POWER GRID CORPORATION OF INDIA LTD.
Northern Regional Load Despatch Center
18-A, Qutub Institutional Area
New Delhi 110 016

Generating Unit and Transmission Line Outage Report for 14.12.2004
Report updated at 06:00 hrs. of

I. Generating Unit Revived During Last 24 Hrs.:

Sr. No. Station Unit No. Capacity Outage Date Outage Time Revival Date Revival Time Reason Of Outage
A. Central Sector
1
2
3
4
5
6
7
8
9
10
B. State Sector
1 SURATGARH 5 250 13.12.2004 05.13 13.12.2004 09.01 Pressure rise in turbine.
2 PANIPAT 2 110 12.12.2004 05.28 13.12.2004 10.50 Re-heater tube leakage.
3 ANPARA 1 210 12.12.2004 18.29 13.12.2004 20.41 P A Fan problem.
4
5
6
7
8
9
10

II. Generating Unit Outage Report:

Sr. No. Station Unit No. Capacity (MW) Outage Date Outage Time Expected Date of Restoration Reason Of Outage
A. Central Sector
1 NJPC 3 250 29.09.2004 13.00 --------- Turbine problem.
2 DEHAR 1 165 04.10.2004 09.20 21.01.2005 Capital maintenance.
3 RAPP ( A ) 1 100 09.10.2004 22.58 --------- Station fault.
4 AURAIYA (GT) 4 166 17.10.2004 12.35 31.01.2005 Rotor damaged.
5 NJPC 6 250 13.11.2004 10.00 --------- Annual maintenance.
6 ANTA(GT) 3 143 28.11.2004 00.36 14.12.2004 Annual Inspection.
7 BHAKRA ( L ) 2 108 02.12.2004 00.00 15.12.2004 Maintenace work.
8 CHAMERA - I I 2 100 04.12.2004 05.50 21.12.2004 Bearing vibration High.
9 BHAKRA ( R ) 10 157 08.12.2004 08.25 20.12.2004 Mid term maintenance.
10
11
12
13
14
15
B. State Sector
1 BHATINDA 2 110 09.03.2004 12.05 12.01.2005 Capital maintenance .
2 BHATINDA 4 110 31.10.2004 15.35 15.12.2004 Annual maintenance.
3 ROPAR 2 210 06.11.2004 01.15 20.12.2004 Annual maintenance.
4 ANPARA 5 500 17.11.2004 12.58 14.12.2004 Overhauling.
5 ANPARA 3 210 13.12.2004 19.05 14.12.2004 ID Fan problem.
6 KOTA 2 110 13.12.2004 03.55 15.12.2004 Boiler tube leakage.
7 OBRA 10 200 13.12.2004 00.53 15.12.2004 Boiler tube leakage.
8
9
10
11
12
13
14
15

III. Transmission Lines Revived During Last 24 Hrs.:

Sr. No. Name of Line Voltage Level Outage Date Outage Time Revival Date Revival Time Reason Of Outage
A. Central Sector/Joint Sector
1 NJPC-ABDULLAPUR- I 400 28.11.2004 20.11 13.12.2004 19.06 High voltage.
2 NALAGARH - HISSAR - I 400 12.12.2004 21.46 13.12.2004 09.40 High voltage.
3 JAL'DHAR - MOGA - I 400 11.12.2004 22.15 13.12.2004 18.46 High voltage.
4
5
6
7
8
9
10
B. State Sector
1 ANPARA-MAU 400 13.12.2004 15.36 13.12.2004 16.13 Earth fault
2
3
4
5
6
7
8
9
10

IV. Transmission Line Outage Report:

Sr. No. Name Of Line Voltage Level Outage Date Outage Time Expected Date of Restoration Reason Of Outage
A. Central Sector/Joint Sector
1 AURAIYA -MALANPUR 220 20.07.2004 20.41 -------- Transformer problem at Malanpur (MPSEB).
2 NJPC-ABDULLAPUR- II 400 13.12.2004 21.32 -------- High voltage.
3 NALAGARH - NJPC - II 400 01.12.2004 11.51 -------- High voltage.
4 CHAMERA - JAL'DHAR-I 400 04.12.2004 19.06 -------- High voltage.
5 JAL'DHAR - MOGA - I 400 13.12.2004 22.01 -------- High voltage.
6 NALAGARH - HISSAR - I 400 13.12.2004 19.12 -------- High voltage.
7 KISHENPUR- DULHASTI 400 12.12.2004 22.11 -------- High voltage.
8
9
10
11
12
13
14
15
B. State Sector
1 AGRA -MURAD NAGAR 400 04.12.2004 10.31 15.12.2004 S/D for insulators cleaning.
2
3
4
5
6
7
8
9
10
11
12
13
14
15