UI Tariff Structure currently in force

 **************************************** ****************************************

    Average Frequency of time-block                  UI Rate (P/kWh)             

 ---------------------------------------- ----------------------------------------

    50.5 Hz and above                                     0.00                   

    Below 50.50 Hz and upto 50.48 Hz                      5.60                   

    Below 49.04 Hz and upto 49.02 Hz                    414.40                   

    Below 49.02 Hz                                      420.00                   

    Between 50.50 Hz and 49.02 Hz               Linear in 0.02 Hz steps          

                                               @ 5.6 P/kWh for each step         

 **************************************** ****************************************

 ABSTRACT OF UNSCHEDULED INTERCHANGES FOR THE PERIOD - 08/09/2003 TO 14/09/2003

                                                       (All figs. in Rs. Lakh)

 ---------------------------------------------------------------------------------

 Utilities and UI payable by them             Utilities and UI receivable by them

 ---------------------------------------------------------------------------------

 U.P.                      1367.03465    :    H.P.                       518.37970

 HARYANA                    601.58448    :    UTTARANCHAL                451.71643

 J & K                      189.60885    :    RAJASTHAN                  450.08271

 W.R.E.B.*                  166.69015    :    NTPC                       410.71314

 RAILWAYS                    26.69107    :    DELHI                      355.50584

 CHANDIGARH                   0.07600    :    NHPC                        72.12676

                                         :    PUNJAB                      38.97268

                                         :    E.R.E.B.*                   33.47013

                                         :    EREB VIA BIHAR              20.38585

                                         :    M.P.                         0.33196

 ---------------------------------------------------------------------------------

 Total                     2351.68520    :    Total                     2351.68520

 ---------------------------------------------------------------------------------

 NOTE : Unscheduled interchanges of central sector and Inter-regional sources have

        been determined with reference to their schedule at the point of injection

        but those of SEBs with reference to their ex-periphery schedule. Datum

        for working out UI not being same for all entities, this has resulted

        in UI MISMATCH which has been equalised by averaging the two ON DAILY BASIS

as agreed in 112th meeting of Commercial Committee held on 29.08.03.

 * : UI over HVDC I.R. links retained without adjustment.

 ---------------------------------------------------------------------------------

    ABSTRACT OF CONSTITUENT-WISE U.I. FOR THE PERIOD - 08/09/2003 TO 14/09/2003

                                                       (All figs. in Rs. Lakh)

 ---------------------------------------------------------------------------------

 Utilities and UI payable by them             Utilities and UI receivable by them

 ---------------------------------------------------------------------------------

 U.P.                      1367.03465    :    H.P.                       518.37970

 HARYANA                    601.58448    :    UTTARANCHAL                451.71643

 J & K                      189.60885    :    RAJASTHAN                  450.08271

 W.R.E.B.*                  166.69015    :    DELHI                      355.50584

 RAILWAYS                    26.69107    :    DADRI GPP                  179.04779

 CHANDIGARH                   0.07600    :    AURAIYA GPP                126.91013

                                         :    DADRI TPS                   42.64448

                                         :    PUNJAB                      38.97268

                                         :    SALAL HEP                   35.26101

                                         :    E.R.E.B.*                   33.47013

                                         :    URI HEP                     26.08224

                                         :    ANTA GPP                    24.66936

                                         :    EREB VIA BIHAR              20.38585

                                         :    SINGRAULI STPS              12.84724

                                         :    RIHAND STPS                  9.54439

                                         :    UNCHAHAR-II TPS              8.96077

                                         :    UNCHAHAR-I TPS               6.08898

                                         :    CHAMERA HEP                  5.20561

                                         :    TANAKPUR HEP                 4.59506

                                         :    BAIRASIUL HEP                0.98284

                                         :    M.P.                         0.33196

 ---------------------------------------------------------------------------------

 Total                     2351.68520    :    Total                     2351.68520

 ---------------------------------------------------------------------------------

 

---------------------------------------------------------------------------------

 Average trans. loss in the grid during the period of A/c

                                   1.60 %

 ---------------------------------------------------------------------------------

 

 DETAILS OF TIME-BLOCKS OF SUSPENSION OF U.I. DUE TO TRANS. CONSTRAINTS

 ---------------------------------------------------------------------------------

   Date    Time-block  STATION-NAME                          Reason

 ---------------------------------------------------------------------------------

 08/09/2003   56-57        URI              TRIPPING OF KISHENPUR-PAMPORE

 10/09/2003   49-52        URI              TRIPPING OF KISHENPUR-PAMPORE

 10/09/2003   58-59        URI              TRIPPING OF KISHENPUR-PAMPORE

 10/09/2003   77-79        E.R.             TRIPPING OF SASARAM HVDC STATION

 11/09/2003    2-4       TANAKPUR           TRIPPING OF TANAKPUR-C.B.GUNJ

 ---------------------------------------------------------------------------------

 

 DETAILS OF TIME-BLOCKS OF SUSPENSION OF U.I. DUE TO GRID DISTURBANCE

 ---------------------------------------------------------------------------------

   Date    Time-block                              Reason

 ---------------------------------------------------------------------------------

                                        -- NIL --

 ---------------------------------------------------------------------------------

 

 NOTE:- The schedule of URI has been replaced with its actual generation during the

        above mentioned time blocks on 08-09-03 and 10-09-03 in line with the methodology circulated by NRLDC vide letter dated 24-07-03.


 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 CHANDIGARH         37.02474    36.15441         0.44757         0.43995

 09/09/2003 CHANDIGARH         36.83674    37.76082         0.37230         0.37710

 10/09/2003 CHANDIGARH         35.82572    38.16841         4.45597         4.64623

 11/09/2003 CHANDIGARH         36.06020    36.96968         0.68308         0.70833

 12/09/2003 CHANDIGARH         35.70492    36.67991         1.35822         1.36338

 13/09/2003 CHANDIGARH         35.87168    34.98240        -0.63948        -0.63074

 14/09/2003 CHANDIGARH         35.96919    32.42923        -6.88998        -6.82825

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)     253.29319   253.14486        -0.21232         0.07600

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 DELHI             365.29309   325.74805       -34.95805       -35.30592

 09/09/2003 DELHI             359.80970   353.39550       -17.25915       -17.05034

 10/09/2003 DELHI             347.31218   347.45003         0.77079         0.80370

 11/09/2003 DELHI             350.79347   321.60748       -46.40645       -44.73164

 12/09/2003 DELHI             358.46467   309.92441      -103.57014      -103.18372

 13/09/2003 DELHI             375.65466   314.59886       -88.99654       -87.78085

 14/09/2003 DELHI             353.48320   310.72339       -68.87410       -68.25707

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    2510.81097  2283.44772      -359.29364      -355.50584

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 HARYANA           299.53526   344.16437        50.63608        49.77377

 09/09/2003 HARYANA           284.95587   359.02797       136.07382       137.82689

 10/09/2003 HARYANA           289.48575   345.15741       121.15762       126.33085

 11/09/2003 HARYANA           325.41774   363.82838        67.35520        69.84545

 12/09/2003 HARYANA           315.41510   332.57436        25.34031        25.43662

 13/09/2003 HARYANA           305.87154   347.70287        72.07971        73.10771

 14/09/2003 HARYANA           310.60621   376.24316       118.12997       119.26319

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    2131.28747  2468.69852       590.77271       601.58448

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 H.P.               23.64806   -48.47719       -72.94587       -73.67176

 09/09/2003 H.P.               23.88844   -48.47787      -127.03881      -125.50183

 10/09/2003 H.P.               12.57135   -49.15728      -133.00711      -127.68326

 11/09/2003 H.P.               -6.30941   -40.08020       -57.60952       -55.53039

 12/09/2003 H.P.              -11.70326   -37.70800       -46.78571       -46.61115

 13/09/2003 H.P.              -16.69247   -29.10167       -20.31534       -20.03783

 14/09/2003 H.P.               -4.75228   -43.75092       -69.97034       -69.34348

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)      20.65043  -296.75313      -527.67270      -518.37970

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 J & K             119.91574   130.81538        19.11662        18.79107

 09/09/2003 J & K             117.74088   132.47551        28.57497        28.94311

 10/09/2003 J & K             122.73956   132.68159        23.56599        24.57222

 11/09/2003 J & K             118.31814   143.70006        49.41539        51.24237

 12/09/2003 J & K             118.90816   137.84498        39.85714        40.00863

 13/09/2003 J & K             120.85630   129.08444        17.16843        17.41329

 14/09/2003 J & K             123.67467   126.33417         8.55608         8.63816

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)     842.15345   932.93613       186.25462       189.60885

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 PUNJAB            422.73900   446.54032        25.08423        24.65706

 09/09/2003 PUNJAB            418.37018   415.17659       -16.66923       -16.46756

 10/09/2003 PUNJAB            416.97254   426.04263        15.66128        16.32999

 11/09/2003 PUNJAB            419.52115   454.09752        48.91030        50.71861

 12/09/2003 PUNJAB            432.38708   423.77572       -30.79679       -30.68189

 13/09/2003 PUNJAB            434.02142   411.49072       -42.38868       -41.80965

 14/09/2003 PUNJAB            435.08966   413.65681       -42.09638       -41.71924

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    2979.10103  2990.78031       -42.29527       -38.97268

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 RAJASTHAN         260.41258   190.25954       -81.95908       -82.77467

 09/09/2003 RAJASTHAN         258.07718   189.71863      -117.60205      -116.17924

 10/09/2003 RAJASTHAN         259.24285   194.28090      -151.42801      -145.36683

 11/09/2003 RAJASTHAN         257.17269   200.41193      -109.27517      -105.33142

 12/09/2003 RAJASTHAN         272.88696   296.24226        63.94077        64.18379

 13/09/2003 RAJASTHAN         280.37670   267.99037       -20.71028       -20.42738

 14/09/2003 RAJASTHAN         279.30666   254.87213       -44.58640       -44.18696

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    1867.47562  1593.77576      -461.62022      -450.08271

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 U.P.              401.17838   459.91424        55.80392        54.85360

 09/09/2003 U.P.              396.70139   537.83445       254.86665       258.15015

 10/09/2003 U.P.              395.61633   529.63229       288.89314       301.22840

 11/09/2003 U.P.              393.63266   486.81521       173.80340       180.22924

 12/09/2003 U.P.              395.94162   487.77484       189.96599       190.68801

 13/09/2003 U.P.              396.06693   502.72851       161.75913       164.06614

 14/09/2003 U.P.              399.71117   521.42271       215.74942       217.81911

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    2778.84848  3526.12225      1340.84165      1367.03467

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 RAILWAYS           10.59872    15.41772         5.01569         4.93028

 09/09/2003 RAILWAYS           10.90512    17.08624        10.71256        10.85057

 10/09/2003 RAILWAYS           11.29122    14.98560         7.52871         7.85017

 11/09/2003 RAILWAYS           16.46249    14.89828        -3.66901        -3.53660

 12/09/2003 RAILWAYS           15.99435    15.69220        -1.79886        -1.79215

 13/09/2003 RAILWAYS           13.73353    16.10712         5.03723         5.10907

 14/09/2003 RAILWAYS           14.77387    16.80580         3.24857         3.27973

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)      93.75930   110.99296        26.07489        26.69107

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 UTTARANCHAL        -1.17464   -43.97626       -44.14063       -44.57988

 09/09/2003 UTTARANCHAL         1.12578   -43.01459       -76.25806       -75.33545

 10/09/2003 UTTARANCHAL         0.05291   -43.85484       -92.79967       -89.08520

 11/09/2003 UTTARANCHAL        -1.22685   -42.31477       -71.01508       -68.45214

 12/09/2003 UTTARANCHAL         0.43125   -35.39121       -68.82565       -68.56886

 13/09/2003 UTTARANCHAL         6.40347   -22.03847       -36.94406       -36.43940

 14/09/2003 UTTARANCHAL         2.24499   -40.26130       -69.88156       -69.25550

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)       7.85691  -270.85144      -459.86471      -451.71643

-----------------------------------------------------------------------------------

 

 


 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 SINGRAULI STPS    325.86000   327.70615        -1.81131        -1.82933

 09/09/2003 SINGRAULI STPS    321.17000   326.71215        -7.57465        -7.48301

 10/09/2003 SINGRAULI STPS    312.94250   316.47701        -4.22248        -4.05347

 11/09/2003 SINGRAULI STPS    313.26250   313.90634         0.25408         0.26347

 12/09/2003 SINGRAULI STPS    324.15000   324.99136         0.10353         0.10392

 13/09/2003 SINGRAULI STPS    326.27500   327.18318         0.10455         0.10604

 14/09/2003 SINGRAULI STPS    328.80000   329.56411         0.04471         0.04514

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)           2252.46000  2266.54030       -13.10157       -12.84724

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 RIHAND STPS       104.81500   105.00619        -0.99231        -1.00218

 09/09/2003 RIHAND STPS       105.38000   107.26125        -2.89897        -2.86390

 10/09/2003 RIHAND STPS       108.00000   109.22727        -2.21710        -2.12836

 11/09/2003 RIHAND STPS       105.25250   106.46132        -1.46732        -1.41436

 12/09/2003 RIHAND STPS       108.15000   109.14619        -1.77850        -1.77186

 13/09/2003 RIHAND STPS       108.15000   108.07756         1.30410         1.32270

 14/09/2003 RIHAND STPS       108.00000   109.06622        -1.70168        -1.68643

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            747.74750   754.24600        -9.75178        -9.54439

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 DADRI TPS         118.68000   118.19401         0.19703         0.19367

 09/09/2003 DADRI TPS         118.71000   122.12228        -7.35982        -7.27078

 10/09/2003 DADRI TPS         118.86000   128.07187       -20.58332       -19.75944

 11/09/2003 DADRI TPS         132.97500   133.99750        -1.48486        -1.43127

 12/09/2003 DADRI TPS         133.65000   135.31953        -4.42924        -4.41271

 13/09/2003 DADRI TPS         122.29500   123.44657        -2.93680        -2.89668

 14/09/2003 DADRI TPS         115.27750   118.27799        -7.13116        -7.06727

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            860.44750   879.42975       -43.72817       -42.64448

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 UNCHAHAR-I TPS     87.97250    87.38896        -0.20105        -0.20305

 09/09/2003 UNCHAHAR-I TPS     88.64000    90.51056        -3.01060        -2.97418

 10/09/2003 UNCHAHAR-I TPS     89.58000    90.53264        -1.78307        -1.71170

 11/09/2003 UNCHAHAR-I TPS     90.74000    90.86416        -0.16750        -0.16145

 12/09/2003 UNCHAHAR-I TPS     90.78000    90.53216         0.23584         0.23674

 13/09/2003 UNCHAHAR-I TPS     90.78000    90.81344        -0.07486        -0.07384

 14/09/2003 UNCHAHAR-I TPS     89.96000    90.48048        -1.21236        -1.20150

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            628.45250   631.12240        -6.21360        -6.08898

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 UNCHAHAR-II TPS    42.84750    43.30768        -0.84163        -0.85001

 09/09/2003 UNCHAHAR-II TPS    43.09000    44.99040        -3.12172        -3.08395

 10/09/2003 UNCHAHAR-II TPS    44.19000    45.39328        -1.92401        -1.84700

 11/09/2003 UNCHAHAR-II TPS    44.89000    45.34544        -0.37119        -0.35779

 12/09/2003 UNCHAHAR-II TPS    44.91000    45.21712        -0.26285        -0.26187

 13/09/2003 UNCHAHAR-II TPS    44.70000    45.21504        -0.60763        -0.59933

 14/09/2003 UNCHAHAR-II TPS    43.88000    44.92416        -1.97855        -1.96082

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            308.50750   314.39312        -9.10758        -8.96077

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 ANTA GPP           40.44000    40.61028        -1.62559        -1.64177

 09/09/2003 ANTA GPP           33.93250    35.99268        -4.66096        -4.60457

 10/09/2003 ANTA GPP           35.71750    38.50728        -6.75940        -6.48884

 11/09/2003 ANTA GPP           36.94000    38.54892        -3.56283        -3.43425

 12/09/2003 ANTA GPP           36.64000    37.94976        -4.21019        -4.19448

 13/09/2003 ANTA GPP           35.21735    35.91372        -1.99848        -1.97118

 14/09/2003 ANTA GPP           33.60500    34.61532        -2.35537        -2.33427

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            252.49235   262.13796       -25.17282       -24.66936

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 AURAIYA GPP       115.01000   116.59668        -3.61873        -3.65474

 09/09/2003 AURAIYA GPP       116.39880   124.50456       -19.92533       -19.68426

 10/09/2003 AURAIYA GPP       116.76380   129.62088       -32.70198       -31.39302

 11/09/2003 AURAIYA GPP       120.44970   126.94404       -16.98180       -16.36892

 12/09/2003 AURAIYA GPP       121.25150   129.94512       -24.52840       -24.43688

 13/09/2003 AURAIYA GPP       124.12200   131.58708       -19.15776       -18.89607

 14/09/2003 AURAIYA GPP       121.62000   126.89160       -12.58902       -12.47624

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            835.61580   886.08996      -129.50302      -126.91013

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 DADRI GPP         131.41000   137.05074       -10.45078       -10.55478

 09/09/2003 DADRI GPP         132.35250   151.90443       -40.78838       -40.29490

 10/09/2003 DADRI GPP         134.39875   149.99325       -34.53232       -33.15010

 11/09/2003 DADRI GPP         140.05600   150.85229       -23.96552       -23.10060

 12/09/2003 DADRI GPP         144.97325   157.18841       -29.93720       -29.82550

 13/09/2003 DADRI GPP         147.69525   156.32556       -20.26761       -19.99075

 14/09/2003 DADRI GPP         147.25938   157.57593       -22.33122       -22.13116

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            978.14513  1060.89061      -182.27303      -179.04779

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 BAIRASIUL HEP      25.05000    25.94848         0.00648         0.00637

 09/09/2003 BAIRASIUL HEP      26.10000    27.21136         0.04109         0.04162

 10/09/2003 BAIRASIUL HEP      23.10000    23.85280         0.07015         0.07315

 11/09/2003 BAIRASIUL HEP      16.35000    17.07488         0.00687         0.00712

 12/09/2003 BAIRASIUL HEP      18.00000    18.77264         0.00578         0.00580

 13/09/2003 BAIRASIUL HEP      24.45000    25.18800        -1.13248        -1.11701

 14/09/2003 BAIRASIUL HEP      19.20000    20.29984         0.00011         0.00011

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            152.25000   158.34800        -1.00200        -0.98284

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 SALAL HEP         149.85000   152.07344        -1.95887        -1.97836

 09/09/2003 SALAL HEP         140.40000   141.92752        -2.79582        -2.76199

 10/09/2003 SALAL HEP         155.20000   159.15216        -9.02194        -8.66082

 11/09/2003 SALAL HEP         136.65000   139.35088        -5.38435        -5.19003

 12/09/2003 SALAL HEP         137.25000   139.03664        -3.64839        -3.63478

 13/09/2003 SALAL HEP         143.60000   146.96704        -6.82223        -6.72904

 14/09/2003 SALAL HEP         154.46250   158.14048        -6.36300        -6.30599

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)           1017.41250  1036.64816       -35.99460       -35.26101

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 TANAKPUR HEP       22.32000    22.69340        -0.45125        -0.45574

 09/09/2003 TANAKPUR HEP       22.32000    22.51991        -0.39413        -0.38936

 10/09/2003 TANAKPUR HEP       22.32000    22.65495        -0.76017        -0.72974

 11/09/2003 TANAKPUR HEP       21.76044    21.89169        -0.32642        -0.31464

 12/09/2003 TANAKPUR HEP       11.10250    11.19772        -0.28969        -0.28861

 13/09/2003 TANAKPUR HEP       11.72250    11.99852        -0.72976        -0.71979

 14/09/2003 TANAKPUR HEP       22.32000    23.32114        -1.71252        -1.69718

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            133.86544   136.27733        -4.66394        -4.59506

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 CHAMERA HEP        85.44000    87.55367        -1.83060        -1.84882

 09/09/2003 CHAMERA HEP        80.99000    83.71295         0.00000               

 10/09/2003 CHAMERA HEP        80.99000    85.03058         0.00000               

 11/09/2003 CHAMERA HEP        80.99000    85.25797         0.00000               

 12/09/2003 CHAMERA HEP        80.99000    84.96346         0.00066         0.00066

 13/09/2003 CHAMERA HEP        74.76000    77.33933         0.00000               

 14/09/2003 CHAMERA HEP        74.76000    76.70451        -3.38780        -3.35745

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            558.92000   580.56247        -5.21774        -5.20561

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 URI HEP            76.86184    82.08163        -5.82812        -5.88612

 09/09/2003 URI HEP            84.01500    87.48835        -6.89006        -6.80670

 10/09/2003 URI HEP            84.78687    86.74610        -4.05684        -3.89446

 11/09/2003 URI HEP            89.31750    92.10703        -4.53910        -4.37528

 12/09/2003 URI HEP            90.05000    91.61251        -2.76538        -2.75506

 13/09/2003 URI HEP            90.71250    91.56557        -0.73209        -0.72209

 14/09/2003 URI HEP            87.72250    89.45919        -1.65738        -1.64253

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            603.46621   621.06038       -26.46897       -26.08224

-----------------------------------------------------------------------------------

 


 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 W.R.E.B.            4.90000  -104.62845       115.77685       115.77685

 09/09/2003 W.R.E.B.           -4.94000   -14.60751        18.53039        18.53039

 10/09/2003 W.R.E.B.            0.37000     4.32798        -8.36264        -8.36264

 11/09/2003 W.R.E.B.           -6.00000    -9.79169         7.56516         7.56516

 12/09/2003 W.R.E.B.           -6.00000    -7.59737         4.02039         4.02039

 13/09/2003 W.R.E.B.            4.78000    -2.26010         8.63450         8.63450

 14/09/2003 W.R.E.B.           -2.52000   -16.95499        20.52550        20.52550

-----------------------------------------------------------------------------------

 TOTAL (Ex-Regl. Boundary)     -9.41000  -151.51213       166.69015       166.69015

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 E.R.E.B.           89.62612    88.73220         0.73120         0.73120

 09/09/2003 E.R.E.B.           80.34244    81.09443        -1.69506        -1.69506

 10/09/2003 E.R.E.B.           52.44157    52.58095        -0.30622        -0.30622

 11/09/2003 E.R.E.B.           74.39956    88.18607       -24.42027       -24.42027

 12/09/2003 E.R.E.B.           89.67980    89.81934        -0.46338        -0.46338

 13/09/2003 E.R.E.B.           89.83596    91.61485        -4.63047        -4.63047

 14/09/2003 E.R.E.B.           89.43924    90.63240        -2.68593        -2.68593

-----------------------------------------------------------------------------------

 TOTAL (Ex-Regl. Boundary)    565.76469   582.66024       -33.47013       -33.47013

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 M.P.                5.28000     4.44984        -0.87296        -0.88165

 09/09/2003 M.P.                5.28000     5.11848        -0.36501        -0.36059

 10/09/2003 M.P.                4.18000     4.73316         1.57440         1.64162

 11/09/2003 M.P.                5.06000     4.68096        -0.56209        -0.54180

 12/09/2003 M.P.                5.28000     5.16732        -0.31945        -0.31826

 13/09/2003 M.P.                5.28000     5.36676         0.12008         0.12179

 14/09/2003 M.P.                0.00000    -0.00732         0.00686         0.00693

-----------------------------------------------------------------------------------

 TOTAL (Ex-Regl. Boundary)     30.36000    29.50920        -0.41817        -0.33196

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 EREB VIA BIHAR      6.72000     4.42083        -3.00514        -3.03504

 09/09/2003 EREB VIA BIHAR      6.72000     4.36866        -3.96008        -3.91217

 10/09/2003 EREB VIA BIHAR      5.32000     5.47362         1.09788         1.14476

 11/09/2003 EREB VIA BIHAR      6.44000     5.24076        -1.95755        -1.88690

 12/09/2003 EREB VIA BIHAR      6.72000     5.11848        -2.85744        -2.84678

 13/09/2003 EREB VIA BIHAR      6.72000     4.45573        -4.47019        -4.40913

 14/09/2003 EREB VIA BIHAR      6.72000     3.30669        -5.48977        -5.44059

-----------------------------------------------------------------------------------

 TOTAL (Ex-Regl. Boundary)     45.36000    32.38477       -20.64229       -20.38585

-----------------------------------------------------------------------------------

                     UI Tariff Structure currently in force

 *********************************************************************************

    Average Frequency of time-block                  UI Rate (P/kWh)             

 ---------------------------------------- ----------------------------------------

    50.5 Hz and above                                     0.00                   

    Below 50.50 Hz and upto 50.48 Hz                      5.60                   

    Below 49.04 Hz and upto 49.02 Hz                    414.40                   

    Below 49.02 Hz                                      420.00                   

    Between 50.50 Hz and 49.02 Hz               Linear in 0.02 Hz steps          

                                               @ 5.6 P/kWh for each step         

 *********************************************************************************

 ABSTRACT OF UNSCHEDULED INTERCHANGES FOR THE PERIOD - 08/09/2003 TO 14/09/2003

                                                       (All figs. in Rs. Lakh)

 ---------------------------------------------------------------------------------

 Utilities and UI payable by them             Utilities and UI receivable by them

 ---------------------------------------------------------------------------------

 U.P.                      1369.94510    :    H.P.                       517.41504

 HARYANA                    597.49894    :    UTTARANCHAL                451.04041

 J & K                      188.59135    :    RAJASTHAN                  449.66447

 W.R.E.B.*                  166.69015    :    NTPC                       409.84720

 RAILWAYS                    26.79417    :    DELHI                      364.14484

                                         :    NHPC                        71.99771

                                         :    PUNJAB                      41.98594

                                         :    E.R.E.B.*                   33.47013

                                         :    EREB VIA BIHAR               8.67842

                                         :    CHANDIGARH                   0.94820

                                         :    M.P.                         0.32735

 ---------------------------------------------------------------------------------

 Total                     2349.51971    :    Total                     2349.51971

 ---------------------------------------------------------------------------------

 NOTE : Unscheduled interchanges of central sector and Inter-regional sources have

        been determined with reference to their schedule at the point of injection

        but those of SEBs with reference to their ex-periphery schedule. Datum

        for working out UI not being same for all entities, this has resulted

        in UI MISMATCH which has been equalised by averaging the two ON DAILY BASIS

 as agreed in 112th meeting of Commercial Committee held on 29.8.03.

 * : UI over HVDC I.R. links retained without adjustment.

 ---------------------------------------------------------------------------------

    ABSTRACT OF CONSTITUENT-WISE U.I. FOR THE PERIOD - 08/09/2003 TO 14/09/2003

                                                       (All figs. in Rs. Lakh)

 ---------------------------------------------------------------------------------

 Utilities and UI payable by them             Utilities and UI receivable by them

 ---------------------------------------------------------------------------------

 U.P.                      1369.94510    :    H.P.                       517.41504

 HARYANA                    597.49894    :    UTTARANCHAL                451.04041

 J & K                      188.59135    :    RAJASTHAN                  449.66447

 W.R.E.B.*                  166.69015    :    DELHI                      364.14484

 RAILWAYS                    26.79417    :    DADRI GPP                  178.70468

                                         :    AURAIYA GPP                126.65731

                                         :    DADRI TPS                   42.52186

                                         :    PUNJAB                      41.98594

                                         :    SALAL HEP                   35.20077

                                         :    E.R.E.B.*                   33.47013

                                         :    URI HEP                     26.05539

                                         :    ANTA GPP                    24.63019

                                         :    SINGRAULI STPS              12.80947

                                         :    RIHAND STPS                  9.51843

                                         :    UNCHAHAR-II TPS              8.93492

                                         :    EREB VIA BIHAR               8.67842

                                         :    UNCHAHAR-I TPS               6.07034

                                         :    CHAMERA HEP                  5.18452

                                         :    TANAKPUR HEP                 4.58126

                                         :    BAIRASIUL HEP                0.97577

                                         :    CHANDIGARH                   0.94820

                                         :    M.P.                         0.32735

 ---------------------------------------------------------------------------------

 Total                     2349.51971    :    Total                     2349.51971

 ---------------------------------------------------------------------------------

 

 ---------------------------------------------------------------------------------

 Average trans. loss in the grid during the period of A/c

                                   1.60 %

 ---------------------------------------------------------------------------------

 

 DETAILS OF TIME-BLOCKS OF SUSPENSION OF U.I. DUE TO TRANS. CONSTRAINTS

 ---------------------------------------------------------------------------------

   Date    Time-block  STATION-NAME                          Reason

 ---------------------------------------------------------------------------------

 08/09/2003   56-57        URI              TRIPPING OF KISHENPUR-PAMPORE

 10/09/2003   49-52        URI              TRIPPING OF KISHENPUR-PAMPORE

 10/09/2003   58-59        URI              TRIPPING OF KISHENPUR-PAMPORE

 10/09/2003   77-79        E.R.             TRIPPING OF SASARAM HVDC STATION

 11/09/2003    2-4       TANAKPUR           TRIPPING OF TANAKPUR-C.B.GUNJ

 ---------------------------------------------------------------------------------

 

 DETAILS OF TIME-BLOCKS OF SUSPENSION OF U.I. DUE TO GRID DISTURBANCE

 ---------------------------------------------------------------------------------

   Date    Time-block                              Reason

 ---------------------------------------------------------------------------------

                                        -- NIL --

 ---------------------------------------------------------------------------------

 

 NOTE:- The schedule of URI has been replaced with its actual generation during the

        above mentioned time blocks on 08-09-03 and 10-09-03 in line with the methodology circulated by NRLDC vide letter dated 24-07-03.

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 CHANDIGARH         37.11662    36.15441         0.34370         0.34016

 09/09/2003 CHANDIGARH         36.92948    37.76082         0.20154         0.20481

 10/09/2003 CHANDIGARH         35.89884    38.16841         4.30003         4.49442

 11/09/2003 CHANDIGARH         36.14861    36.96968         0.52310         0.53586

 12/09/2003 CHANDIGARH         35.79167    36.67991         1.18303         1.19455

 13/09/2003 CHANDIGARH         35.96044    34.98240        -0.79485        -0.77924

 14/09/2003 CHANDIGARH         36.05361    32.42923        -7.03030        -6.93876

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)     253.89927   253.14486        -1.27375        -0.94820

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 DELHI             366.12119   325.74805       -35.89808       -36.11179

 09/09/2003 DELHI             360.63784   353.39550       -18.78130       -18.49678

 10/09/2003 DELHI             347.97578   347.45003        -0.64154        -0.61448

 11/09/2003 DELHI             351.59569   321.60748       -47.83344       -46.66712

 12/09/2003 DELHI             359.29280   309.92441      -105.23974      -104.24509

 13/09/2003 DELHI             376.48282   314.59886       -90.44729       -88.67148

 14/09/2003 DELHI             354.31133   310.72339       -70.25281       -69.33810

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    2516.41745  2283.44772      -369.09420      -364.14484

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 HARYANA           300.12759   344.16437        49.96370        49.44898

 09/09/2003 HARYANA           285.27054   359.02797       135.57280       137.77376

 10/09/2003 HARYANA           289.48575   345.15741       121.15762       126.63482

 11/09/2003 HARYANA           325.99157   363.82838        66.33447        67.95248

 12/09/2003 HARYANA           316.00742   332.57436        24.14618        24.38138

 13/09/2003 HARYANA           306.46387   347.70287        71.04211        72.51661

 14/09/2003 HARYANA           311.19854   376.24316       117.14382       118.79091

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    2134.54528  2468.69852       585.36070       597.49894

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 H.P.               23.64806   -48.47719       -72.94587       -73.38013

 09/09/2003 H.P.               23.88844   -48.47787      -127.03881      -125.11426

 10/09/2003 H.P.               12.57135   -49.15728      -133.00711      -127.39651

 11/09/2003 H.P.               -6.30941   -40.08020       -57.60952       -56.20483

 12/09/2003 H.P.              -11.70326   -37.70800       -46.78571       -46.34353

 13/09/2003 H.P.              -16.69247   -29.10167       -20.31534       -19.91647

 14/09/2003 H.P.               -4.75228   -43.75092       -69.97034       -69.05931

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)      20.65043  -296.75313      -527.67270      -517.41504

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 J & K             120.00220   130.81538        19.01804        18.82212

 09/09/2003 J & K             117.82728   132.47551        28.41586        28.87718

 10/09/2003 J & K             122.81009   132.68159        23.41540        24.47395

 11/09/2003 J & K             118.40605   143.70006        49.25670        50.45816

 12/09/2003 J & K             118.99982   137.84498        39.67262        40.05906

 13/09/2003 J & K             120.94725   129.08444        17.00798        17.36099

 14/09/2003 J & K             123.75512   126.33417         8.42148         8.53989

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)     842.74781   932.93613       185.20808       188.59135

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 PUNJAB            423.01444   446.54032        24.77146        24.51627

 09/09/2003 PUNJAB            418.64569   415.17659       -17.17565       -16.91545

 10/09/2003 PUNJAB            417.19468   426.04263        15.18818        15.87480

 11/09/2003 PUNJAB            419.79563   454.09752        48.41398        49.59488

 12/09/2003 PUNJAB            432.66409   423.77572       -31.35423       -31.05789

 13/09/2003 PUNJAB            434.30137   411.49072       -42.87981       -42.03792

 14/09/2003 PUNJAB            435.33953   413.65681       -42.51418       -41.96063

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    2980.95543  2990.78031       -45.55025       -41.98594

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 RAJASTHAN         260.41258   190.25954       -81.95908       -82.44700

 09/09/2003 RAJASTHAN         258.07718   189.71863      -117.60205      -115.82046

 10/09/2003 RAJASTHAN         259.24285   194.28090      -151.42801      -145.04036

 11/09/2003 RAJASTHAN         257.17269   200.41193      -109.27517      -106.61072

 12/09/2003 RAJASTHAN         272.88696   296.24226        63.94077        64.56360

 13/09/2003 RAJASTHAN         280.37670   267.99037       -20.71028       -20.30366

 14/09/2003 RAJASTHAN         279.30666   254.87213       -44.58640       -44.00587

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    1867.47562  1593.77576      -461.62022      -449.66447

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 U.P.              401.17838   459.91424        55.80392        55.22903

 09/09/2003 U.P.              396.70139   537.83445       254.86665       259.00429

 10/09/2003 U.P.              395.61633   529.63229       288.89314       301.95320

 11/09/2003 U.P.              393.63266   486.81521       173.80340       178.04276

 12/09/2003 U.P.              395.94162   487.77484       189.96599       191.81638

 13/09/2003 U.P.              396.06693   502.72851       161.75913       165.11650

 14/09/2003 U.P.              399.71117   521.42271       215.74942       218.78294

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)    2778.84848  3526.12225      1340.84165      1369.94510

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 RAILWAYS           10.59872    15.41772         5.01569         4.96402

 09/09/2003 RAILWAYS           10.90512    17.08624        10.71256        10.88647

 10/09/2003 RAILWAYS           11.29122    14.98560         7.52871         7.86906

 11/09/2003 RAILWAYS           16.46249    14.89828        -3.66901        -3.57955

 12/09/2003 RAILWAYS           15.99435    15.69220        -1.79886        -1.78186

 13/09/2003 RAILWAYS           13.73353    16.10712         5.03723         5.14178

 14/09/2003 RAILWAYS           14.77387    16.80580         3.24857         3.29425

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)      93.75930   110.99296        26.07489        26.79417

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 UTTARANCHAL        -1.17464   -43.97626       -44.14063       -44.40341

 09/09/2003 UTTARANCHAL         1.12578   -43.01459       -76.25806       -75.10280

 10/09/2003 UTTARANCHAL         0.05291   -43.85484       -92.79967       -88.88513

 11/09/2003 UTTARANCHAL        -1.22685   -42.31477       -71.01508       -69.28352

 12/09/2003 UTTARANCHAL         0.43125   -35.39121       -68.82565       -68.17516

 13/09/2003 UTTARANCHAL         6.40347   -22.03847       -36.94406       -36.21871

 14/09/2003 UTTARANCHAL         2.24499   -40.26130       -69.88156       -68.97168

-----------------------------------------------------------------------------------

 TOTAL (Ex-SEB Periphery)       7.85691  -270.85144      -459.86471      -451.04041

-----------------------------------------------------------------------------------

 

 


 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 SINGRAULI STPS    325.86000   327.70615        -1.81131        -1.82209

 09/09/2003 SINGRAULI STPS    321.17000   326.71215        -7.57465        -7.45990

 10/09/2003 SINGRAULI STPS    312.94250   316.47701        -4.22248        -4.04436

 11/09/2003 SINGRAULI STPS    313.26250   313.90634         0.25408         0.26028

 12/09/2003 SINGRAULI STPS    324.15000   324.99136         0.10353         0.10454

 13/09/2003 SINGRAULI STPS    326.27500   327.18318         0.10455         0.10672

 14/09/2003 SINGRAULI STPS    328.80000   329.56411         0.04471         0.04534

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)           2252.46000  2266.54030       -13.10157       -12.80947

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 RIHAND STPS       104.81500   105.00619        -0.99231        -0.99822

 09/09/2003 RIHAND STPS       105.38000   107.26125        -2.89897        -2.85505

 10/09/2003 RIHAND STPS       108.00000   109.22727        -2.21710        -2.12358

 11/09/2003 RIHAND STPS       105.25250   106.46132        -1.46732        -1.43154

 12/09/2003 RIHAND STPS       108.15000   109.14619        -1.77850        -1.76169

 13/09/2003 RIHAND STPS       108.15000   108.07756         1.30410         1.33117

 14/09/2003 RIHAND STPS       108.00000   109.06622        -1.70168        -1.67952

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            747.74750   754.24600        -9.75178        -9.51843

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 DADRI TPS         118.68000   118.19401         0.19703         0.19500

 09/09/2003 DADRI TPS         118.71000   122.12228        -7.35982        -7.24832

 10/09/2003 DADRI TPS         118.86000   128.07187       -20.58332       -19.71506

 11/09/2003 DADRI TPS         132.97500   133.99750        -1.48486        -1.44865

 12/09/2003 DADRI TPS         133.65000   135.31953        -4.42924        -4.38738

 13/09/2003 DADRI TPS         122.29500   123.44657        -2.93680        -2.87914

 14/09/2003 DADRI TPS         115.27750   118.27799        -7.13116        -7.03831

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            860.44750   879.42975       -43.72817       -42.52186

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 UNCHAHAR-I TPS     87.97250    87.38896        -0.20105        -0.20225

 09/09/2003 UNCHAHAR-I TPS     88.64000    90.51056        -3.01060        -2.96499

 10/09/2003 UNCHAHAR-I TPS     89.58000    90.53264        -1.78307        -1.70786

 11/09/2003 UNCHAHAR-I TPS     90.74000    90.86416        -0.16750        -0.16342

 12/09/2003 UNCHAHAR-I TPS     90.78000    90.53216         0.23584         0.23814

 13/09/2003 UNCHAHAR-I TPS     90.78000    90.81344        -0.07486        -0.07339

 14/09/2003 UNCHAHAR-I TPS     89.96000    90.48048        -1.21236        -1.19657

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            628.45250   631.12240        -6.21360        -6.07034

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 UNCHAHAR-II TPS    42.84750    43.30768        -0.84163        -0.84664

 09/09/2003 UNCHAHAR-II TPS    43.09000    44.99040        -3.12172        -3.07443

 10/09/2003 UNCHAHAR-II TPS    44.19000    45.39328        -1.92401        -1.84285

 11/09/2003 UNCHAHAR-II TPS    44.89000    45.34544        -0.37119        -0.36214

 12/09/2003 UNCHAHAR-II TPS    44.91000    45.21712        -0.26285        -0.26037

 13/09/2003 UNCHAHAR-II TPS    44.70000    45.21504        -0.60763        -0.59570

 14/09/2003 UNCHAHAR-II TPS    43.88000    44.92416        -1.97855        -1.95279

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            308.50750   314.39312        -9.10758        -8.93492

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 ANTA GPP           40.44000    40.61028        -1.62559        -1.63527

 09/09/2003 ANTA GPP           33.93250    35.99268        -4.66096        -4.59035

 10/09/2003 ANTA GPP           35.71750    38.50728        -6.75940        -6.47427

 11/09/2003 ANTA GPP           36.94000    38.54892        -3.56283        -3.47596

 12/09/2003 ANTA GPP           36.64000    37.94976        -4.21019        -4.17040

 13/09/2003 ANTA GPP           35.21735    35.91372        -1.99848        -1.95924

 14/09/2003 ANTA GPP           33.60500    34.61532        -2.35537        -2.32470

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            252.49235   262.13796       -25.17282       -24.63019

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 AURAIYA GPP       115.01000   116.59668        -3.61873        -3.64027

 09/09/2003 AURAIYA GPP       116.39880   124.50456       -19.92533       -19.62348

 10/09/2003 AURAIYA GPP       116.76380   129.62088       -32.70198       -31.32252

 11/09/2003 AURAIYA GPP       120.44970   126.94404       -16.98180       -16.56773

 12/09/2003 AURAIYA GPP       121.25150   129.94512       -24.52840       -24.29658

 13/09/2003 AURAIYA GPP       124.12200   131.58708       -19.15776       -18.78162

 14/09/2003 AURAIYA GPP       121.62000   126.89160       -12.58902       -12.42511

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            835.61580   886.08996      -129.50302      -126.65731

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 DADRI GPP         131.41000   137.05074       -10.45078       -10.51300

 09/09/2003 DADRI GPP         132.35250   151.90443       -40.78838       -40.17046

 10/09/2003 DADRI GPP         134.39875   149.99325       -34.53232       -33.07565

 11/09/2003 DADRI GPP         140.05600   150.85229       -23.96552       -23.38117

 12/09/2003 DADRI GPP         144.97325   157.18841       -29.93720       -29.65426

 13/09/2003 DADRI GPP         147.69525   156.32556       -20.26761       -19.86968

 14/09/2003 DADRI GPP         147.25938   157.57593       -22.33122       -22.04046

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            978.14513  1060.89061      -182.27303      -178.70468

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 BAIRASIUL HEP      25.05000    25.94848         0.00648         0.00641

 09/09/2003 BAIRASIUL HEP      26.10000    27.21136         0.04109         0.04176

 10/09/2003 BAIRASIUL HEP      23.10000    23.85280         0.07015         0.07332

 11/09/2003 BAIRASIUL HEP      16.35000    17.07488         0.00687         0.00704

 12/09/2003 BAIRASIUL HEP      18.00000    18.77264         0.00578         0.00584

 13/09/2003 BAIRASIUL HEP      24.45000    25.18800        -1.13248        -1.11025

 14/09/2003 BAIRASIUL HEP      19.20000    20.29984         0.00011         0.00011

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            152.25000   158.34800        -1.00200        -0.97577

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 SALAL HEP         149.85000   152.07344        -1.95887        -1.97053

 09/09/2003 SALAL HEP         140.40000   141.92752        -2.79582        -2.75347

 10/09/2003 SALAL HEP         155.20000   159.15216        -9.02194        -8.64137

 11/09/2003 SALAL HEP         136.65000   139.35088        -5.38435        -5.25306

 12/09/2003 SALAL HEP         137.25000   139.03664        -3.64839        -3.61391

 13/09/2003 SALAL HEP         143.60000   146.96704        -6.82223        -6.68828

 14/09/2003 SALAL HEP         154.46250   158.14048        -6.36300        -6.28015

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)           1017.41250  1036.64816       -35.99460       -35.20077

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 TANAKPUR HEP       22.32000    22.69340        -0.45125        -0.45394

 09/09/2003 TANAKPUR HEP       22.32000    22.51991        -0.39413        -0.38816

 10/09/2003 TANAKPUR HEP       22.32000    22.65495        -0.76017        -0.72810

 11/09/2003 TANAKPUR HEP       21.76044    21.89169        -0.32642        -0.31846

 12/09/2003 TANAKPUR HEP       11.10250    11.19772        -0.28969        -0.28695

 13/09/2003 TANAKPUR HEP       11.72250    11.99852        -0.72976        -0.71543

 14/09/2003 TANAKPUR HEP       22.32000    23.32114        -1.71252        -1.69022

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            133.86544   136.27733        -4.66394        -4.58126

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 CHAMERA HEP        85.44000    87.55367        -1.83060        -1.84150

 09/09/2003 CHAMERA HEP        80.99000    83.71295         0.00000               

 10/09/2003 CHAMERA HEP        80.99000    85.03058         0.00000               

 11/09/2003 CHAMERA HEP        80.99000    85.25797         0.00000               

 12/09/2003 CHAMERA HEP        80.99000    84.96346         0.00066         0.00067

 13/09/2003 CHAMERA HEP        74.76000    77.33933         0.00000               

 14/09/2003 CHAMERA HEP        74.76000    76.70451        -3.38780        -3.34369

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            558.92000   580.56247        -5.21774        -5.18452

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 URI HEP            76.86184    82.08163        -5.82812        -5.86282

 09/09/2003 URI HEP            84.01500    87.48835        -6.89006        -6.78568

 10/09/2003 URI HEP            84.78687    86.74610        -4.05684        -3.88571

 11/09/2003 URI HEP            89.31750    92.10703        -4.53910        -4.42842

 12/09/2003 URI HEP            90.05000    91.61251        -2.76538        -2.73924

 13/09/2003 URI HEP            90.71250    91.56557        -0.73209        -0.71772

 14/09/2003 URI HEP            87.72250    89.45919        -1.65738        -1.63580

-----------------------------------------------------------------------------------

 TOTAL (Ex-PP Bus)            603.46621   621.06038       -26.46897       -26.05539

-----------------------------------------------------------------------------------

 


 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 W.R.E.B.            4.90000  -104.62845       115.77685       115.77685

 09/09/2003 W.R.E.B.           -4.94000   -14.60751        18.53039        18.53039

 10/09/2003 W.R.E.B.            0.37000     4.32798        -8.36264        -8.36264

 11/09/2003 W.R.E.B.           -6.00000    -9.79169         7.56516         7.56516

 12/09/2003 W.R.E.B.           -6.00000    -7.59737         4.02039         4.02039

 13/09/2003 W.R.E.B.            4.78000    -2.26010         8.63450         8.63450

 14/09/2003 W.R.E.B.           -2.52000   -16.95499        20.52550        20.52550

-----------------------------------------------------------------------------------

 TOTAL (Ex-Regl. Boundary)     -9.41000  -151.51213       166.69015       166.69015

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 E.R.E.B.           89.62612    88.73220         0.73120         0.73120

 09/09/2003 E.R.E.B.           80.34244    81.09443        -1.69506        -1.69506

 10/09/2003 E.R.E.B.           52.44157    52.58095        -0.30622        -0.30622

 11/09/2003 E.R.E.B.           74.39956    88.18607       -24.42027       -24.42027

 12/09/2003 E.R.E.B.           89.67980    89.81934        -0.46338        -0.46338

 13/09/2003 E.R.E.B.           89.83596    91.61485        -4.63047        -4.63047

 14/09/2003 E.R.E.B.           89.43924    90.63240        -2.68593        -2.68593

-----------------------------------------------------------------------------------

 TOTAL (Ex-Regl. Boundary)    565.76469   582.66024       -33.47013       -33.47013

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 M.P.                5.28000     4.44984        -0.87296        -0.87816

 09/09/2003 M.P.                5.28000     5.11848        -0.36501        -0.35948

 10/09/2003 M.P.                4.18000     4.73316         1.57440         1.64557

 11/09/2003 M.P.                5.06000     4.68096        -0.56209        -0.54838

 12/09/2003 M.P.                5.28000     5.16732        -0.31945        -0.31643

 13/09/2003 M.P.                5.28000     5.36676         0.12008         0.12257

 14/09/2003 M.P.                0.00000    -0.00732         0.00686         0.00696

-----------------------------------------------------------------------------------

 TOTAL (Ex-Regl. Boundary)     30.36000    29.50920        -0.41817        -0.32735

-----------------------------------------------------------------------------------

 

DETAILS OF UI AMOUNT (IN Rs. LAKH) TO BE PAID (+) / RECEIVED (-) BY

***********************************************************************************

  DATE        ENTITY          SCHDL(LU)  ACTUAL(LU)     UI(Unadjs.)     UI(Matched)

  ----        ------          ---------  ----------     -----------     -----------

 08/09/2003 EREB VIA BIHAR      6.72000     4.42083        -3.00514        -3.02303

 09/09/2003 EREB VIA BIHAR      6.72000     4.36866        -3.96008        -3.90009

 10/09/2003 EREB VIA BIHAR      5.32000     5.47362         1.09788         1.14751

 11/09/2003 EREB VIA BIHAR      0.00000     5.24076         9.49669         9.72833

 12/09/2003 EREB VIA BIHAR      6.72000     5.11848        -2.85744        -2.83043

 13/09/2003 EREB VIA BIHAR      6.72000     4.45573        -4.47019        -4.38242

 14/09/2003 EREB VIA BIHAR      6.72000     3.30669        -5.48977        -5.41829

-----------------------------------------------------------------------------------

 TOTAL (Ex-Regl. Boundary)     38.92000    32.38477        -9.18805        -8.67842

-----------------------------------------------------------------------------------