Generating Unit Outage Report:
| Sr. No. | Station | Unit No. | Capacity (MW) | Outage Date | Outage Time | Expected Date of Restoration | Reason Of Outage | |
| A. Central Sector | ||||||||
| 1 | RAPP ( A ) | 1 | 100 | 09.10.2004 | 22.58 | -------- | Station fault. | |
| 2 | NJPC | 2 | 250 | 28.10.2005 | 08.00 | -------- | Annual maintenance. | |
| 3 | NJPC | 6 | 250 | 14.01.2006 | 10.3 | -------- | Annual maintenance. | |
| 4 | NJPC | 5 | 250 | 31.01.2006 | 21.18 | -------- | Annual maintenance. | |
| 5 | NAPP | 1 | 220 | 31.10.2005 | 23.57 | 30.10.2006 | Replacement of coolant channels. | |
| 6 | TANAKPUR | 1 to 3 | 93 | 30.01.2006 | 11.04 | 06.02.2006 | Inspection & Repairing of Channel. | |
| 7 | BASAPA | 1 | 100 | 19.01.2006 | 07.25 | -------- | Damage in Baspa S/S Due to landslide. | |
| 8 | BASAPA | 2 | 100 | 19.01.2006 | 07.25 | -------- | Damage in Baspa S/S Due to landslide. | |
| 9 | BASAPA | 3 | 100 | 19.01.2006 | 07.25 | -------- | Damage in Baspa S/S Due to landslide. | |
| 10 | FARIDABAD (GAS) | 1 | 200 | 29.01.2006 | 22.45 | 03.02.2006 | Maintenance work. | |
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||
| B. State Sector | ||||||||
| 1 | PANIPAT | 3 | 110 | 01.01.2006 | 21.2 | -------- | Turbine vibration high. | |
| 2 | ANPARA | 2 | 210 | 07.01.2006 | 21.25 | -------- | Generator transformer problem. | |
| 3 | ROPAR | 1 | 210 | 01.01.2006 | 02.15 | 15.02.2006 | Annual maintenance. | |
| 4 | SURATGARH | 4 | 250 | 02.02.2006 | 03.48 | 02.02.2006 | F.D.Fan tripped. | |
| 5 | OBRA | 13 | 200 | 01.02.2006 | 03.00 | 04.02.2006 | Boiler tube leakage | |
| 6 | ROPAR | 4 | 210 | 01.02.2006 | 17.00 | 04.02.2006 | Boiler tube leakage | |
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||