35 15.12.2004 Annual maintenance.
3 ROPAR 2 210 06.11.2004 01.15 06.12.2004 Annual maintenance.
4 ANPARA 5 500 17.11.2004 12.58 12.12.2004 Overhauling.
5 OBRA 11 200 05.12.2004 11.24 06.12.2004 Air preheater leakage
6 ANPARA 3 210 06.12.2004 03.59 06.12.2004 Drum level low
7
8
9
10
11
12
13
14
15

III. Transmission Lines Revived During Last 24 Hrs.:

Sr. No. Name of Line Voltage Level Outage Date Outage Time Revival Date Revival Time Reason Of Outage
A. Central Sector/Joint Sector
1 A'PUR-BAWANA-1 400 05.12.2004 01.13 05.12.2004 10.24 High Voltage.
2
3
4
5
6
7
8
9
10
B. State Sector
1 AGRA-UNNAO 400 05.12.2004 08.50 05.12.2004 9.18 Relay maloperation
2
3
4
5
6
7
8
9
10

IV. Transmission Line Outage Report:

Sr. No. Name Of Line Voltage Level Outage Date Outage Time Expected Date of Restoration Reason Of Outage
A. Central Sector/Joint Sector
1 AURAIYA -MALANPUR 220 20.07.2004 20.41 -------- Transformer problem at Malanpur (MPSEB).
2 NALAGARH - NJPC - II 400 01.12.2004 11.51 -------- High voltage.
3 NJPC-ABDULLAPUR- I 400 28.11.2004 20.11 -------- High voltage.
4 HISSAR - NAL'GARH ( I ) 400 04.12.2004 22.11 -------- High voltage.
5 CHAMERA - J'DHAR-I 400 04.12.2004 19.06 -------- High voltage.
6 J'DHAR - MOGA - I 400 05.12.2004 02.13 -------- High voltage.
7
8
9
10
11
12
13
14
15
B. State Sector
1 AGRA-MURADNAGAR 400 04.12.2004 10.31 07.12.2004 S/D for insulators cleaning.
2
3
4
5
6
7
8
9
10
11
12
13
14
15