Salient Features
|
1) |
Installed generation capacity (as on 31st March, 2000)
|
|
26469.92 MW |
|
|
2) |
Effective generation capacity (as on 31st March, 2000)
|
|
25957.06 MW |
|
|
3) |
Largest Generating Stations --Thermal (coal fired) --Hydro --Nuclear --Thermal (gas fired)
|
Singrauli STPS (NTPC) Bhakra Complex (BBMB) RAPS Complex (NPC) Dadri GPS (NTPC) |
2000 MW 1437.65 MW 520 MW 829.78 MW |
|
|
4) |
Largest generating unit size --Thermal (coal fired) --Nuclear --Hydro --Thermal (gas fired)
|
Singrauli/Rihand/Anpara Narora APS/RAPS-B Chamera Faridabad GPS |
500 MW 220 MW 180 MW 143 MW |
|
|
5) |
Largest transmission elements
Longest-400 kV line-- Singrauli-Kanpur-I
Largest ICT-400/220 kV ICTs at Bhiwani/Dadri/S/Stn.
|
434 Kms.
500 MVA |
||
|
6) |
Transmission system (as on 31st March 2000) |
+ 500 kV HVDC 400 kV 220 kV Total
|
1630 ckt. kms. 11065 ckt. kms. 22247 ckt. kms. 37942 ckt. kms. |
|
|
7) |
No. of generating units (Thermal/nuclear) |
500 MW 200/210/220/250 MW 100/110 MW 50/55/60/62.5/67.5 MW |
6 nos. 41 nos. 26 nos. 18 nos.
|
|
|
8) |
Regional peak met (1999-2000)
|
19341 MW |
||
|
9) |
Regional Peak demand (1999-2000)
|
21083 MW |
||
|
10) |
Average energy consumption (1999-2000)
|
350.73 MU / day |
||
|
11) |
Average energy requirement (1999-2000) |
375.44 MU / day |
||