S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
1 Nov-05/AP-1154
25-Nov-05
PTC/OA/NR/934
dt17-Nov-05
PTC
GRIDCO
-J & K
01-Jan-06 31-Jan-06 0000-2400: 100 MW ER-NR
Radial
2 Nov-05/AP-1155
25-Nov-05
PTC/OA/NR/DTL/935
dt17-Nov-05
PTC
GRIDCO
-DTL
01-Jan-06 28-Feb-06 1700-2300: 200 MW ER-NR
3 Nov-05/AP-1163
25-Nov-05
CC/NVVN/OA/11/466
dt18-Nov-05
NVVN
KSEB
-PSEB
01-Jan-06 31-Jan-06 0000-1700: 84 MW
1700-2300: 0 MW
2300-2400: 84 MW
SR-ER-WR-NR
4 Nov-05/AP-1164
25-Nov-05
CC/NVVN/OA/11/467
dt18-Nov-05
NVVN
KSEB
-JVVNL
01-Jan-06 31-Jan-06 0000-1700: 42 MW
1700-2300: 0 MW
2300-2400: 42 MW
SR-ER-WR-NR
5 Nov-05/AP-1156
25-Nov-05
PTC/OA/NR/GRIDCO-Raj/949
dt19-Nov-05
PTC
GRIDCO
-JVVNL
01-Jan-06 31-Jan-06 0000-1700: 75 MW
1700-2300: 0 MW
2300-2400: 75 MW
ER-NR
6 Nov-05/AP-1165
25-Nov-05
PTC/OA/NR/948
dt19-Nov-05
PTC
APPCC
-J & K
01-Jan-06 31-Jan-06 0000-1700: 85 MW
1700-2300: 100 MW
2300-2400: 85 MW
SR-ER-WR-NR
7 Nov-05/AP-1157
25-Nov-05
PTC/OA/NR/GRIDCO-Raj/947
dt18-Nov-05
PTC
GRIDCO
-JVVNL
01-Jan-06 31-Jan-06 0000-1700: 200 MW
1700-2300: 100 MW
2300-2400: 200 MW
ER-NR
8 Nov-05/AP-1159
25-Nov-05
PTC/OA/NR/AP-Raj/946
dt18-Nov-05
PTC
APPCC
-JVVNL
01-Jan-06 31-Jan-06 1700-2300: 100 MW SR-ER-WR-NR
9 Nov-05/AP-1166
25-Nov-05
PTC/OA/NR/AP-PSEB/938
dt18-Nov-05
PTC
APPCC
-PSEB
01-Jan-06 31-Jan-06 0000-1700: 63 MW
1700-2300: 0 MW
2300-2400: 63 MW
SR-ER-WR-NR
10 Nov-05/AP-1160
25-Nov-05
PTC/OA/NR/AP-DTL/937
dt18-Nov-05
PTC
APPCC
-DTL
01-Jan-06 31-Jan-06 1700-2300: 100 MW SR-ER-WR-NR
11 Nov-05/AP-1167
25-Nov-05
PTC/OA/NR/PSEB/936
dt18-Nov-05
PTC
KSEB
-PSEB
01-Jan-06 31-Jan-06 0000-1700: 42 MW
1700-2300: 0 MW
2300-2400: 42 MW
SR-ER-WR-NR
12 Nov-05/AP-1158
25-Nov-05
PTC/OA/NR/GRIDCO-UTC/962
dt19-Nov-05
PTC
GRIDCO
-UT-Chd
01-Jan-06 31-Jan-06 0000-1700: 25 MW
1700-2300: 0 MW
2300-2400: 25 MW
ER-NR
13 Nov-05/AP-1168
25-Nov-05
PTC/OA/NR/AP-PSEB/964
dt19-Nov-05
PTC
APPCC
-PSEB
01-Jan-06 31-Jan-06 0000-1700: 84 MW
1700-2300: 0 MW
2300-2400: 84 MW
SR-ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
14 Dec-05/AP-1569
27-Dec-05
AEL/PT/TRANS/2005-06/677
dt16-Dec-05
ADANI
WBSEB
-HPGCL
01-Jan-06 31-Jan-06 0000-1700: 20 MW
1700-2300: 0 MW
2300-2400: 20 MW
ER-NR
15 Dec-05/AP-1576
27-Dec-05
CC/NVVN/OA/12/599
dt16-Dec-05
NVVN
Tripura
-HPGCL
01-Jan-06 31-Jan-06 1700-2300: 20 MW NER-ER-NR
16 Dec-05/AP-1577
27-Dec-05
PTC/OA/NR/Malana/1108
dt19-Dec-05
PTC
MALANA
-HPGCL
01-Jan-06 19-Jan-06 0400-1000: 81 MW
1600-2200: 81 MW
----
17 Dec-05/AP-1578
27-Dec-05
191/2005-06
dt19-Dec-05
TATA
WBSEB
-HPGCL
01-Jan-06 31-Jan-06 1700-2300: 50 MW ER-WR-NR
18 Dec-05/AP-1579
27-Dec-05
197/2005-06
dt19-Dec-05
TATA
WBSEB
-JVVNL
01-Jan-06 31-Jan-06 1700-2300: 50 MW ER-WR-NR
19 Dec-05/AP-1638
30-Dec-05
13/2005
dt28-Dec-05
DTL
RPPC
-DTL
01-Jan-06 31-Jan-06 0630-1030: 100 MW ----
20 Dec-05/AP-1639
30-Dec-05
14/2005
dt29-Dec-05
DTL
DTL
-RPPC
01-Jan-06 31-Jan-06 0000-0500: 250 MW
2300-2400: 250 MW
----
21 Dec-05/AP-1640
30-Dec-05
7-Com-B(P)
dt29-Dec-05
UPCL
PSEB
-UPCL
01-Jan-06 10-Jan-06 0000-2400: 75 MW ----
22 Dec-05/AP-1641
30-Dec-05
9-Com-B(P)
dt29-Dec-05
UPCL
HPGCL
-UPCL
01-Jan-06 10-Jan-06 0000-2400: 25 MW ----
23 Dec-05/AP-1642
31-Dec-05
Ch-261/HPGCL/PP-50
dt30-Dec-05
HPGCL
DTL
-HPGCL
01-Jan-06 10-Jan-06 0000-0600: 200 MW ----
24 Dec-05/AP-1643
31-Dec-05
01/01/2006
dt30-Dec-05
HPSEB
PSEB
-HPSEB
01-Jan-06 15-Jan-06 0000-2400: 100 MW ----
25 Dec-05/AP-1644
31-Dec-05
02/01/2006
dt30-Dec-05
HPSEB
DTL
-HPSEB
01-Jan-06 15-Jan-06 0000-0600: 150 MW ----
26 Dec-05/AP-1645
31-Dec-05
03/01/2006
dt30-Dec-05
HPSEB
DTL
-HPSEB
01-Jan-06 15-Jan-06 1200-1800: 50 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
27 Dec-05/AP-1646
31-Dec-05
PTC/OA/1202D
dt31-Dec-05
PTC
JINDAL TPS
-HPGCL
01-Jan-06 01-Jan-06 0000-0600: 50 MW SR-ER-NR
28 Dec-05/AP-1647
31-Dec-05
CC/NVVN/OA/12/728
dt31-Dec-05
NVVN
MeSEB
-HPGCL
01-Jan-06 01-Jan-06 1700-2300: 30 MW NER-ER-NR
29 Dec-05/AP-1648
31-Dec-05
PTC/OA/1201D
dt31-Dec-05
PTC
GUVNL
-HPGCL
01-Jan-06 01-Jan-06 0000-0600: 27 MW
1700-2300: 50 MW
WR-NR
30 Dec-05/AP-1649
31-Dec-05
AEL/PT/Trans/2005-06/830
dt31-Dec-05
ADANI
WBSEB
-HPGCL
01-Jan-06 01-Jan-06 0000-0600: 20 MW
0600-1700: 45 MW
1700-2300: 0 MW
2300-2400: 45 MW
ER-WR-NR
31 Dec-05/AP-1650
31-Dec-05
CC/NVVN/OA/12/732
dt31-Dec-05
NVVN
ANTA_L
-DTL
01-Jan-06 01-Jan-06 0800-1200: 39 MW
1200-1230: 10 MW
----
32 Dec-05/AP-1651
31-Dec-05
CC/NVVN/OA/12/733
dt31-Dec-05
NVVN
AURAIYA_L
-DTL
01-Jan-06 01-Jan-06 0800-1200: 49 MW
1200-1230: 20 MW
----
33 Dec-05/AP-1652
31-Dec-05
CC/NVVN/OA/12/734
dt31-Dec-05
NVVN
DADRI_L
-DTL
01-Jan-06 01-Jan-06 0800-1200: 77 MW
1200-1230: 70 MW
----
34 Dec-05/AP-1653
31-Dec-05
CC/NVVN/OA/12/729
dt31-Dec-05
NVVN
ANTA_L
-J & K
01-Jan-06 01-Jan-06 0600-1200: 20 MW
1700-2300: 45 MW
----
35 Dec-05/AP-1654
31-Dec-05
CC/NVVN/OA/12/730
dt31-Dec-05
NVVN
AURAIYA_L
-J & K
01-Jan-06 01-Jan-06 0600-1200: 30 MW
1700-2300: 75 MW
----
36 Dec-05/AP-1655
31-Dec-05
CC/NVVN/OA/12/731
dt31-Dec-05
NVVN
DADRI_L
-J & K
01-Jan-06 01-Jan-06 0600-1200: 50 MW
1700-2300: 80 MW
----
37 Dec-05/AP-1656
31-Dec-05
Xen/ControlRoom/RPPC/S&M/177
dt31-Dec-05
JVVNL
PSEB
-JVVNL
01-Jan-06 01-Jan-06 0000-0400: 250 MW
0400-0500: 100 MW
1900-2100: 100 MW
2100-2300: 50 MW
2300-2400: 150 MW
----
38 Jan-06/AP-1656
01-Jan-06
Xen/ControlRoom/RPPC/S&M/179
dt01-Jan-06
JVVNL
PSEB
-JVVNL
02-Jan-06 02-Jan-06 0000-0400: 250 MW
0400-0500: 100 MW
1900-2100: 100 MW
2100-2300: 50 MW
2300-2400: 150 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
39 Jan-06/AP-1657
01-Jan-06
CC/NVVN/OA/12/742
dt01-Jan-06
NVVN
ANTA_L
-J & K
02-Jan-06 02-Jan-06 0600-1200: 47 MW
1700-2300: 47 MW
----
40 Jan-06/AP-1658
01-Jan-06
CC/NVVN/OA/12/741
dt01-Jan-06
NVVN
AURAIYA_L
-J & K
02-Jan-06 02-Jan-06 0600-1200: 66 MW
1700-2300: 66 MW
----
41 Jan-06/AP-1659
01-Jan-06
CC/NVVN/OA/12/740
dt01-Jan-06
NVVN
DADRI_L
-J & K
02-Jan-06 02-Jan-06 0600-1200: 87 MW
1700-2300: 87 MW
----
42 Jan-06/AP-1660
01-Jan-06
CC/NVVN/OA/12/739
dt01-Jan-06
NVVN
ANTA_L
-DTL
02-Jan-06 02-Jan-06 0800-0900: 46 MW
0900-1130: 0 MW
1130-1200: 13 MW
1200-1230: 50 MW
1230-1300: 40 MW
----
43 Jan-06/AP-1661
01-Jan-06
CC/NVVN/OA/12/738
dt01-Jan-06
NVVN
AURAIYA_L
-DTL
02-Jan-06 02-Jan-06 0800-0830: 73 MW
0830-0900: 72 MW
0900-1130: 0 MW
1130-1200: 30 MW
1200-1230: 70 MW
1230-1300: 60 MW
----
44 Jan-06/AP-1662
01-Jan-06
CC/NVVN/OA/12/737
dt01-Jan-06
NVVN
DADRI_L
-DTL
02-Jan-06 02-Jan-06 0800-0900: 90 MW
0900-1130: 0 MW
1130-1200: 44 MW
1200-1230: 80 MW
----
45 Jan-06/AP-1663
01-Jan-06
PTC/1205
dt01-Jan-06
PTC
JINDAL TPS
-HPGCL
02-Jan-06 02-Jan-06 0000-0600: 50 MW SR-ER-NR
46 Jan-06/AP-1664
01-Jan-06
AEL/PT/Trans/2005-06/835
dt01-Jan-06
ADANI
WBSEB
-HPGCL
02-Jan-06 02-Jan-06 1700-2300: 38 MW ER-NR
47 Jan-06/AP-1665
01-Jan-06
CC/NVVN/OA/12/736
dt01-Jan-06
NVVN
MeSEB
-HPGCL
02-Jan-06 02-Jan-06 1700-2300: 13 MW NER-ER-NR
48 Jan-06/AP-1666
01-Jan-06
PTC/1204D
dt01-Jan-06
PTC
GUVNL
-HPGCL
02-Jan-06 02-Jan-06 0000-0600: 27 MW
1700-2300: 50 MW
WR-NR
49 Jan-06/AP-1667
01-Jan-06
AEL/PT/Trans/2005-06/834
dt01-Jan-06
ADANI
WBSEB
-HPGCL
02-Jan-06 02-Jan-06 0000-0600: 20 MW
0600-1700: 45 MW
1700-2300: 0 MW
2300-2400: 45 MW
ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
50 Jan-06/AP-1668
01-Jan-06
12/2005
dt28-Dec-05
DTL
HPGCL
-DTL
01-Jan-06 31-Jan-06 0700-1100: 100 MW ----
51 Jan-06/AP-1669
02-Jan-06
Xen/ControlRoom/RPPC/S&M/180
dt02-Jan-06
JVVNL
PSEB
-JVVNL
03-Jan-06 03-Jan-06 0000-0400: 250 MW
0400-0500: 100 MW
1900-2100: 100 MW
2100-2300: 50 MW
2300-2400: 150 MW
----
52 Jan-06/AP-1670
02-Jan-06
PTC/OA/1208D
dt02-Jan-06
PTC
JINDAL TPS
-HPGCL
03-Jan-06 03-Jan-06 0000-0600: 17 MW SR-ER-NR
53 Jan-06/AP-1671
02-Jan-06
AEL/PT/Trans/2005-06/842
dt02-Jan-06
ADANI
WBSEB
-HPGCL
03-Jan-06 03-Jan-06 0000-0600: 33 MW
0600-1700: 50 MW
ER-NR
54 Jan-06/AP-1672
02-Jan-06
AEL/PT/Trans/2005-06/843
dt02-Jan-06
ADANI
WBSEB
-HPGCL
03-Jan-06 03-Jan-06 2100-2400: 15 MW ER-NR
Radial
55 Jan-06/AP-1673
02-Jan-06
AEL/PT/Trans/2005-06/839
dt02-Jan-06
ADANI
WBSEB
-HPGCL
03-Jan-06 03-Jan-06 1700-2300: 38 MW ER-NR
56 Jan-06/AP-1674
02-Jan-06
CC/NVVN/OA/12/744
dt02-Jan-06
NVVN
MeSEB
-HPGCL
03-Jan-06 03-Jan-06 1700-2300: 12 MW NER-ER-NR
57 Jan-06/AP-1675
02-Jan-06
PTC/OA/1207D
dt02-Jan-06
PTC
GUVNL
-HPGCL
03-Jan-06 03-Jan-06 0000-0500: 45 MW
0500-0600: 25 MW
1700-2300: 45 MW
WR-NR
58 Jan-06/AP-1676
02-Jan-06
AEL/PT/Trans/2005-06/837
dt02-Jan-06
ADANI
WBSEB
-HPGCL
03-Jan-06 03-Jan-06 0500-0600: 20 MW
0600-1700: 45 MW
1700-2300: 0 MW
2300-2400: 42 MW
ER-WR-NR
59 Jan-06/AP-1677
03-Jan-06
Xen/RPPC/S&M/183
dt03-Jan-06
JVVNL
PSEB
-JVVNL
04-Jan-06 04-Jan-06 0000-0400: 250 MW
0400-0500: 100 MW
1900-2300: 100 MW
2300-2400: 150 MW
----
60 Jan-06/AP-1678
03-Jan-06
PTC/OA/1212D
dt03-Jan-06
PTC
JINDAL TPS
-HPGCL
04-Jan-06 04-Jan-06 0000-0600: 17 MW SR-ER-NR
61 Jan-06/AP-1679
03-Jan-06
AEL/PT/Trans/2005-06/845
dt03-Jan-06
ADANI
WBSEB
-HPGCL
04-Jan-06 04-Jan-06 0000-0600: 33 MW
0600-2300: 50 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
62 Jan-06/AP-1680
03-Jan-06
CC/NVVN/OA/12/756
dt03-Jan-06
NVVN
ANTA_L
-DTL
04-Jan-06 04-Jan-06 0715-1700: 70 MW
1815-2400: 69 MW
----
63 Jan-06/AP-1681
03-Jan-06
CC/NVVN/OA/12/757
dt03-Jan-06
NVVN
AURAIYA_L
-DTL
04-Jan-06 04-Jan-06 0715-1700: 108 MW
1815-2400: 112 MW
----
64 Jan-06/AP-1682
03-Jan-06
CC/NVVN/OA/12/758
dt03-Jan-06
NVVN
DADRI_L
-DTL
04-Jan-06 04-Jan-06 0715-1700: 146 MW
1815-2300: 134 MW
----
65 Jan-06/AP-1683
03-Jan-06
Xen/RPPC/S&M/181
dt03-Jan-06
JVVNL
PSEB
-JVVNL
03-Jan-06 03-Jan-06 1800-2400: 100 MW ----
66 Jan-06/AP-1684
03-Jan-06
AEL/PT/Trans/2005-06/846
dt03-Jan-06
ADANI
WBSEB
-HPGCL
04-Jan-06 04-Jan-06 2100-2400: 15 MW ER-NR
Radial
67 Jan-06/AP-1685
03-Jan-06
AEL/PT/Trans/2005-06/847
dt03-Jan-06
ADANI
WBSEB
-HPGCL
04-Jan-06 04-Jan-06 0500-0600: 18 MW
0600-1700: 50 MW
1700-2300: 0 MW
2300-2400: 45 MW
ER-WR-NR
68 Jan-06/AP-1686
03-Jan-06
PTC/OA/1213D
dt03-Jan-06
PTC
GUVNL
-HPGCL
04-Jan-06 04-Jan-06 0000-0500: 50 MW
0500-0600: 32 MW
1700-2300: 45 MW
WR-NR
69 Jan-06/AP-1687
03-Jan-06
CC/NVVN/OA/12/748
dt03-Jan-06
NVVN
DADRI_L
-DTL
03-Jan-06 03-Jan-06 1200-1300: 33 MW
1300-1330: 35 MW
1330-1400: 65 MW
1400-1430: 85 MW
1430-1530: 84 MW
1530-1615: 82 MW
----
70 Jan-06/AP-1688
03-Jan-06
CC/NVVN/OA/12/749
dt03-Jan-06
NVVN
AURAIYA_L
-DTL
03-Jan-06 03-Jan-06 1045-1130: 103 MW
1130-1330: 102 MW
1330-1400: 135 MW
1400-1430: 115 MW
1430-1530: 116 MW
1530-1615: 118 MW
----
71 Jan-06/AP-1689
03-Jan-06
CC/NVVN/OA/12/750
dt03-Jan-06
NVVN
ANTA_L
-DTL
03-Jan-06 03-Jan-06 1045-1100: 70 MW
1100-1200: 67 MW
1200-1230: 66 MW
1230-1300: 65 MW
1300-1330: 63 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
72 Jan-06/AP-1690
03-Jan-06
CC/NVVN/OA/12/753
dt03-Jan-06
NVVN
ANTA_L
-J & K
04-Jan-06 04-Jan-06 0600-1200: 20 MW
1700-2300: 50 MW
----
73 Jan-06/AP-1691
03-Jan-06
CC/NVVN/OA/12/754
dt03-Jan-06
NVVN
AURAIYA_L
-J & K
04-Jan-06 04-Jan-06 0600-1200: 30 MW
1700-2300: 70 MW
----
74 Jan-06/AP-1692
03-Jan-06
CC/NVVN/OA/12/755
dt03-Jan-06
NVVN
DADRI_L
-J & K
04-Jan-06 04-Jan-06 0600-1200: 50 MW
1700-2300: 80 MW
----
75 Jan-06/AP-1693
04-Jan-06
Xen/RPPC/S&M/185
dt04-Jan-06
JVVNL
PSEB
-JVVNL
05-Jan-06 05-Jan-06 0000-0400: 250 MW
0400-0500: 100 MW
----
76 Jan-06/AP-1696
04-Jan-06
CC/NVVN/OA/765
dt04-Jan-06
NVVN
DADRI_L
-DTL
05-Jan-06 05-Jan-06 0700-1500: 135 MW ----
77 Jan-06/AP-1694
04-Jan-06
CC/NVVN/OA/763
dt04-Jan-06
NVVN
ANTA_L
-DTL
05-Jan-06 05-Jan-06 0700-1400: 57 MW ----
78 Jan-06/AP-1695
04-Jan-06
CC/NVVN/OA/764
dt04-Jan-06
NVVN
AURAIYA_L
-DTL
05-Jan-06 05-Jan-06 0700-1500: 84 MW ----
79 Jan-06/AP-1697
04-Jan-06
CC/NVVN/OA/762
dt04-Jan-06
NVVN
DADRI_L
-J & K
05-Jan-06 05-Jan-06 1700-2300: 90 MW ----
80 Jan-06/AP-1699
04-Jan-06
CC/NVVN/OA/760
dt04-Jan-06
NVVN
ANTA_L
-J & K
05-Jan-06 05-Jan-06 1700-2300: 45 MW ----
81 Jan-06/AP-1698
04-Jan-06
CC/NVVN/OA/761
dt04-Jan-06
NVVN
AURAIYA_L
-J & K
05-Jan-06 05-Jan-06 1700-2300: 65 MW ----
82 Jan-06/AP-1700
05-Jan-06
Xen Control Room/RPPC/S&M/186
dt05-Jan-06
JVVNL
PSEB
-JVVNL
06-Jan-06 06-Jan-06 0000-0400: 250 MW
0400-0500: 100 MW
----
83 Jan-06/AP-1703
06-Jan-06
Xen Control Room/RPPC/S&M/187
dt06-Jan-06
JVVNL
PSEB
-JVVNL
07-Jan-06 07-Jan-06 0000-0500: 100 MW ----
84 Jan-06/AP-1734
09-Jan-06
Ch-27/HPGCL/PP-50
dt06-Jan-06
HPGCL
DTL
-HPGCL
11-Jan-06 20-Jan-06 0000-0600: 200 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
85 Jan-06/AP-1701
05-Jan-06
CC/NVVN/OA/12/770
dt05-Jan-06
NVVN
DADRI_L
-J & K
06-Jan-06 06-Jan-06 0600-1200: 50 MW
1700-2300: 80 MW
----
86 Jan-06/AP-1702
05-Jan-06
CC/NVVN/OA/12/768
dt05-Jan-06
NVVN
ANTA_L
-J & K
06-Jan-06 06-Jan-06 0600-1200: 20 MW
1700-2300: 50 MW
----
87 Jan-06/AP-1703
05-Jan-06
CC/NVVN/OA/12/769
dt05-Jan-06
NVVN
AURAIYA_L
-J & K
06-Jan-06 06-Jan-06 0600-1200: 30 MW
1700-2300: 70 MW
----
88 Jan-06/AP-1704
05-Jan-06
CC/NVVN/OA/12/773
dt05-Jan-06
NVVN
DADRI_L
-DTL
06-Jan-06 06-Jan-06 0800-1300: 131 MW
2000-2100: 51 MW
----
89 Jan-06/AP-1705
05-Jan-06
CC/NVVN/OA/12/771
dt05-Jan-06
NVVN
ANTA_L
-DTL
06-Jan-06 06-Jan-06 0800-1200: 50 MW
2000-2100: 9 MW
----
90 Jan-06/AP-1706
05-Jan-06
CC/NVVN/OA/12/772
dt05-Jan-06
NVVN
AURAIYA_L
-DTL
06-Jan-06 06-Jan-06 0800-1300: 81 MW
2000-2100: 15 MW
----
91 Jan-06/AP-1708
06-Jan-06
CC/NVVN/OA/12/776
dt06-Jan-06
NVVN
DADRI_L
-J & K
07-Jan-06 07-Jan-06 0600-1200: 100 MW
1700-2300: 135 MW
----
92 Jan-06/AP-1709
06-Jan-06
CC/NVVN/OA/12/775
dt06-Jan-06
NVVN
AURAIYA_L
-J & K
07-Jan-06 07-Jan-06 1700-2300: 71 MW ----
93 Jan-06/AP-1710
06-Jan-06
CC/NVVN/OA/12/778
dt06-Jan-06
NVVN
AURAIYA_L
-DTL
07-Jan-06 07-Jan-06 0730-1300: 95 MW ----
94 Jan-06/AP-1711
06-Jan-06
CC/NVVN/OA/12/777
dt06-Jan-06
NVVN
ANTA_L
-DTL
07-Jan-06 07-Jan-06 0730-1300: 65 MW ----
95 Jan-06/AP-1712
06-Jan-06
CC/NVVN/OA/12/779
dt06-Jan-06
NVVN
DADRI_L
-DTL
07-Jan-06 07-Jan-06 0730-1300: 40 MW ----
96 Jan-06/AP-1732
09-Jan-06
222/2005-06
dt07-Jan-06
TATA
WBSEB
-HPGCL
10-Jan-06 31-Jan-06 0000-0600: 30 MW ER-NR
97 Jan-06/AP-1713
07-Jan-06
Xen Control Room/RPPC/S&M/188
dt07-Jan-06
JVVNL
PSEB
-JVVNL
08-Jan-06 08-Jan-06 0000-0400: 100 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
98 Jan-06/AP-1715
07-Jan-06
CC/NVVN/OA/12/784
dt07-Jan-06
NVVN
DADRI_L
-J & K
08-Jan-06 08-Jan-06 0600-1200: 100 MW
1700-2300: 135 MW
----
99 Jan-06/AP-1714
07-Jan-06
CC/NVVN/OA/12/783
dt07-Jan-06
NVVN
AURAIYA_L
-J & K
08-Jan-06 08-Jan-06 1700-2300: 65 MW ----
100 Jan-06/AP-1716
07-Jan-06
CC/NVVN/OA/12/785
dt07-Jan-06
NVVN
ANTA_L
-DTL
08-Jan-06 08-Jan-06 0900-1530: 59 MW
1700-1830: 8 MW
----
101 Jan-06/AP-1717
07-Jan-06
CC/NVVN/OA/12/786
dt07-Jan-06
NVVN
AURAIYA_L
-DTL
08-Jan-06 08-Jan-06 0900-1530: 89 MW
1700-1830: 31 MW
----
102 Jan-06/AP-1718
07-Jan-06
AEL/PT/Trans/2005-06/870
dt07-Jan-06
ADANI
WBSEB
-HPGCL
08-Jan-06 08-Jan-06 1330-1700: 50 MW ER-NR
103 Jan-06/AP-1719
07-Jan-06
AEL/PT/Trans/2005-06/868
dt07-Jan-06
ADANI
WBSEB
-HPGCL
08-Jan-06 08-Jan-06 1330-1700: 40 MW ER-WR-NR
104 Jan-06/AP-1720
07-Jan-06
AEL/PT/Trans/2005-06/871
dt07-Jan-06
ADANI
WBSEB
-HPGCL
08-Jan-06 08-Jan-06 2100-2400: 22 MW ER-NR
Radial
105 Jan-06/AP-1721
08-Jan-06
PTC/OA/1234 D
dt08-Jan-06
PTC
GUVNL
-HPGCL
08-Jan-06 08-Jan-06 1700-2300: 40 MW WR-NR
106 Jan-06/AP-1722
08-Jan-06
Xen Control Room/RPPC/S&M/189
dt08-Jan-06
JVVNL
PSEB
-JVVNL
09-Jan-06 09-Jan-06 0000-0400: 100 MW ----
107 Jan-06/AP-1723
08-Jan-06
AEL/PT/Trans/2005-06/876
dt08-Jan-06
ADANI
WBSEB
-HPGCL
09-Jan-06 09-Jan-06 0000-0600: 33 MW
0600-1700: 50 MW
ER-NR
108 Jan-06/AP-1724
08-Jan-06
AEL/PT/Trans/2005-06/874
dt08-Jan-06
ADANI
WBSEB
-HPGCL
09-Jan-06 09-Jan-06 0500-0600: 0 MW
0600-1700: 40 MW
ER-WR-NR
109 Jan-06/AP-1725
08-Jan-06
PTC/OA/1237 D
dt08-Jan-06
PTC
GUVNL
-HPGCL
09-Jan-06 09-Jan-06 0000-0500: 40 MW
0500-0600: 29 MW
1700-2300: 40 MW
WR-NR
110 Jan-06/AP-1726
08-Jan-06
224 D/2005-06
dt08-Jan-06
TATA
WBSEB
-HPGCL
09-Jan-06 09-Jan-06 0000-0600: 17 MW ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
111 Jan-06/AP-1727
08-Jan-06
CC/NVVN/OA/12/790
dt08-Jan-06
NVVN
AURAIYA_L
-J & K
09-Jan-06 09-Jan-06 1700-2300: 45 MW ----
112 Jan-06/AP-1728
08-Jan-06
CC/NVVN/OA/12/789
dt08-Jan-06
NVVN
DADRI_L
-J & K
09-Jan-06 09-Jan-06 0600-1200: 100 MW
1700-2300: 155 MW
----
113 Jan-06/AP-1729
08-Jan-06
CC/NVVN/OA/12/793
dt08-Jan-06
NVVN
ANTA_L
-DTL
09-Jan-06 09-Jan-06 0800-1200: 60 MW
1615-2300: 75 MW
----
114 Jan-06/AP-1730
08-Jan-06
CC/NVVN/OA/12/792
dt08-Jan-06
NVVN
AURAIYA_L
-DTL
09-Jan-06 09-Jan-06 0800-1200: 90 MW
1200-1300: 78 MW
1615-2300: 89 MW
----
115 Jan-06/AP-1731
08-Jan-06
CC/NVVN/OA/12/791
dt08-Jan-06
NVVN
DADRI_L
-DTL
09-Jan-06 09-Jan-06 0800-1300: 22 MW
1615-2300: 41 MW
----
116 Jan-06/AP-1733
09-Jan-06
Xen Control Room/RPPC/S&M/190
dt09-Jan-06
JVVNL
PSEB
-JVVNL
10-Jan-06 10-Jan-06 0000-0400: 100 MW ----
117 Jan-06/AP-1744
10-Jan-06
8/Comm-B(P)
dt09-Jan-06
UPCL
PSEB
-UPCL
11-Jan-06 20-Jan-06 0000-2400: 75 MW ----
118 Jan-06/AP-1745
10-Jan-06
10/Comm-B(H)
dt09-Jan-06
UPCL
HPGCL
-UPCL
11-Jan-06 20-Jan-06 0000-2400: 30 MW ----
119 Jan-06/AP-1742
09-Jan-06
PTC/OA/1241 D
dt09-Jan-06
PTC
GUVNL
-HPGCL
10-Jan-06 10-Jan-06 0000-0500: 45 MW
0500-0600: 180 MW
1700-2100: 45 MW
2100-2300: 23 MW
WR-NR
120 Jan-06/AP-1741
09-Jan-06
AEL/PT/Trans/2005-06/879
dt09-Jan-06
ADANI
WBSEB
-HPGCL
10-Jan-06 10-Jan-06 0500-0600: 75 MW
0600-1700: 80 MW
ER-WR-NR
121 Jan-06/AP-1740
09-Jan-06
AEL/PT/Trans/2005-06/885
dt09-Jan-06
ADANI
WBSEB
-HPGCL
10-Jan-06 10-Jan-06 2100-2300: 23 MW
2300-2400: 45 MW
ER-WR-NR
122 Jan-06/AP-1735
09-Jan-06
AEL/PT/Trans/2005-06/881
dt09-Jan-06
ADANI
WBSEB
-HPGCL
10-Jan-06 10-Jan-06 0000-2300: 20 MW ER-NR
123 Jan-06/AP-1736
09-Jan-06
CC/NVVN/OA/01/797
dt09-Jan-06
NVVN
ANTA_L
-DTL
10-Jan-06 10-Jan-06 0800-1000: 15 MW
1000-1200: 60 MW
1300-1500: 52 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
124 Jan-06/AP-1737
09-Jan-06
CC/NVVN/OA/01/798
dt09-Jan-06
NVVN
AURAIYA_L
-DTL
10-Jan-06 10-Jan-06 0800-1000: 85 MW
1000-1200: 80 MW
1300-1630: 84 MW
----
125 Jan-06/AP-1738
09-Jan-06
CC/NVVN/OA/01/795
dt09-Jan-06
NVVN
AURAIYA_L
-J & K
10-Jan-06 10-Jan-06 1700-2300: 86 MW ----
126 Jan-06/AP-1739
09-Jan-06
CC/NVVN/OA/01/796
dt09-Jan-06
NVVN
DADRI_L
-J & K
10-Jan-06 10-Jan-06 0600-1200: 97 MW
1700-2300: 130 MW
----
127 Jan-06/AP-1743
10-Jan-06
CC/NVVN/OA/01/794
dt10-Jan-06
NVVN
ANTA_L
-J & K
10-Jan-06 10-Jan-06 1700-2300: 60 MW ----
128 Jan-06/AP-1746
10-Jan-06
Xen Control Room/RPPC/S&M/191
dt10-Jan-06
JVVNL
PSEB
-JVVNL
11-Jan-06 11-Jan-06 0000-0400: 100 MW ----
129 Jan-06/AP-1747
10-Jan-06
AEL/PT/Trans/2005-06/890
dt10-Jan-06
ADANI
WBSEB
-HPGCL
11-Jan-06 11-Jan-06 0000-0600: 20 MW
0600-2300: 50 MW
ER-NR
130 Jan-06/AP-1748
10-Jan-06
AEL/PT/Trans/2005-06/889
dt10-Jan-06
ADANI
WBSEB
-HPGCL
11-Jan-06 11-Jan-06 0500-0600: 11 MW
0600-1700: 40 MW
ER-WR-NR
131 Jan-06/AP-1749
10-Jan-06
PTC/OA/1246D
dt10-Jan-06
PTC
GUVNL
-HPGCL
11-Jan-06 11-Jan-06 0000-0500: 40 MW
0500-0600: 29 MW
1700-2300: 40 MW
WR-NR
132 Jan-06/AP-1750
10-Jan-06
CC/NVVN/OA/800
dt10-Jan-06
NVVN
ANTA_L
-J & K
11-Jan-06 11-Jan-06 0600-1200: 30 MW
1700-2300: 44 MW
----
133 Jan-06/AP-1751
10-Jan-06
CC/NVVN/OA/801
dt10-Jan-06
NVVN
AURAIYA_L
-J & K
11-Jan-06 11-Jan-06 0600-1200: 40 MW
1700-2300: 107 MW
----
134 Jan-06/AP-1752
10-Jan-06
CC/NVVN/OA/802
dt10-Jan-06
NVVN
DADRI_L
-J & K
11-Jan-06 11-Jan-06 0600-1200: 20 MW
1700-2300: 49 MW
----
135 Jan-06/AP-1753
10-Jan-06
CC/NVVN/OA/803
dt10-Jan-06
NVVN
ANTA_L
-DTL
11-Jan-06 11-Jan-06 0800-1200: 30 MW ----
136 Jan-06/AP-1754
10-Jan-06
CC/NVVN/OA/804
dt10-Jan-06
NVVN
AURAIYA_L
-DTL
11-Jan-06 11-Jan-06 0800-1200: 40 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
137 Jan-06/AP-1755
10-Jan-06
CC/NVVN/OA/805
dt10-Jan-06
NVVN
DADRI_L
-DTL
11-Jan-06 11-Jan-06 0800-1200: 20 MW ----
138 Jan-06/AP-1756
11-Jan-06
AEL/PT/Trans/2005-06/899
dt11-Jan-06
ADANI
WBSEB
-HPGCL
11-Jan-06 11-Jan-06 2300-2400: 50 MW ER-NR
139 Jan-06/AP-1812
16-Jan-06
PTC/OA/1109
dt10-Jan-06
PTC
MALANA
-HPGCL
20-Jan-06 20-Jan-06 0300-0900: 81 MW ----
140 Jan-06/AP-1757
11-Jan-06
Xen Control Room/RPPC/S&M/192
dt11-Jan-06
JVVNL
PSEB
-JVVNL
12-Jan-06 12-Jan-06 0000-0400: 100 MW ----
141 Jan-06/AP-1758
11-Jan-06
AEL/PT/Trans/2005-06/900
dt11-Jan-06
ADANI
WBSEB
-HPGCL
12-Jan-06 12-Jan-06 2100-2300: 40 MW
2300-2400: 50 MW
ER-NR
142 Jan-06/AP-1759
11-Jan-06
AEL/PT/Trans/2005-06/898
dt11-Jan-06
ADANI
WBSEB
-HPGCL
12-Jan-06 12-Jan-06 0000-0600: 10 MW
0600-2100: 50 MW
2100-2300: 40 MW
ER-NR
143 Jan-06/AP-1767
11-Jan-06
AEL/PT/Trans/2005-06/887
dt11-Jan-06
ADANI
WBSEB
-HPGCL
12-Jan-06 12-Jan-06 0600-0800: 45 MW
0800-1200: 50 MW
1200-1600: 40 MW
1600-1700: 50 MW
ER-WR-NR
144 Jan-06/AP-1760
11-Jan-06
PTC/OA/1254D
dt11-Jan-06
PTC
JINDAL TPS
-HPGCL
12-Jan-06 12-Jan-06 0000-0600: 10 MW SR-ER-NR
145 Jan-06/AP-1761
11-Jan-06
CC/NVVN/OA/01/809
dt11-Jan-06
NVVN
ANTA_L
-J & K
12-Jan-06 12-Jan-06 0600-1200: 75 MW
1700-2300: 60 MW
----
146 Jan-06/AP-1762
12-Jan-06
CC/NVVN/OA/01/810
dt12-Jan-06
NVVN
AURAIYA_L
-J & K
12-Jan-06 12-Jan-06 0600-1200: 105 MW
1700-2300: 90 MW
----
147 Jan-06/AP-1763
11-Jan-06
CC/NVVN/OA/01/811
dt11-Jan-06
NVVN
DADRI_L
-J & K
12-Jan-06 12-Jan-06 0600-1200: 23 MW
1700-2300: 50 MW
----
148 Jan-06/AP-1764
11-Jan-06
CC/NVVN/OA/01/806
dt11-Jan-06
NVVN
ANTA_L
-DTL
12-Jan-06 12-Jan-06 0800-1200: 30 MW ----
149 Jan-06/AP-1765
11-Jan-06
CC/NVVN/OA/01/807
dt11-Jan-06
NVVN
AURAIYA_L
-DTL
12-Jan-06 12-Jan-06 0800-1200: 45 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
150 Jan-06/AP-1766
11-Jan-06
CC/NVVN/OA/01/808
dt11-Jan-06
NVVN
DADRI_L
-DTL
12-Jan-06 12-Jan-06 0800-1200: 23 MW ----
151 Jan-06/AP-1769
12-Jan-06
AEL/PT/Trans/2005-06/904
dt12-Jan-06
ADANI
WBSEB
-HPGCL
13-Jan-06 13-Jan-06 0000-0500: 13 MW
0500-0600: 15 MW
0600-1000: 50 MW
1000-1200: 45 MW
1200-1600: 39 MW
1600-2100: 50 MW
ER-NR
152 Jan-06/AP-1770
12-Jan-06
AEL/PT/Trans/2005-06/905
dt12-Jan-06
ADANI
WBSEB
-HPGCL
13-Jan-06 13-Jan-06 2100-2400: 50 MW ER-NR
153 Jan-06/AP-1771
12-Jan-06
PTC/OA/1259D
dt12-Jan-06
PTC
BSEB
-HPGCL
13-Jan-06 13-Jan-06 0000-0500: 7 MW
0500-0600: 5 MW
1000-1200: 5 MW
1200-1600: 11 MW
ER-NR
154 Jan-06/AP-1768
12-Jan-06
XEN/RPPC/S&M/JPR/193
dt12-Jan-06
JVVNL
PSEB
-JVVNL
13-Jan-06 13-Jan-06 0000-0400: 100 MW ----
155 Jan-06/AP-1773
12-Jan-06
PTC/OA/1258D
dt12-Jan-06
PTC
GUVNL
-HPGCL
13-Jan-06 13-Jan-06 0000-0600: 40 MW
0600-0700: 35 MW
0700-0800: 33 MW
1500-2400: 40 MW
WR-NR
156 Jan-06/AP-1781
13-Jan-06
04/01/2006
dt12-Jan-06
HPSEB
PSEB
-HPSEB
16-Jan-06 31-Jan-06 0000-2400: 100 MW ----
157 Jan-06/AP-1782
13-Jan-06
05/01/2006
dt12-Jan-06
HPSEB
DTL
-HPSEB
16-Jan-06 31-Jan-06 0000-0600: 150 MW ----
158 Jan-06/AP-1783
13-Jan-06
06/01/2006
dt12-Jan-06
HPSEB
DTL
-HPSEB
16-Jan-06 31-Jan-06 1200-1800: 200 MW ----
159 Jan-06/AP-1774
12-Jan-06
CC/NVVN/OA/01/812
dt12-Jan-06
NVVN
DADRI_L
-J & K
13-Jan-06 13-Jan-06 0600-1200: 40 MW
1700-2300: 80 MW
----
160 Jan-06/AP-1775
12-Jan-06
CC/NVVN/OA/01/813
dt12-Jan-06
NVVN
AURAIYA_L
-J & K
13-Jan-06 13-Jan-06 0600-1200: 40 MW
1700-2300: 70 MW
----
161 Jan-06/AP-1776
12-Jan-06
CC/NVVN/OA/01/814
dt12-Jan-06
NVVN
ANTA_L
-J & K
13-Jan-06 13-Jan-06 0600-1200: 20 MW
1700-2300: 50 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
162 Jan-06/AP-1777
12-Jan-06
CC/NVVN/OA/01/815
dt12-Jan-06
NVVN
DADRI_L
-DTL
13-Jan-06 13-Jan-06 0800-1200: 15 MW ----
163 Jan-06/AP-1778
12-Jan-06
CC/NVVN/OA/01/816
dt12-Jan-06
NVVN
AURAIYA_L
-DTL
13-Jan-06 13-Jan-06 0800-1200: 55 MW ----
164 Jan-06/AP-1779
12-Jan-06
CC/NVVN/OA/01/817
dt12-Jan-06
NVVN
ANTA_L
-DTL
13-Jan-06 13-Jan-06 0800-1000: 30 MW
1000-1200: 40 MW
----
165 Jan-06/AP-1784
13-Jan-06
AEL/PT/Trans/2005-06/912
dt13-Jan-06
ADANI
WBSEB
-HPGCL
14-Jan-06 14-Jan-06 0000-0600: 20 MW
0600-2100: 50 MW
2100-2300: 10 MW
ER-NR
166 Jan-06/AP-1785
13-Jan-06
AEL/PT/Trans/2005-06/913
dt13-Jan-06
ADANI
WBSEB
-HPGCL
14-Jan-06 14-Jan-06 2100-2300: 40 MW
2300-2400: 50 MW
ER-NR
167 Jan-06/AP-1787
13-Jan-06
AEL/PT/Trans/2005-06/911
dt13-Jan-06
ADANI
WBSEB
-HPGCL
14-Jan-06 14-Jan-06 0500-1700: 55 MW ER-WR-NR
168 Jan-06/AP-1780
13-Jan-06
XEN/S&M/JPD/195
dt13-Jan-06
JVVNL
PSEB
-JVVNL
14-Jan-06 14-Jan-06 0000-0400: 100 MW ----
169 Jan-06/AP-1786
13-Jan-06
PTC/OA/1266D
dt13-Jan-06
PTC
GUVNL
-HPGCL
14-Jan-06 14-Jan-06 0000-0500: 42 MW
0500-1700: 205 MW
1700-1800: 300 MW
1800-2200: 200 MW
2200-2300: 300 MW
2300-2400: 42 MW
WR-NR
170 Jan-06/AP-1788
13-Jan-06
CC/NVVN/OA/01/819
dt13-Jan-06
NVVN
DADRI_L
-J & K
14-Jan-06 14-Jan-06 0600-1200: 40 MW
1700-2300: 80 MW
----
171 Jan-06/AP-1789
13-Jan-06
CC/NVVN/OA/01/821
dt13-Jan-06
NVVN
ANTA_L
-J & K
14-Jan-06 14-Jan-06 0600-1200: 20 MW
1700-2300: 50 MW
----
172 Jan-06/AP-1790
13-Jan-06
CC/NVVN/OA/01/820
dt13-Jan-06
NVVN
AURAIYA_L
-J & K
14-Jan-06 14-Jan-06 0600-1200: 40 MW
1700-2300: 70 MW
----
173 Jan-06/AP-1791
13-Jan-06
CC/NVVN/OA/01/822
dt13-Jan-06
NVVN
DADRI_L
-DTL
14-Jan-06 14-Jan-06 0800-1000: 40 MW
1000-1200: 32 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
174 Jan-06/AP-1792
13-Jan-06
CC/NVVN/OA/01/824
dt13-Jan-06
NVVN
ANTA_L
-DTL
14-Jan-06 14-Jan-06 0800-1000: 20 MW
1000-1200: 44 MW
----
175 Jan-06/AP-1793
13-Jan-06
CC/NVVN/OA/01/823
dt13-Jan-06
NVVN
AURAIYA_L
-DTL
14-Jan-06 14-Jan-06 0800-1000: 40 MW
1000-1200: 60 MW
----
176 Jan-06/AP-1794
14-Jan-06
XEN/RPPC/S&M/JPR/197
dt14-Jan-06
JVVNL
PSEB
-JVVNL
15-Jan-06 15-Jan-06 0000-0400: 100 MW ----
177 Jan-06/AP-1795
14-Jan-06
AEL/PT/TRANS/2005-06/919
dt14-Jan-06
ADANI
WBSEB
-HPGCL
15-Jan-06 15-Jan-06 0000-0600: 22 MW
0600-2100: 50 MW
2100-2300: 17 MW
ER-NR
178 Jan-06/AP-1796
14-Jan-06
AEL/PT/TRANS/2005-06/920R1
dt14-Jan-06
ADANI
WBSEB
-HPGCL
15-Jan-06 15-Jan-06 2100-2300: 33 MW
2300-2400: 50 MW
ER-NR
179 Jan-06/AP-1797
14-Jan-06
AEL/PT/TRANS/2005-06/918
dt14-Jan-06
ADANI
WBSEB
-HPGCL
15-Jan-06 15-Jan-06 0500-0800: 55 MW
0800-1700: 21 MW
ER-WR-NR
180 Jan-06/AP-1798
14-Jan-06
PTC/OA/1271D
dt14-Jan-06
PTC
GUVNL
-HPGCL
15-Jan-06 15-Jan-06 0000-0500: 42 MW
0500-0800: 205 MW
0800-1700: 79 MW
1700-1800: 160 MW
1800-2300: 300 MW
2300-2400: 42 MW
WR-NR
181 Jan-06/AP-1799
14-Jan-06
CC/NVVN/OA/01/825
dt14-Jan-06
NVVN
DADRI_L
-J & K
15-Jan-06 15-Jan-06 0600-1200: 50 MW
1700-2300: 63 MW
----
182 Jan-06/AP-1800
14-Jan-06
CC/NVVN/OA/01/826
dt14-Jan-06
NVVN
AURAIYA_L
-J & K
15-Jan-06 15-Jan-06 0600-1200: 50 MW
1700-2300: 107 MW
----
183 Jan-06/AP-1801
14-Jan-06
CC/NVVN/OA/01/827
dt14-Jan-06
NVVN
ANTA_L
-J & K
15-Jan-06 15-Jan-06 1700-2300: 30 MW ----
184 Jan-06/AP-2066
07-Jan-06
CC/NVVN/OA/01/________
dt07-Jan-06
NVVN
DADRI_L
-DTL
08-Jan-06 08-Jan-06 1200-1530: 122 MW
1700-1830: 43 MW
----
185 Jan-06/AP-2067
09-Jan-06
CC/NVVN/OA/01/________
dt09-Jan-06
NVVN
DADRI_L
-DTL
10-Jan-06 10-Jan-06 1600-1630: 18 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
186 Jan-06/AP-2068
14-Jan-06
CC/NVVN/OA/01/________
dt14-Jan-06
NVVN
DADRI_L
-DTL
15-Jan-06 15-Jan-06 1115-1200: 11 MW ----
187 Jan-06/AP-1802
15-Jan-06
Xen/RPPC/S&M/JPR/198
dt15-Jan-06
JVVNL
PSEB
-JVVNL
16-Jan-06 16-Jan-06 0000-0400: 100 MW ----
188 Jan-06/AP-1803
15-Jan-06
AEL/PT/TRANS/2005-06/928
dt15-Jan-06
ADANI
WBSEB
-HPGCL
16-Jan-06 16-Jan-06 0000-0600: 20 MW
0600-2100: 50 MW
2100-2300: 17 MW
ER-NR
189 Jan-06/AP-1804
15-Jan-06
AEL/PT/TRANS/2005-06/927
dt15-Jan-06
ADANI
WBSEB
-HPGCL
16-Jan-06 16-Jan-06 2100-2300: 33 MW
2300-2400: 50 MW
ER-NR
190 Jan-06/AP-1805
15-Jan-06
AEL/PT/Trans/2005-06/925
dt15-Jan-06
ADANI
WBSEB
-HPGCL
16-Jan-06 16-Jan-06 0500-1700: 42 MW ER-WR-NR
191 Jan-06/AP-1806
15-Jan-06
PTC/OA/1275D
dt15-Jan-06
PTC
GUVNL
-HPGCL
16-Jan-06 16-Jan-06 0000-0500: 42 MW WR-NR
192 Jan-06/AP-1807
15-Jan-06
CC/NVVN/OA/01/836
dt15-Jan-06
NVVN
DADRI_L
-J & K
16-Jan-06 16-Jan-06 0600-0800: 40 MW
0800-1200: 30 MW
1700-2300: 70 MW
----
193 Jan-06/AP-1808
15-Jan-06
CC/NVVN/OA/01/834
dt15-Jan-06
NVVN
ANTA_L
-J & K
16-Jan-06 16-Jan-06 0600-0800: 20 MW
0800-1200: 15 MW
1700-2300: 16 MW
----
194 Jan-06/AP-1809
15-Jan-06
CC/NVVN/OA/01/835
dt15-Jan-06
NVVN
AURAIYA_L
-J & K
16-Jan-06 16-Jan-06 0600-0800: 40 MW
0800-1200: 30 MW
1700-2300: 114 MW
----
195 Jan-06/AP-1810
15-Jan-06
CC/NVVN/OA/01/833
dt15-Jan-06
NVVN
DADRI_L
-DTL
16-Jan-06 16-Jan-06 0800-1200: 27 MW ----
196 Jan-06/AP-2069
14-Jan-06
CC/NVVN/OA/01/_____________
dt14-Jan-06
NVVN
ANTA_L
-DTL
15-Jan-06 15-Jan-06 1115-1200: 12 MW ----
197 Jan-06/AP-1811
15-Jan-06
CC/NVVN/OA/01/832
dt15-Jan-06
NVVN
AURAIYA_L
-DTL
16-Jan-06 16-Jan-06 0800-1200: 55 MW ----
198 Jan-06/AP-1813
16-Jan-06
XEN/RPPC/S&M/199
dt16-Jan-06
JVVNL
PSEB
-JVVNL
17-Jan-06 17-Jan-06 0000-0400: 100 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
199 Jan-06/AP-1815
16-Jan-06
AEL/PT/Trans/2005-06/932
dt16-Jan-06
ADANI
WBSEB
-HPGCL
17-Jan-06 17-Jan-06 0000-0600: 20 MW
0600-1600: 33 MW
1600-1700: 0 MW
1700-2100: 50 MW
2100-2300: 25 MW
ER-NR
200 Jan-06/AP-1816
16-Jan-06
AEL/TR/Trans/2005-06/933
dt16-Jan-06
ADANI
WBSEB
-HPGCL
17-Jan-06 17-Jan-06 2100-2300: 25 MW
2300-2400: 50 MW
ER-NR
201 Jan-06/AP-1817
16-Jan-06
AEL/PT/TRANS/2005-06/931
dt16-Jan-06
ADANI
WBSEB
-HPGCL
17-Jan-06 17-Jan-06 0500-1700: 42 MW ER-WR-NR
202 Jan-06/AP-1818
16-Jan-06
PTC/OA/1281D
dt16-Jan-06
PTC
GUVNL
-HPGCL
17-Jan-06 17-Jan-06 0000-0600: 42 MW WR-NR
203 Jan-06/AP-1819
16-Jan-06
223
dt16-Jan-06
TATA
WBSEB
-DTL
17-Jan-06 17-Jan-06 0600-1600: 17 MW
1600-1700: 50 MW
ER-NR
204 Jan-06/AP-1814
16-Jan-06
Xen/RPPC/S&M/JPR/200
dt16-Jan-06
JVVNL
PSEB
-JVVNL
17-Jan-06 17-Jan-06 0000-0400: 100 MW ----
205 Jan-06/AP-1820
16-Jan-06
CC/NVVN/OA/01/837
dt16-Jan-06
NVVN
ANTA_L
-J & K
17-Jan-06 17-Jan-06 0600-1200: 30 MW
1700-2300: 35 MW
----
206 Jan-06/AP-1821
16-Jan-06
CC/NVVN/OA/01/838
dt16-Jan-06
NVVN
AURAIYA_L
-J & K
17-Jan-06 17-Jan-06 0930-1200: 94 MW
1700-2300: 105 MW
----
207 Jan-06/AP-1822
16-Jan-06
CC/NVVN/OA/01/839
dt16-Jan-06
NVVN
DADRI_L
-J & K
17-Jan-06 17-Jan-06 0600-0800: 70 MW
0800-1200: 55 MW
1700-2300: 60 MW
----
208 Jan-06/AP-1823
16-Jan-06
CC/NVVN/OA/01/841
dt16-Jan-06
NVVN
AURAIYA_L
-DTL
17-Jan-06 17-Jan-06 0800-1100: 85 MW ----
209 Jan-06/AP-1824
17-Jan-06
XEN/RPPC/S&M/203
dt17-Jan-06
JVVNL
PSEB
-JVVNL
17-Jan-06 17-Jan-06 1800-1900: 50 MW
1900-2400: 100 MW
----
210 Jan-06/AP-1825
17-Jan-06
XEN/RPPC/S&M/JPR/201
dt17-Jan-06
JVVNL
PSEB
-JVVNL
18-Jan-06 18-Jan-06 0000-0400: 200 MW ----
211 Jan-06/AP-1826
17-Jan-06
AEL/PT/TRANS/2005-06/938R1
dt17-Jan-06
ADANI
WBSEB
-HPGCL
18-Jan-06 18-Jan-06 0400-0600: 20 MW
0600-1000: 33 MW
1000-1200: 27 MW
1200-1600: 26 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
212 Jan-06/AP-1827
17-Jan-06
PTC/OA/1291D
dt17-Jan-06
PTC
BSEB
-HPGCL
18-Jan-06 18-Jan-06 1000-1200: 9 MW
1200-1600: 10 MW
ER-NR
213 Jan-06/AP-1828
17-Jan-06
AEL/PT/TRANS/2005-06/939
dt17-Jan-06
ADANI
WBSEB
-HPGCL
18-Jan-06 18-Jan-06 2100-2400: 25 MW ER-NR
214 Jan-06/AP-1829
17-Jan-06
225
dt17-Jan-06
TATA
WBSEB
-DTL
18-Jan-06 18-Jan-06 0600-1000: 17 MW
1000-1200: 14 MW
1200-1600: 13 MW
1600-1700: 50 MW
ER-NR
215 Jan-06/AP-1830
17-Jan-06
AEL/PT/TRANS/2005-06/941
dt17-Jan-06
ADANI
WBSEB
-HPGCL
18-Jan-06 18-Jan-06 1700-2100: 50 MW
2100-2300: 25 MW
ER-NR
216 Jan-06/AP-1833
17-Jan-06
AEL/PT/TRANS/2005-06
dt17-Jan-06
ADANI
WBSEB
-HPGCL
18-Jan-06 18-Jan-06 0500-1600: 42 MW
1600-1700: 40 MW
ER-WR-NR
217 Jan-06/AP-1835
18-Jan-06
226
dt17-Jan-06
TATA
WBSEB
-DTL
19-Jan-06 31-Jan-06 0600-1700: 30 MW ER-NR
218 Jan-06/AP-1831
17-Jan-06
CC/NVVN/OA/01/844
dt17-Jan-06
NVVN
AURAIYA_L
-J & K
18-Jan-06 18-Jan-06 1700-2300: 109 MW ----
219 Jan-06/AP-1832
17-Jan-06
CC/NVVN/OA/01/845
dt17-Jan-06
NVVN
DADRI_L
-J & K
18-Jan-06 18-Jan-06 1700-2300: 60 MW ----
220 Jan-06/AP-1834
18-Jan-06
XEN/RPPC/S&M/205
dt18-Jan-06
JVVNL
PSEB
-JVVNL
18-Jan-06 18-Jan-06 1800-2400: 100 MW ----
221 Jan-06/AP-1836
18-Jan-06
XEN/RPPC/S&M/206
dt18-Jan-06
JVVNL
PSEB
-JVVNL
19-Jan-06 19-Jan-06 0000-0400: 200 MW ----
222 Jan-06/AP-1837
18-Jan-06
PTC/OA/1296D
dt18-Jan-06
PTC
BSEB
-UPPCL
19-Jan-06 19-Jan-06 0000-0400: 20 MW
0400-0500: 8 MW
0500-0600: 3 MW
0600-1000: 2 MW
1000-1200: 5 MW
1200-1600: 6 MW
1600-2300: 0 MW
2300-2400: 31 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
223 Jan-06/AP-1838
18-Jan-06
AEL/PT/Trans/2005-06/944
dt18-Jan-06
ADANI
WBSEB
-HPGCL
19-Jan-06 19-Jan-06 0400-0500: 12 MW
0500-0600: 17 MW
0600-1000: 19 MW
1000-1200: 15 MW
1200-1600: 14 MW
ER-NR
224 Jan-06/AP-1839
18-Jan-06
AEL/PT/Trans/2005-06/945
dt18-Jan-06
ADANI
WBSEB
-HPGCL
19-Jan-06 19-Jan-06 1700-2100: 50 MW
2100-2300: 25 MW
ER-NR
225 Jan-06/AP-1840
18-Jan-06
AEL/PT/Trans/2005-06/946
dt18-Jan-06
ADANI
WBSEB
-HPGCL
19-Jan-06 19-Jan-06 2100-2300: 25 MW
2300-2400: 19 MW
ER-NR
226 Jan-06/AP-1854
20-Jan-06
CH-287/hpgc/pp-50
dt18-Jan-06
HPGCL
DTL
-HPGCL
21-Jan-06 31-Jan-06 0000-0600: 200 MW ----
227 Jan-06/AP-1841
18-Jan-06
07/01/2006
dt18-Jan-06
HPSEB
PSEB
-HPSEB
19-Jan-06 19-Jan-06 0600-1800: 100 MW ----
228 Jan-06/AP-1842
18-Jan-06
CC/NVVN/OA/01/853
dt18-Jan-06
NVVN
DADRI_L
-J & K
19-Jan-06 19-Jan-06 0600-1200: 63 MW
1700-2300: 63 MW
----
229 Jan-06/AP-1843
18-Jan-06
CC/NVVN/OA/01/852
dt18-Jan-06
NVVN
AURAIYA_L
-J & K
19-Jan-06 19-Jan-06 0600-1200: 37 MW
1700-2300: 137 MW
----
230 Jan-06/AP-1845
19-Jan-06
08/01/2006
dt18-Jan-06
HPSEB
PSEB
-HPSEB
20-Jan-06 26-Jan-06 0600-1800: 100 MW ----
231 Jan-06/AP-1855
20-Jan-06
9/Com-B(P)
dt19-Jan-06
UPCL
PSEB
-UPCL
21-Jan-06 31-Jan-06 0000-2400: 70 MW ----
232 Jan-06/AP-1856
20-Jan-06
11/Com-B(H)
dt19-Jan-06
UPCL
HPGCL
-UPCL
21-Jan-06 31-Jan-06 0000-2400: 40 MW ----
233 Jan-06/AP-1846
19-Jan-06
XEN/S&M/RPPC/JPR/209
dt19-Jan-06
JVVNL
PSEB
-JVVNL
20-Jan-06 20-Jan-06 0000-0500: 200 MW ----
234 Jan-06/AP-1847
19-Jan-06
AEL/PT/Trans/2005-06/952
dt19-Jan-06
ADANI
WBSEB
-HPGCL
20-Jan-06 20-Jan-06 0400-1600: 20 MW ER-NR
235 Jan-06/AP-1848
19-Jan-06
AEL/PT/Trans/2005-06/953
dt19-Jan-06
ADANI
WBSEB
-HPGCL
20-Jan-06 20-Jan-06 1700-2100: 50 MW
2100-2300: 25 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
236 Jan-06/AP-1849
19-Jan-06
AEL/PT/Trans/2005-06/954
dt19-Jan-06
ADANI
WBSEB
-HPGCL
20-Jan-06 20-Jan-06 2100-2400: 25 MW ER-NR
237 Jan-06/AP-1851
19-Jan-06
AEL/PT/Trans/2005-06/955
dt19-Jan-06
ADANI
WBSEB
-HPGCL
20-Jan-06 20-Jan-06 0600-0800: 80 MW ER-WR-NR
238 Jan-06/AP-1850
19-Jan-06
XEN/S&M/RPPC/210
dt19-Jan-06
JVVNL
PSEB
-JVVNL
19-Jan-06 19-Jan-06 1800-2400: 50 MW ----
239 Jan-06/AP-1852
19-Jan-06
CC/NVVN/OA/01/855
dt19-Jan-06
NVVN
AURAIYA_L
-J & K
20-Jan-06 20-Jan-06 0600-1200: 30 MW
1700-2300: 130 MW
----
240 Jan-06/AP-1853
19-Jan-06
CC/NVVN/OA/01/856
dt19-Jan-06
NVVN
DADRI_L
-J & K
20-Jan-06 20-Jan-06 0600-1200: 70 MW
1700-2300: 70 MW
----
241 Jan-06/AP-1858
20-Jan-06
XEN/RPPC/S&M/211
dt20-Jan-06
JVVNL
PSEB
-JVVNL
21-Jan-06 21-Jan-06 0000-0500: 200 MW ----
242 Jan-06/AP-1859
20-Jan-06
AEL/PT/TRANS/2005-06/960
dt20-Jan-06
ADANI
WBSEB
-HPGCL
21-Jan-06 21-Jan-06 0400-1600: 20 MW ER-NR
243 Jan-06/AP-1860
20-Jan-06
AEL/PT/Trans/2005-06/961
dt20-Jan-06
ADANI
WBSEB
-HPGCL
21-Jan-06 21-Jan-06 1700-2100: 50 MW
2100-2300: 25 MW
ER-NR
244 Jan-06/AP-1861
20-Jan-06
AEL/PT/Trans/2005-06/962
dt20-Jan-06
ADANI
WBSEB
-HPGCL
21-Jan-06 21-Jan-06 2100-2400: 25 MW ER-NR
245 Jan-06/AP-1863
20-Jan-06
AEL/PT/Trans/2005-06/963
dt20-Jan-06
ADANI
WBSEB
-HPGCL
21-Jan-06 21-Jan-06 0500-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
246 Jan-06/AP-1857
20-Jan-06
XEN/S&M/RPPC/JPR
dt20-Jan-06
JVVNL
PSEB
-JVVNL
20-Jan-06 20-Jan-06 1800-2000: 50 MW
2000-2400: 100 MW
----
247 Jan-06/AP-1862
20-Jan-06
PTC/OA/1289D
dt20-Jan-06
PTC
GUVNL
-HPGCL
21-Jan-06 21-Jan-06 1500-2400: 50 MW WR-NR
248 Jan-06/AP-1862
21-Jan-06
XEN/S&M/RPPC/JPD/214
dt21-Jan-06
JVVNL
PSEB
-JVVNL
21-Jan-06 21-Jan-06 1800-2000: 50 MW
2000-2400: 100 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
249 Jan-06/AP-1867
21-Jan-06
XEN/RPPC/S&M/213
dt21-Jan-06
JVVNL
PSEB
-JVVNL
22-Jan-06 22-Jan-06 0000-0500: 200 MW ----
250 Jan-06/AP-1864
20-Jan-06
CC/NVVN/OA/01/862
dt20-Jan-06
NVVN
AURAIYA_L
-J & K
21-Jan-06 21-Jan-06 0600-1200: 30 MW
1700-2300: 120 MW
----
251 Jan-06/AP-1865
20-Jan-06
CC/NVVN/OA/01/863
dt20-Jan-06
NVVN
DADRI_L
-J & K
21-Jan-06 21-Jan-06 0600-1200: 70 MW
1700-2300: 70 MW
----
252 Jan-06/AP-1868
21-Jan-06
AEL/PT/Trans/2005-06/970R1
dt21-Jan-06
ADANI
WBSEB
-HPGCL
22-Jan-06 22-Jan-06 0000-1600: 20 MW
1600-1700: 0 MW
1700-2100: 50 MW
2100-2300: 25 MW
ER-NR
253 Jan-06/AP-1869
21-Jan-06
AEL/PT/Trans/2005-06/971
dt21-Jan-06
ADANI
WBSEB
-HPGCL
22-Jan-06 22-Jan-06 2100-2400: 25 MW ER-NR
254 Jan-06/AP-1872
21-Jan-06
AEL/PT/Trans/2005-06/972
dt21-Jan-06
ADANI
WBSEB
-HPGCL
22-Jan-06 22-Jan-06 0500-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
255 Jan-06/AP-1873
21-Jan-06
LEUL/OA/101
dt21-Jan-06
LEUL
CESC
-PSEB
22-Jan-06 22-Jan-06 0900-1700: 20 MW ER-WR-NR
256 Jan-06/AP-1870
21-Jan-06
CC/NVVN/OA/01/864
dt21-Jan-06
NVVN
ANTA_L
-J & K
22-Jan-06 22-Jan-06 1700-2300: 100 MW ----
257 Jan-06/AP-1871
21-Jan-06
CC/NVVN/OA/01/865
dt21-Jan-06
NVVN
AURAIYA_L
-J & K
22-Jan-06 22-Jan-06 0600-1200: 100 MW
1700-2300: 100 MW
----
258 Jan-06/AP-1874
22-Jan-06
PTC/OA/322D
dt22-Jan-06
PTC
GUVNL
-HPGCL
22-Jan-06 22-Jan-06 1500-2300: 100 MW
2300-2400: 46 MW
WR-NR
259 Jan-06/AP-1875
22-Jan-06
Xen/RPPC/S&M/215
dt22-Jan-06
JVVNL
PSEB
-JVVNL
23-Jan-06 23-Jan-06 0000-0500: 200 MW ----
260 Jan-06/AP-1876
22-Jan-06
CC/NVVN/OA/01/867
dt22-Jan-06
NVVN
ANTA_L
-J & K
23-Jan-06 23-Jan-06 1700-2300: 90 MW ----
261 Jan-06/AP-1877
22-Jan-06
CC/NVVN/OA/01/868
dt22-Jan-06
NVVN
AURAIYA_L
-J & K
23-Jan-06 23-Jan-06 0600-1200: 100 MW
1700-2300: 110 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
262 Jan-06/AP-1878
22-Jan-06
AEL/PT/YRANS/2005-06/978
dt22-Jan-06
ADANI
WBSEB
-HPGCL
23-Jan-06 23-Jan-06 0000-0500: 15 MW
0500-1100: 20 MW
1100-1600: 17 MW
1600-1700: 0 MW
1700-2100: 50 MW
2100-2300: 25 MW
ER-NR
263 Jan-06/AP-1879
22-Jan-06
AEL/PT/TRANS/2005-06/979
dt22-Jan-06
ADANI
WBSEB
-HPGCL
23-Jan-06 23-Jan-06 2100-2400: 25 MW ER-NR
264 Jan-06/AP-1880
22-Jan-06
PTC/OA/1327D
dt22-Jan-06
PTC
BSEB
-UPPCL
23-Jan-06 23-Jan-06 0000-0500: 5 MW
1100-1600: 3 MW
ER-NR
265 Jan-06/AP-1881
22-Jan-06
PTC/OA/1326D
dt22-Jan-06
PTC
GUVNL
-HPGCL
23-Jan-06 23-Jan-06 1500-2300: 50 MW
2300-2400: 45 MW
WR-NR
266 Jan-06/AP-1882
22-Jan-06
AEL/PT/TRANS/2005-06/980
dt22-Jan-06
ADANI
WBSEB
-HPGCL
23-Jan-06 23-Jan-06 0500-0600: 50 MW
0600-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
267 Jan-06/AP-1883
22-Jan-06
LEUL/OA/102
dt22-Jan-06
LEUL
CESC
-PSEB
23-Jan-06 23-Jan-06 0900-1700: 20 MW ER-WR-NR
268 Jan-06/AP-1884
23-Jan-06
XEN/RPPC/S&M/216
dt23-Jan-06
JVVNL
PSEB
-JVVNL
24-Jan-06 24-Jan-06 0000-0500: 200 MW ----
269 Jan-06/AP-1886
23-Jan-06
PTC/OA/1329D
dt23-Jan-06
PTC
BSEB
-UPPCL
24-Jan-06 24-Jan-06 0000-0500: 5 MW
1100-1600: 3 MW
ER-NR
270 Jan-06/AP-1885
23-Jan-06
AEL/PT/Trans/2005-06/986
dt23-Jan-06
ADANI
WBSEB
-HPGCL
24-Jan-06 24-Jan-06 0000-0500: 15 MW
0500-1100: 20 MW
1100-1600: 17 MW
1600-1700: 0 MW
1700-2100: 50 MW
2100-2300: 25 MW
ER-NR
271 Jan-06/AP-1887
23-Jan-06
AEL/PT/TRANS/2005-06/987
dt23-Jan-06
ADANI
WBSEB
-HPGCL
24-Jan-06 24-Jan-06 2100-2400: 25 MW ER-NR
272 Jan-06/AP-1890
23-Jan-06
AEL/PT/TRANS/2005-06/988
dt23-Jan-06
ADANI
WBSEB
-HPGCL
24-Jan-06 24-Jan-06 0500-0600: 65 MW
0600-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
273 Jan-06/AP-1891
23-Jan-06
PTC/OA/1135D
dt23-Jan-06
PTC
GUVNL
-HPGCL
24-Jan-06 24-Jan-06 0000-0500: 47 MW
0500-0600: 50 MW
WR-NR
274 Jan-06/AP-1889
23-Jan-06
CC/NVVN/OA/01/870
dt23-Jan-06
NVVN
ANTA_L
-J & K
24-Jan-06 24-Jan-06 1700-2300: 82 MW ----
275 Jan-06/AP-1888
23-Jan-06
CC/NVVN/OA/01/871
dt23-Jan-06
NVVN
AURAIYA_L
-J & K
24-Jan-06 24-Jan-06 0600-1200: 100 MW
1700-2300: 99 MW
----
276 Jan-06/AP-1892
24-Jan-06
PTC/OS/1139D
dt24-Jan-06
PTC
GUVNL
-HPGCL
24-Jan-06 24-Jan-06 1530-1600: 188 MW
1600-2300: 100 MW
2300-2400: 47 MW
WR-NR
277 Jan-06/AP-1893
24-Jan-06
XEN/S&M/RPPC/JPD/218
dt24-Jan-06
JVVNL
PSEB
-JVVNL
25-Jan-06 25-Jan-06 0000-0500: 150 MW ----
278 Jan-06/AP-1894
24-Jan-06
AEL/PT/TRANS/2005-06/994
dt24-Jan-06
ADANI
WBSEB
-HPGCL
25-Jan-06 25-Jan-06 0000-1600: 20 MW
1600-1700: 0 MW
1700-2100: 50 MW
2100-2300: 25 MW
ER-NR
279 Jan-06/AP-1895
24-Jan-06
AEL/PT/TRANS/2005/06/995
dt24-Jan-06
ADANI
WBSEB
-HPGCL
25-Jan-06 25-Jan-06 2100-2400: 25 MW ER-NR
280 Jan-06/AP-1898
24-Jan-06
AEL/PT/TRANS/2005-06/996
dt24-Jan-06
ADANI
WBSEB
-HPGCL
25-Jan-06 25-Jan-06 0500-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
281 Jan-06/AP-1899
24-Jan-06
PTC/OA/1342D
dt24-Jan-06
PTC
GUVNL
-HPGCL
25-Jan-06 25-Jan-06 1500-2200: 100 MW
2200-2300: 50 MW
2300-2400: 15 MW
WR-NR
282 Jan-06/AP-1900
24-Jan-06
PTC/OA/1145D
dt24-Jan-06
PTC
GUVNL
-PSEB
25-Jan-06 25-Jan-06 0100-0500: 12 MW
0500-0600: 50 MW
1500-2300: 100 MW
2300-2400: 30 MW
WR-NR
283 Jan-06/AP-1901
24-Jan-06
CC/NVVN/OA/01
dt24-Jan-06
NVVN
KSEB
-PSEB
25-Jan-06 25-Jan-06 0500-1700: 50 MW SR-WR-NR
284 Jan-06/AP-1902
24-Jan-06
PTC/OA/1346D
dt24-Jan-06
PTC
GUVNL
-PSEB
25-Jan-06 25-Jan-06 0000-0100: 46 MW
0100-0500: 33 MW
WR-NR
285 Jan-06/AP-1896
24-Jan-06
CC/NVVN/OA/01/873
dt24-Jan-06
NVVN
ANTA_L
-J & K
25-Jan-06 25-Jan-06 0600-1200: 20 MW
1700-2300: 69 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
286 Jan-06/AP-1897
24-Jan-06
CC/NVVN/OA/01/874
dt24-Jan-06
NVVN
AURAIYA_L
-J & K
25-Jan-06 25-Jan-06 0600-1200: 80 MW
1700-2300: 78 MW
----
287 Jan-06/AP-1936
24-Jan-06
CC/NVVN/OA/01/877
dt24-Jan-06
NVVN
KSEB
-PSEB
28-Jan-06 28-Jan-06 0500-1700: 50 MW SR-WR-NR
288 Jan-06/AP-1909
25-Jan-06
PTC/OA/1347 D
dt25-Jan-06
PTC
GUVNL
-PSEB
26-Jan-06 26-Jan-06 1500-1700: 100 MW
2000-2200: 100 MW
WR-NR
289 Jan-06/AP-1910
25-Jan-06
XEN/S&M/RPPC/JPD/219
dt25-Jan-06
JVVNL
PSEB
-JVVNL
26-Jan-06 26-Jan-06 0000-0500: 150 MW ----
290 Jan-06/AP-1911
25-Jan-06
AEL/PT/Trans/2005-06/1003
dt25-Jan-06
ADANI
WBSEB
-HPGCL
26-Jan-06 26-Jan-06 0000-1600: 20 MW
1600-1700: 0 MW
1700-2100: 50 MW
2100-2300: 33 MW
ER-NR
291 Jan-06/AP-1915
25-Jan-06
AEL/PT/TRANS/2005-06/1006
dt25-Jan-06
ADANI
WBSEB
-HPGCL
26-Jan-06 26-Jan-06 0500-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
292 Jan-06/AP-1912
25-Jan-06
AEL/PT/Trans/2005-06/1004
dt25-Jan-06
ADANI
WBSEB
-HPGCL
26-Jan-06 26-Jan-06 2100-2300: 17 MW
2300-2400: 25 MW
ER-NR
293 Jan-06/AP-1913
25-Jan-06
PTC/OA/1352D
dt25-Jan-06
PTC
GUVNL
-PSEB
26-Jan-06 26-Jan-06 1600-2300: 200 MW
2300-2400: 50 MW
WR-NR
294 Jan-06/AP-1914
25-Jan-06
PTC/OA/1355D
dt25-Jan-06
PTC
GUVNL
-PSEB
26-Jan-06 26-Jan-06 0000-0500: 50 MW
0500-0600: 100 MW
WR-NR
295 Jan-06/AP-1916
25-Jan-06
CC/NVVN/OA/01/875
dt25-Jan-06
NVVN
ANTA_L
-J & K
26-Jan-06 26-Jan-06 0600-1200: 30 MW
1700-2300: 70 MW
----
296 Jan-06/AP-1917
25-Jan-06
CC/NVVN/OA/01/880
dt25-Jan-06
NVVN
AURAIYA_L
-J & K
26-Jan-06 26-Jan-06 0600-1200: 70 MW
1700-2300: 80 MW
----
297 Jan-06/AP-1918
25-Jan-06
CC/NVVN/OA/01/883
dt25-Jan-06
NVVN
KSEB
-PSEB
27-Jan-06 27-Jan-06 0500-1600: 50 MW
1600-1700: 25 MW
SR-WR-NR
298 Jan-06/AP-1919
26-Jan-06
PTC/OA/1375D
dt26-Jan-06
PTC
GUVNL
-HPGCL
26-Jan-06 26-Jan-06 1500-1600: 135 MW
1600-1700: 0 MW
1700-1900: 100 MW
2000-2200: 100 MW
2200-2300: 50 MW
WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
299 Jan-06/AP-1920
26-Jan-06
XEN/RPPC/JPD/S&M/221
dt26-Jan-06
JVVNL
PSEB
-JVVNL
27-Jan-06 27-Jan-06 0000-0500: 150 MW ----
300 Jan-06/AP-1921
26-Jan-06
AEL/PT/TRANS/2005-06/1012
dt26-Jan-06
ADANI
WBSEB
-HPGCL
27-Jan-06 27-Jan-06 0000-1600: 20 MW
1600-1700: 0 MW
1700-2100: 50 MW
2100-2300: 33 MW
ER-NR
301 Jan-06/AP-1922
26-Jan-06
AEL/PT/TRANS/2005-06/1013
dt26-Jan-06
ADANI
WBSEB
-HPGCL
27-Jan-06 27-Jan-06 2100-2300: 17 MW
2300-2400: 25 MW
ER-NR
302 Jan-06/AP-1923
26-Jan-06
AEL/PT/TRANS/2005-06/1014
dt26-Jan-06
ADANI
WBSEB
-HPGCL
27-Jan-06 27-Jan-06 0500-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
303 Jan-06/AP-1924
26-Jan-06
PTC/OA/1362D
dt26-Jan-06
PTC
GUVNL
-PSEB
27-Jan-06 27-Jan-06 1600-2300: 100 MW
2300-2400: 50 MW
WR-NR
304 Jan-06/AP-1925
26-Jan-06
CC/NVVN/OA/01/887
dt26-Jan-06
NVVN
KSEB
-PSEB
27-Jan-06 27-Jan-06 0500-1700: 50 MW SR-WR-NR
305 Jan-06/AP-1926
26-Jan-06
CC/NVVN/OA/01/884
dt26-Jan-06
NVVN
ANTA_L
-J & K
27-Jan-06 27-Jan-06 0600-1200: 30 MW
1700-2300: 75 MW
----
306 Jan-06/AP-1927
26-Jan-06
CC/NVVN/OA/01/885
dt26-Jan-06
NVVN
AURAIYA_L
-J & K
27-Jan-06 27-Jan-06 1700-2300: 60 MW ----
307 Jan-06/AP-1928
26-Jan-06
CC/NVVN/OA/01/886
dt26-Jan-06
NVVN
DADRI_L
-J & K
27-Jan-06 27-Jan-06 0600-1200: 70 MW
1700-2300: 65 MW
----
308 Jan-06/AP-1929
27-Jan-06
XEN/RPPC/S&M/JPR/222
dt27-Jan-06
JVVNL
PSEB
-JVVNL
28-Jan-06 28-Jan-06 0000-0500: 150 MW ----
309 Jan-06/AP-1930
27-Jan-06
PTC/OA/1368D
dt27-Jan-06
PTC
GUVNL
-HPGCL
27-Jan-06 27-Jan-06 1600-1700: 38 MW
1700-2300: 100 MW
2300-2400: 0 MW
WR-NR
310 Jan-06/AP-1933
27-Jan-06
AEL/PT/Trans/2005-06/1021
dt27-Jan-06
ADANI
WBSEB
-HPGCL
28-Jan-06 28-Jan-06 0000-0500: 12 MW
0500-0600: 17 MW
0600-1100: 18 MW
1100-1600: 16 MW
1600-1700: 0 MW
1700-2100: 50 MW
2100-2300: 33 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
311 Jan-06/AP-1934
27-Jan-06
AEL/PT/Trans/2005-06/1022
dt27-Jan-06
ADANI
WBSEB
-HPGCL
28-Jan-06 28-Jan-06 2100-2300: 17 MW
2300-2400: 25 MW
ER-NR
312 Jan-06/AP-1937
27-Jan-06
AEL/PT/TRANS/2005-06/1023
dt27-Jan-06
ADANI
WBSEB
-HPGCL
28-Jan-06 28-Jan-06 0500-1600: 80 MW
1600-1700: 34 MW
ER-WR-NR
313 Jan-06/AP-1931
27-Jan-06
PTC/OA/1364D
dt27-Jan-06
PTC
GUVNL
-PSEB
27-Jan-06 27-Jan-06 1600-1700: 38 MW
1700-2300: 100 MW
WR-NR
314 Jan-06/AP-1938
27-Jan-06
PTC/OA/1369D
dt27-Jan-06
PTC
GUVNL
-PSEB
28-Jan-06 28-Jan-06 0200-0700: 50 MW
1600-1700: 171 MW
1700-1900: 200 MW
1900-2000: 100 MW
2000-2100: 200 MW
2100-2300: 150 MW
2300-2400: 50 MW
WR-NR
315 Jan-06/AP-1935
27-Jan-06
PTC/OA/1365D
dt27-Jan-06
PTC
BSEB
-UPPCL
28-Jan-06 28-Jan-06 0000-0500: 8 MW
0500-0600: 3 MW
0600-1100: 2 MW
1100-1200: 4 MW
1200-1600: 5 MW
1600-2300: 0 MW
2300-2400: 7 MW
ER-NR
316 Jan-06/AP-1939
27-Jan-06
LEUL/OA/103
dt27-Jan-06
LEUL
CESC
-PSEB
28-Jan-06 28-Jan-06 1000-1600: 15 MW ER-WR-NR
317 Jan-06/AP-1941
27-Jan-06
CC/NVVN/OA/01/890
dt27-Jan-06
NVVN
AURAIYA_L
-J & K
28-Jan-06 28-Jan-06 0600-1200: 30 MW
1700-2300: 95 MW
----
318 Jan-06/AP-1940
27-Jan-06
CC/NVVN/OA/01/891
dt27-Jan-06
NVVN
ANTA_L
-J & K
28-Jan-06 28-Jan-06 1700-2300: 40 MW ----
319 Jan-06/AP-1942
28-Jan-06
XEN/S&M/RPPC/JPD/223
dt28-Jan-06
JVVNL
PSEB
-JVVNL
29-Jan-06 29-Jan-06 0000-0500: 150 MW ----
320 Jan-06/AP-1943
28-Jan-06
CC/NVVN/OA/01/894
dt28-Jan-06
NVVN
ANTA_L
-J & K
29-Jan-06 29-Jan-06 1700-2300: 65 MW ----
321 Jan-06/AP-1944
28-Jan-06
CC/NVVN/OA/01/895
dt28-Jan-06
NVVN
AURAIYA_L
-J & K
29-Jan-06 29-Jan-06 0600-1200: 40 MW
1700-2300: 75 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
322 Jan-06/AP-1945
28-Jan-06
CC/NVVN/OA/01/896
dt28-Jan-06
NVVN
DADRI_L
-J & K
29-Jan-06 29-Jan-06 0600-1200: 60 MW
1700-2300: 60 MW
----
323 Jan-06/AP-1946
28-Jan-06
AEL/PT/TRANS/1029
dt28-Jan-06
ADANI
WBSEB
-HPGCL
29-Jan-06 29-Jan-06 0000-0500: 12 MW
0500-0600: 17 MW
0600-1000: 20 MW
1000-1100: 18 MW
1100-1500: 15 MW
1500-1700: 0 MW
1700-2100: 33 MW
2100-2300: 25 MW
ER-NR
324 Jan-06/AP-1947
28-Jan-06
AEL/PT/TRANS/2005-06
dt28-Jan-06
ADANI
WBSEB
-HPGCL
29-Jan-06 29-Jan-06 2100-2300: 13 MW
2300-2400: 25 MW
ER-NR
325 Jan-06/AP-1948
28-Jan-06
PTC/OA/1373D
dt28-Jan-06
PTC
BSEB
-UPPCL
29-Jan-06 29-Jan-06 0000-0500: 8 MW
0500-0600: 3 MW
1000-1100: 2 MW
1100-1500: 5 MW
ER-NR
326 Jan-06/AP-1949
28-Jan-06
PTC/OA/1378D
dt28-Jan-06
PTC
BSEB
-PSEB
29-Jan-06 29-Jan-06 1700-2100: 17 MW
2100-2300: 13 MW
ER-NR
327 Jan-06/AP-1952
28-Jan-06
AEL/PT/TRANS/2005-06/1031
dt28-Jan-06
ADANI
WBSEB
-HPGCL
29-Jan-06 29-Jan-06 0500-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
328 Jan-06/AP-1951
28-Jan-06
CC/NVVN/OA/01/897
dt28-Jan-06
NVVN
KSEB
-PSEB
29-Jan-06 29-Jan-06 0500-1700: 50 MW SR-WR-NR
329 Jan-06/AP-1950
28-Jan-06
LEUL/OA/104
dt28-Jan-06
LEUL
CESC
-PSEB
29-Jan-06 29-Jan-06 0900-1700: 20 MW ER-WR-NR
330 Jan-06/AP-1953
29-Jan-06
XEN/RPPC/S&M/PD/224
dt29-Jan-06
JVVNL
PSEB
-JVVNL
30-Jan-06 30-Jan-06 0000-0500: 150 MW ----
331 Jan-06/AP-1954
29-Jan-06
CC/NVVN/OA/01/900
dt29-Jan-06
NVVN
AURAIYA_L
-J & K
30-Jan-06 30-Jan-06 1700-2300: 70 MW ----
332 Jan-06/AP-1955
29-Jan-06
CC/NVVN/OA/901
dt29-Jan-06
NVVN
DADRI_L
-J & K
30-Jan-06 30-Jan-06 0600-1200: 100 MW
1700-2300: 130 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
333 Jan-06/AP-1956
29-Jan-06
AEL/PT/Trans/2005-06/1037
dt29-Jan-06
ADANI
WBSEB
-HPGCL
30-Jan-06 30-Jan-06 0000-0500: 12 MW
0500-0600: 17 MW
0600-1000: 20 MW
1000-1100: 18 MW
1100-1600: 15 MW
1600-1700: 0 MW
1700-2100: 33 MW
2100-2300: 25 MW
ER-NR
334 Jan-06/AP-1957
29-Jan-06
AEL/PT/Trans/2005-06/1038
dt29-Jan-06
ADANI
WBSEB
-HPGCL
30-Jan-06 30-Jan-06 2100-2300: 13 MW
2300-2400: 25 MW
ER-NR
335 Jan-06/AP-1958
29-Jan-06
PTC/OA/1348D
dt29-Jan-06
PTC
BSEB
-UPPCL
30-Jan-06 30-Jan-06 0000-0500: 8 MW
0500-0600: 3 MW
1000-1100: 2 MW
1100-1600: 5 MW
ER-NR
336 Jan-06/AP-1959
29-Jan-06
PTC/OA/1385D
dt29-Jan-06
PTC
BSEB
-PSEB
30-Jan-06 30-Jan-06 1700-2100: 17 MW
2100-2300: 13 MW
ER-NR
337 Jan-06/AP-1960
29-Jan-06
AEL/PT/Trans/2005-06/1039
dt29-Jan-06
ADANI
WBSEB
-HPGCL
30-Jan-06 30-Jan-06 0500-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
338 Jan-06/AP-1961
29-Jan-06
PTC/OA/1382D
dt29-Jan-06
PTC
GUVNL
-PSEB
30-Jan-06 30-Jan-06 0100-0400: 45 MW
0400-0500: 11 MW
0500-0700: 50 MW
1700-2300: 50 MW
WR-NR
339 Jan-06/AP-1962
29-Jan-06
PTC/OA/1386D
dt29-Jan-06
PTC
GUVNL
-HPGCL
30-Jan-06 30-Jan-06 0400-0500: 34 MW
0500-0700: 50 MW
2000-2200: 150 MW
2300-2400: 45 MW
WR-NR
340 Jan-06/AP-1963
29-Jan-06
CC/NVVN/OA/01/902
dt29-Jan-06
NVVN
KSEB
-PSEB
30-Jan-06 30-Jan-06 0500-1700: 50 MW SR-WR-NR
341 Jan-06/AP-1964
29-Jan-06
LEUL/OA/105
dt29-Jan-06
LEUL
CESC
-PSEB
30-Jan-06 30-Jan-06 1000-1600: 15 MW ER-WR-NR
342 Jan-06/AP-1965
29-Jan-06
CC/NVVN/OA/01/899
dt29-Jan-06
NVVN
ANTA_L
-J & K
30-Jan-06 30-Jan-06 0600-1200: 50 MW
1700-2300: 60 MW
----
343 Jan-06/AP-1966
30-Jan-06
XEN/RPPC/S&M/JPD/225
dt30-Jan-06
JVVNL
PSEB
-JVVNL
31-Jan-06 31-Jan-06 0000-0500: 150 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
344 Jan-06/AP-1967
30-Jan-06
PTC/OA/1392 D
dt30-Jan-06
PTC
BSEB
-UPPCL
31-Jan-06 31-Jan-06 0000-0500: 7 MW
0500-0600: 3 MW
1000-1100: 2 MW
1100-1600: 4 MW
ER-NR
345 Jan-06/AP-1971
30-Jan-06
PTC/OA/1394 D
dt30-Jan-06
PTC
GUVNL
-PSEB
31-Jan-06 31-Jan-06 0300-0500: 45 MW
0500-0600: 50 MW
1600-2100: 100 MW
2100-2300: 50 MW
2300-2400: 45 MW
WR-NR
346 Jan-06/AP-1968
30-Jan-06
PTC/OA/1393 D
dt30-Jan-06
PTC
BSEB
-PSEB
31-Jan-06 31-Jan-06 1700-2100: 17 MW
2100-2300: 15 MW
ER-NR
347 Jan-06/AP-1969
30-Jan-06
AEL/PT/Trans/2005-06/1044
dt30-Jan-06
ADANI
WBSEB
-HPGCL
31-Jan-06 31-Jan-06 0000-0500: 11 MW
0500-0600: 15 MW
0600-1000: 18 MW
1000-1100: 16 MW
1100-1600: 14 MW
1600-1700: 0 MW
1700-2100: 33 MW
2100-2300: 29 MW
ER-NR
348 Jan-06/AP-1970
30-Jan-06
AEL/PT/Trans/2005-06/1045
dt30-Jan-06
ADANI
WBSEB
-HPGCL
31-Jan-06 31-Jan-06 2100-2300: 15 MW
2300-2400: 25 MW
ER-NR
349 Jan-06/AP-1972
30-Jan-06
AEL/PT/Trans/2005-06/1046
dt30-Jan-06
ADANI
WBSEB
-HPGCL
31-Jan-06 31-Jan-06 0500-0600: 0 MW
0600-1600: 80 MW
1600-1700: 40 MW
ER-WR-NR
350 Jan-06/AP-1973
30-Jan-06
CC/NVVN/OA/01/907
dt30-Jan-06
NVVN
KSEB
-PSEB
31-Jan-06 31-Jan-06 0500-1700: 50 MW SR-WR-NR
351 Jan-06/AP-1974
30-Jan-06
LEUL/OA/106
dt30-Jan-06
LEUL
CESC
-PSEB
31-Jan-06 31-Jan-06 0800-1600: 15 MW ER-WR-NR
352 Jan-06/AP-1975
30-Jan-06
CC/NVVN/OA/01/904
dt30-Jan-06
NVVN
ANTA_L
-J & K
31-Jan-06 31-Jan-06 0600-1200: 40 MW
1700-2300: 70 MW
----
353 Jan-06/AP-1976
30-Jan-06
CC/NVVN/OA/01/905
dt30-Jan-06
NVVN
AURAIYA_L
-J & K
31-Jan-06 31-Jan-06 0600-1200: 60 MW
1700-2300: 80 MW
----
354 Jan-06/AP-1977
30-Jan-06
CC/NVVN/OA/01/906
dt30-Jan-06
NVVN
DADRI_L
-J & K
31-Jan-06 31-Jan-06 1700-2300: 50 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
355 Jan-06/AP-1986
27-Jan-06
CC/NVVN/OA/01/891
dt27-Jan-06
NVVN
DADRI_L
-J & K
28-Jan-06 28-Jan-06 0600-1200: 70 MW
1700-2300: 65 MW
----
356 Jan-06/AP-2064
07-Jan-06
CC/NVVN/OA/----
dt07-Jan-06
NVVN
ANTA_L
-J & K
08-Jan-06 08-Jan-06 1700-2300: 54 MW ----
357 Jan-06/AP-2065
21-Jan-06
CC/NVVN/OA/---
dt21-Jan-06
NVVN
DADRI_L
-J & K
22-Jan-06 22-Jan-06 1130-1145: 41 MW ----
358 Jan-06/AP-2070
14-Jan-06
CC/NVVN/OA/_____
dt14-Jan-06
NVVN
AURAIYA_L
-DTL
15-Jan-06 15-Jan-06 1115-1200: 26 MW ----
359 Jan-06/AP-2071
22-Jan-06
CC/NVVN/OA/_____
dt22-Jan-06
NVVN
ANTA_L
-DTL
23-Jan-06 23-Jan-06 1015-1400: 53 MW ----
360 Jan-06/AP-2072
22-Jan-06
CC/NVVN/OA/_____
dt22-Jan-06
NVVN
AURAIYA_L
-DTL
23-Jan-06 23-Jan-06 1200-1400: 68 MW ----
361 Jan-06/AP-2073
30-Jan-06
CC/NVVN/____
dt30-Jan-06
NVVN
DADRI_L
-DTL
31-Jan-06 31-Jan-06 1200-1230: 10 MW ----
362 Jan-06/AP-2074
30-Jan-06
CC/NVVN/____
dt30-Jan-06
NVVN
ANTA_L
-DTL
31-Jan-06 31-Jan-06 1200-1230: 38 MW ----
363 Jan-06/AP-2075
30-Jan-06
CC/NVVN/OA/____
dt30-Jan-06
NVVN
AURAIYA_L
-DTL
31-Jan-06 31-Jan-06 1200-1230: 49 MW ----