I. Generating Unit Revived During Last 24 Hrs.:
| Sr. No. | Station | Unit No. | Capacity | Outage Date | Outage Time | Revival Date | Revival Time | Reason Of Outage |
| A. Central Sector | ||||||||
| 1 | ANTA ( GT ) | 3 | 89 | 10.04.2005 | 01.25 | 15.04.2005 | 08.43 | E.O.H inspection. |
| 2 | BTPS | 2 | 95 | 15.04.2005 | 09.32 | 15.04.2005 | 13.47 | Lube oil pressure low. |
| 3 | DADRI ( T) | 2 | 210 | 15.04.2005 | 11.32 | 15.04.2005 | 12.50 | Tripped during chang over of ICT. |
| 4 | UNCHAHAR | 4 | 210 | 15.04.2005 | 20.29 | 16.04.2005 | 01.17 | E.H.C problem. |
| 5 | RAPP ( A) | 2 | 220 | 13.04.2005 | 11.04 | 15.04.2005 | 07.25 | Station fault |
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| B. State Sector | ||||||||
| 1 | SURATGARH | 2 | 250 | 15.04.2005 | 15.44 | 15.04.2005 | 17.56 | Drum level low. |
| 2 | PANIPAT | 4 | 110 | 14.04.2005 | 19.47 | 15.04.2005 | 20.20 | Ecnomiser tube leakage. |
| 3 | ROPAR | 5 | 210 | 14.04.2005 | 23.00 | 15.04.2005 | 08.00 | Bus fault at 220 KV Malerkotla S/S |
| 4 | BHATINDA | 4 | 110 | 13.04.2005 | 23.04 | 15.04.2005 | 18.10 | Boiler tube leakage |
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
II. Generating Unit Outage Report:
| Sr. No. | Station | Unit No. | Capacity (MW) | Outage Date | Outage Time | Expected Date of Restoration | Reason Of Outage | |
| A. Central Sector | ||||||||
| 1 | DADRI(TH) | 1 | 210 | 30.03.2005 | 11.23 | 30.04.2005 | Annual maintenance. | |
| 2 | NJPC | 6 | 250 | 13.11.2004 | 10.00 | --------- | Annual maintenance. | |
| 3 | AURAIYA (GT) | 4 | 111 | 17.10.2004 | 12.35 | ---------- | Rotor damaged. | |
| 4 | DEHAR | 5 | 165 | 12.04.2005 | 23.45 | 17.04.2005 | G. T problem. | |
| 5 | DEHAR | 2 | 165 | 21.02.2005 | 09.00 | 11.06.2005 | Capital maintenance. | |
| 6 | SINGRAULI | 5 | 200 | 09.04.2005 | 23.12 | 16.04.2005 | Replacement of H2 gas inlet valve | |
| 7 | SINGRAULI | 1 | 200 | 27.03.2005 | 02.11 | 12.05.2005 | Annual maintenance. | |
| 8 | RAPP ( B) | 4 | 220 | 31.03.2005 | 22.01 | 26.04.2005 | Annual maintenance. | |
| 9 | RAPP ( A ) | 1 | 100 | 09.10.2004 | 22.58 | --------- | Station fault. | |
| 10 | BTPS | 4 | 210 | 31.03.2005 | 14.49 | 17.04.2005 | Maintenance work. | |
| 11 | TANDA | 4 | 110 | 08.04.2005 | 01.20 | 30.04.2005 | Annual maintenance. | |
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||
| B. State Sector | ||||||||
| 1 | ROPAR | 6 | 210 | 16.04.2005 | 03.20 | 30.05.2005 | Annual maintenance. | |
| 2 | BHATINDA | 2 | 110 | 09.03.2004 | 12.05 | 30.04.2005 | Capital maintenance . | |
| 3 | ROPAR | 3 | 210 | 05.04.2005 | 00.00 | 19.04.2005 | Annual maintenance. | |
| 4 | KOTA | 3 | 210 | 11.04.2005 | 12.10 | 02.05.2005 | Annual maintenance. | |
| 5 | PANIPAT | 3 | 110 | 18.03.2005 | 13.40 | 30.04.2005 | Annual maintenance. | |
| 6 | PANIPAT | 2 | 110 | 03.01.2005 | 18.25 | ---------- | Barring gear problem. | |
| 7 | LEHRAMOHBAT | 1 | 210 | 16.04.2005 | 00.55 | 16.05.2005 | Annual maintenance. | |
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||
III. Transmission Lines Revived During Last 24 Hrs.:
| Sr. No. | Name of Line | Voltage Level | Outage Date | Outage Time | Revival Date | Revival Time | Reason Of Outage | |
| A. Central Sector/Joint Sector | ||||||||
| 1 | BTPS - ALWAR | 220 | 14.04.2005 | 14.20 | 15.04.2005 | 18.05 | B - phase E/ F | |
| 2 | KANPUR - BALLB | 400 | 15.04.2005 | 16.52 | 15.04.2005 | 16.58 | During protection testing. | |
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| B. State Sector | ||||||||
| 1 | AURIYA - MALANPUR - I I | 220 | 14.04.2005 | 23.51 | 15.04.2005 | 21.1 | Differential protection operated. | |
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
IV. Transmission Line Outage Report:
| Sr. No. | Name Of Line | Voltage Level | Outage Date | Outage Time | Expected Date of Restoration | Reason Of Outage | ||
| A. Central Sector/Joint Sector | ||||||||
| 1 | HISSAR -NALAGARH - I | 400 | 23.03.2005 | 21.28 | -------- | High voltage. | ||
| 2 | NJPC - NALAGARH - I | 400 | 22.03.2005 | 23.28 | -------- | High voltage. | ||
| 3 | JAL'DHAR - MOGA - I | 400 | 26.03.2005 | 09.34 | -------- | High voltage. | ||
| 4 | KISHANPUR-MOGA-II | 400 | 12.04.2005 | 01.04 | -------- | High voltage. | ||
| 5 | FACT OF KAN - BALLB | 400 | 14.04.2005 | 08.28 | 17.04.2005 | MOV Repiar work. | ||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||
| B. State Sector | ||||||||
| 1 | ANPARA - SARNATH | 400 | 10.03.2005 | 17.20 | 22.04.2005 | 3 No. of Towers damaged. | ||
| 2 | KISHANPUR - PAMPR - I I | 220 | 07.04.2005 | 20.27 | -------- | Blasting of Tower no-164 | ||
| 3 | MURAD - RISEKESH | 400 | 14.04.2005 | 11.02 | ------ | B - phase LA Damage at Muradnagar end. | ||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||