Generating Unit Outage Report:
| Sr. No. | Station | Unit No. | Capacity (MW) | Outage Date | Outage Time | Expected Date of Restoration | Reason Of Outage | |
| A. Central Sector | ||||||||
| 1 | RAPP ( A ) | 1 | 100 | 09.10.2004 | 22.58 | -------- | Station fault. | |
| 2 | NJPC | 2 | 250 | 28.10.2005 | 08.00 | -------- | Annual maintenance. | |
| 3 | DADRI ( GT ) | 1 | 130 | 01.04.2006 | 02.49 | 03.04.2006 | Gas prassure problem | |
| 4 | NAPP | 1 | 220 | 31.10.2005 | 23.57 | 30.10.2006 | Replacement of coolant channels. | |
| 5 | ANTA(GT) | 2 | 89 | 21.03.2006 | 00.09 | 23.04.2006 | Major VOH inspection. | |
| 6 | DEHAR | 5 | 165 | 16.02.2006 | 09.15 | 24.05.2006 | Capital maintenance. | |
| 7 | RIHAND | 3 | 500 | 01.04.2006 | 00.40 | 12.04.2006 | Overhauling ' before PG test. | |
| 8 | RIHAND | 1 | 500 | 24.03.2006 | 21.02 | 31.04.2006 | Generator Excitation problem. | |
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||
| B. State Sector | ||||||||
| 1 | MALANA ( HEP ) IPP | 1 & 2 | 86 | 20.01.2006 | 10.00 | 01.05.2006 | Annual maintenance. | |
| 2 | PANIPAT | 3 | 110 | 01.01.2006 | 21.2 | -------- | Turbine vibration high. | |
| 3 | RSD | "1 | 2 | 3 | 4" | 600 | 28.03.2006 | |
| 4 | PANIPAT | 5 | 210 | 26.02.2006 | 02.17 | 10.04.2006 | Annual maintenance. | |
| 5 | BHATINDA | 1 | 110 | 06.03.2006 | 19.00 | 30.09.2006 | Renovation. | |
| 6 | BHATINDA | 3 | 110 | 11.03.2006 | 20.35 | 11.04.2006 | Annual maintenance. | |
| 7 | BASPA (3 x 100) | "1 | 2 | 3" | 300 | 19.01.2006 | 07.25 | |
| 8 | OBRA | 12 | 200 | 27.03.2006 | 01.02 | 12.05.2006 | Maintenance work. | |
| 9 | ANPARA | 2 | 210 | 26.03.2006 | 06.56 | 05.04.2006 | Gen.Transformer problem (Bushing damaged). | |
| 10 | OBRA | 10 | 200 | 29.03.2006 | 02.38 | 06.04.2006 | Boiler tube leakage. | |
| 11 | OBRA | 11 | 200 | 03.04.2006 | 05.28 | 03.04.2006 | Tripped in jerk. | |
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||