ST Open Access Approved Transactions for month July-06

Last updated on Thu Oct 26 19:54:08 IST 2006
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
1 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
01-Jul-06 01-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 23 MW
1400-1700: 25 MW
1700-2300: 0 MW
2300-2400: 25 MW
NER-ER-NR
2 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
02-Jul-06 02-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 22 MW
1400-1700: 24 MW
1700-2300: 0 MW
2300-2400: 25 MW
NER-ER-NR
3 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
03-Jul-06 08-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 23 MW
1400-1700: 25 MW
1700-2300: 0 MW
2300-2400: 25 MW
NER-ER-NR
4 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
09-Jul-06 09-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 22 MW
1400-1700: 24 MW
1700-2300: 0 MW
2300-2400: 25 MW
NER-ER-NR
5 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
10-Jul-06 15-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 23 MW
1400-1700: 25 MW
1700-2300: 0 MW
2300-2400: 25 MW
NER-ER-NR
6 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
16-Jul-06 16-Jul-06 0000-0200: 21 MW
0200-0700: 19 MW
0700-1400: 20 MW
1400-1700: 22 MW
1700-2300: 0 MW
2300-2400: 23 MW
NER-ER-NR
7 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
17-Jul-06 22-Jul-06 0000-0200: 21 MW
0200-0700: 19 MW
0700-0800: 20 MW
0800-1400: 21 MW
1400-1700: 23 MW
1700-2300: 0 MW
2300-2400: 23 MW
NER-ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
8 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
23-Jul-06 23-Jul-06 0000-0200: 21 MW
0200-0700: 19 MW
0700-1400: 20 MW
1400-1700: 22 MW
1700-2300: 0 MW
2300-2400: 23 MW
NER-ER-NR
9 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
24-Jul-06 29-Jul-06 0000-0200: 21 MW
0200-0700: 19 MW
0700-0800: 20 MW
0800-1400: 21 MW
1400-1700: 23 MW
1700-2300: 0 MW
2300-2400: 23 MW
NER-ER-NR
10 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
30-Jul-06 30-Jul-06 0000-0200: 21 MW
0200-0700: 19 MW
0700-1400: 20 MW
1400-1700: 22 MW
1700-2300: 0 MW
2300-2400: 23 MW
NER-ER-NR
11 Apr-06/AP-0052
25-Apr-06
CC/NVVN/OA/04/1179
dt17-Apr-06
NVVN
Tripura
-PSEB
31-Jul-06 31-Jul-06 0000-0200: 21 MW
0200-0700: 19 MW
0700-0800: 20 MW
0800-1400: 21 MW
1400-1700: 23 MW
1700-2300: 0 MW
2300-2400: 23 MW
NER-ER-NR
12 Apr-06/AP-0053
25-Apr-06
PTC/OA/1578
dt18-Apr-06
PTC
CESC
-PSEB
01-Jul-06 15-Jul-06 0000-0800: 30 MW ER-NR
13 Apr-06/AP-0053
25-Apr-06
PTC/OA/1578
dt18-Apr-06
PTC
CESC
-PSEB
16-Jul-06 31-Jul-06 0000-0800: 27 MW ER-NR
14 Apr-06/AP-0054
25-Apr-06
PTC/OA/1579
dt18-Apr-06
PTC
CESC
-PSEB
02-Jul-06 02-Jul-06 0800-1700: 11 MW ER-NR
15 Apr-06/AP-0054
25-Apr-06
PTC/OA/1579
dt18-Apr-06
PTC
CESC
-PSEB
09-Jul-06 09-Jul-06 0800-1700: 11 MW ER-NR
16 Apr-06/AP-0054
25-Apr-06
PTC/OA/1579
dt18-Apr-06
PTC
CESC
-PSEB
16-Jul-06 16-Jul-06 0800-1700: 11 MW ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
17 Apr-06/AP-0054
25-Apr-06
PTC/OA/1579
dt18-Apr-06
PTC
CESC
-PSEB
23-Jul-06 23-Jul-06 0800-1700: 11 MW ER-NR
18 Apr-06/AP-0054
25-Apr-06
PTC/OA/1579
dt18-Apr-06
PTC
CESC
-PSEB
30-Jul-06 30-Jul-06 0800-1700: 11 MW ER-NR
19 Apr-06/AP-0055
25-Apr-06
PTC/OA/1580
dt18-Apr-06
PTC
GRIDCO
-DTL
01-Jul-06 15-Jul-06 0000-0200: 75 MW
0200-0700: 58 MW
0700-1400: 65 MW
1400-1700: 85 MW
1700-1800: 93 MW
1800-2400: 150 MW
ER-NR
20 Apr-06/AP-0055
25-Apr-06
PTC/OA/1580
dt18-Apr-06
PTC
GRIDCO
-DTL
16-Jul-06 31-Jul-06 0000-0200: 70 MW
0200-0700: 54 MW
0700-0800: 60 MW
0800-1700: 72 MW
1700-1800: 83 MW
1800-2400: 150 MW
ER-NR
21 Apr-06/AP-0061
25-Apr-06
PTC/OA/1581
dt18-Apr-06
PTC
GRIDCO
-DTL
01-Jul-06 15-Jul-06 1700-1800: 93 MW
1800-2300: 150 MW
ER-NR
22 Apr-06/AP-0061
25-Apr-06
PTC/OA/1581
dt18-Apr-06
PTC
GRIDCO
-DTL
16-Jul-06 31-Jul-06 1700-1800: 83 MW
1800-2300: 150 MW
ER-NR
23 Apr-06/AP-0056
25-Apr-06
PTC/OA/1582
dt18-Apr-06
PTC
GRIDCO
-PSEB
01-Jul-06 15-Jul-06 0000-0200: 100 MW
0200-0800: 85 MW
0800-1700: 100 MW
1700-1800: 31 MW
1800-2300: 50 MW
2300-2400: 100 MW
ER-NR
24 Apr-06/AP-0056
25-Apr-06
PTC/OA/1582
dt18-Apr-06
PTC
GRIDCO
-PSEB
16-Jul-06 31-Jul-06 0000-0200: 91 MW
0200-1400: 80 MW
1400-1700: 98 MW
1700-1800: 28 MW
1800-2300: 50 MW
2300-2400: 98 MW
ER-NR
25 Apr-06/AP-0062
25-Apr-06
PTC/OA/1583
dt18-Apr-06
PTC
GRIDCO
-UT-Chd
01-Jul-06 15-Jul-06 0000-1400: 20 MW
1400-1800: 25 MW
1800-2400: 50 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
26 Apr-06/AP-0062
25-Apr-06
PTC/OA/1583
dt18-Apr-06
PTC
GRIDCO
-UT-Chd
16-Jul-06 31-Jul-06 0000-1400: 19 MW
1400-1800: 22 MW
1800-2400: 50 MW
ER-NR
27 Apr-06/AP-0063
25-Apr-06
PTC/OA/1584
dt18-Apr-06
PTC
DVC
-PSEB
01-Jul-06 15-Jul-06 0000-1700: 65 MW
1700-2300: 0 MW
2300-2400: 65 MW
ER-NR
28 Apr-06/AP-0063
25-Apr-06
PTC/OA/1584
dt18-Apr-06
PTC
DVC
-PSEB
16-Jul-06 31-Jul-06 0000-1700: 58 MW
1700-2300: 0 MW
2300-2400: 58 MW
ER-NR
29 Apr-06/AP-0064
25-Apr-06
PTC/OA/1585
dt18-Apr-06
PTC
JSWEL
-PSEB
01-Jul-06 15-Jul-06 0000-2400: 45 MW SR-WR-NR
30 Apr-06/AP-0064
25-Apr-06
PTC/OA/1585
dt18-Apr-06
PTC
JSWEL
-PSEB
16-Jul-06 31-Jul-06 0000-2400: 35 MW SR-WR-NR
31 Apr-06/AP-0073
25-Apr-06
PTC/OA/1586
dt18-Apr-06
PTC
JSWEL
-HPGCL
01-Jul-06 15-Jul-06 0000-2400: 45 MW SR-WR-NR
32 Apr-06/AP-0073
25-Apr-06
PTC/OA/1586
dt18-Apr-06
PTC
JSWEL
-HPGCL
16-Jul-06 31-Jul-06 0000-2400: 35 MW SR-WR-NR
33 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
01-Jul-06 01-Jul-06 0000-0200: 164 MW
0200-0700: 146 MW
0700-0800: 149 MW
0800-1400: 160 MW
1400-1700: 175 MW
1700-1800: 212 MW
ER-NR
34 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
02-Jul-06 02-Jul-06 0000-0200: 164 MW
0200-0700: 146 MW
0700-0800: 149 MW
0800-1400: 153 MW
1400-1700: 167 MW
1700-1800: 212 MW
ER-NR
35 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
03-Jul-06 08-Jul-06 0000-0200: 164 MW
0200-0700: 146 MW
0700-0800: 149 MW
0800-1400: 160 MW
1400-1700: 175 MW
1700-1800: 212 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
36 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
09-Jul-06 09-Jul-06 0000-0200: 164 MW
0200-0700: 146 MW
0700-0800: 149 MW
0800-1400: 153 MW
1400-1700: 167 MW
1700-1800: 212 MW
ER-NR
37 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
10-Jul-06 15-Jul-06 0000-0200: 164 MW
0200-0700: 146 MW
0700-0800: 149 MW
0800-1400: 160 MW
1400-1700: 175 MW
1700-1800: 212 MW
ER-NR
38 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
16-Jul-06 16-Jul-06 0000-0200: 149 MW
0200-0700: 136 MW
0700-0800: 139 MW
0800-1400: 140 MW
1400-1700: 153 MW
1700-1800: 189 MW
ER-NR
39 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
17-Jul-06 22-Jul-06 0000-0200: 149 MW
0200-0700: 136 MW
0700-0800: 139 MW
0800-1400: 145 MW
1400-1700: 160 MW
1700-1800: 189 MW
ER-NR
40 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
23-Jul-06 23-Jul-06 0000-0200: 149 MW
0200-0700: 136 MW
0700-0800: 139 MW
0800-1400: 140 MW
1400-1700: 153 MW
1700-1800: 189 MW
ER-NR
41 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
24-Jul-06 29-Jul-06 0000-0200: 149 MW
0200-0700: 136 MW
0700-0800: 139 MW
0800-1400: 145 MW
1400-1700: 160 MW
1700-1800: 189 MW
ER-NR
42 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
30-Jul-06 30-Jul-06 0000-0200: 149 MW
0200-0700: 136 MW
0700-0800: 139 MW
0800-1400: 140 MW
1400-1700: 153 MW
1700-1800: 189 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
43 Apr-06/AP-0065
25-Apr-06
306/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
31-Jul-06 31-Jul-06 0000-0200: 149 MW
0200-0700: 136 MW
0700-0800: 139 MW
0800-1400: 145 MW
1400-1700: 160 MW
1700-1800: 189 MW
ER-NR
44 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
01-Jul-06 01-Jul-06 0200-0700: 42 MW
0700-0800: 43 MW
0800-1400: 45 MW
ER-NR
45 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
02-Jul-06 02-Jul-06 0200-0700: 42 MW
0700-1400: 43 MW
ER-NR
46 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
03-Jul-06 08-Jul-06 0200-0700: 42 MW
0700-0800: 43 MW
0800-1400: 45 MW
ER-NR
47 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
09-Jul-06 09-Jul-06 0200-0700: 42 MW
0700-1400: 43 MW
ER-NR
48 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
10-Jul-06 15-Jul-06 0200-0700: 42 MW
0700-0800: 43 MW
0800-1400: 45 MW
ER-NR
49 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
16-Jul-06 16-Jul-06 0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 40 MW
ER-NR
50 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
17-Jul-06 22-Jul-06 0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 42 MW
ER-NR
51 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
23-Jul-06 23-Jul-06 0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 40 MW
ER-NR
52 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
24-Jul-06 29-Jul-06 0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 42 MW
ER-NR
53 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
30-Jul-06 30-Jul-06 0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 40 MW
ER-NR
54 Apr-06/AP-0066
25-Apr-06
307/WBSEB-PSEB/2006
dt18-Apr-06
TATA
WBSEB
-PSEB
31-Jul-06 31-Jul-06 0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 42 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
55 Apr-06/AP-0067
25-Apr-06
308/WBSEB-HPGCL/2006
dt18-Apr-06
TATA
WBSEB
-HPGCL
16-Jul-06 16-Jul-06 0000-0200: 43 MW
0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 40 MW
1400-1700: 43 MW
1700-1800: 54 MW
ER-NR
56 Apr-06/AP-0067
25-Apr-06
308/WBSEB-HPGCL/2006
dt18-Apr-06
TATA
WBSEB
-HPGCL
17-Jul-06 22-Jul-06 0000-0200: 43 MW
0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 42 MW
1400-1700: 45 MW
1700-1800: 54 MW
ER-NR
57 Apr-06/AP-0067
25-Apr-06
308/WBSEB-HPGCL/2006
dt18-Apr-06
TATA
WBSEB
-HPGCL
23-Jul-06 23-Jul-06 0000-0200: 43 MW
0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 40 MW
1400-1700: 43 MW
1700-1800: 54 MW
ER-NR
58 Apr-06/AP-0067
25-Apr-06
308/WBSEB-HPGCL/2006
dt18-Apr-06
TATA
WBSEB
-HPGCL
24-Jul-06 29-Jul-06 0000-0200: 43 MW
0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 42 MW
1400-1700: 45 MW
1700-1800: 54 MW
ER-NR
59 Apr-06/AP-0067
25-Apr-06
308/WBSEB-HPGCL/2006
dt18-Apr-06
TATA
WBSEB
-HPGCL
30-Jul-06 30-Jul-06 0000-0200: 43 MW
0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 40 MW
1400-1700: 43 MW
1700-1800: 54 MW
ER-NR
60 Apr-06/AP-0067
25-Apr-06
308/WBSEB-HPGCL/2006
dt18-Apr-06
TATA
WBSEB
-HPGCL
31-Jul-06 31-Jul-06 0000-0200: 43 MW
0200-0700: 38 MW
0700-0800: 39 MW
0800-1400: 42 MW
1400-1700: 45 MW
1700-1800: 54 MW
ER-NR
61 Apr-06/AP-0068
25-Apr-06
309/MPSEB-HPGCL/2006
dt18-Apr-06
TATA
MPSEB
-HPGCL
16-Jul-06 31-Jul-06 0000-1700: 84 MW
1700-2300: 150 MW
2300-2400: 84 MW
WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
62 Apr-06/AP-0069
25-Apr-06
CC/NVVN/OA/04/1181
dt18-Apr-06
NVVN
Tripura
-HPGCL
01-Jul-06 15-Jul-06 1700-1800: 15 MW
1800-2300: 25 MW
NER-ER-NR
63 Apr-06/AP-0069
25-Apr-06
CC/NVVN/OA/04/1181
dt18-Apr-06
NVVN
Tripura
-HPGCL
16-Jul-06 31-Jul-06 1700-1800: 14 MW
1800-2300: 25 MW
NER-ER-NR
64 Apr-06/AP-0057
25-Apr-06
CC/NVVN/OA/04/1187
dt19-Apr-06
NVVN
KSEB
-PSEB
01-Jul-06 15-Jul-06 0000-1700: 110 MW
1700-2300: 0 MW
2300-2400: 110 MW
SR-WR-NR
65 Apr-06/AP-0057
25-Apr-06
CC/NVVN/OA/04/1187
dt19-Apr-06
NVVN
KSEB
-PSEB
16-Jul-06 31-Jul-06 0000-1700: 85 MW
1700-2300: 0 MW
2300-2400: 85 MW
SR-WR-NR
66 Apr-06/AP-0060
25-Apr-06
CC/NVVN/OA/04/1188
dt19-Apr-06
NVVN
KSEB
-HPGCL
01-Jul-06 15-Jul-06 0000-1700: 75 MW
1700-2300: 0 MW
2300-2400: 75 MW
SR-WR-NR
67 Apr-06/AP-0060
25-Apr-06
CC/NVVN/OA/04/1188
dt19-Apr-06
NVVN
KSEB
-HPGCL
16-Jul-06 31-Jul-06 0000-1700: 55 MW
1700-2300: 0 MW
2300-2400: 55 MW
SR-WR-NR
68 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
01-Jul-06 01-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 23 MW
1400-1700: 25 MW
1700-1800: 30 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
69 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
02-Jul-06 02-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 22 MW
1400-1700: 24 MW
1700-1800: 30 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
70 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
03-Jul-06 08-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 23 MW
1400-1700: 25 MW
1700-1800: 30 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
71 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
09-Jul-06 09-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 22 MW
1400-1700: 24 MW
1700-1800: 30 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
72 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
10-Jul-06 15-Jul-06 0000-0200: 23 MW
0200-0800: 21 MW
0800-1400: 23 MW
1400-1700: 25 MW
1700-1800: 30 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
73 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
16-Jul-06 16-Jul-06 0000-0200: 22 MW
0200-0700: 19 MW
0700-1400: 20 MW
1400-1700: 22 MW
1700-1800: 27 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
74 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
17-Jul-06 22-Jul-06 0000-0200: 22 MW
0200-0700: 19 MW
0700-0800: 20 MW
0800-1400: 21 MW
1400-1700: 23 MW
1700-1800: 27 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
75 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
23-Jul-06 23-Jul-06 0000-0200: 22 MW
0200-0700: 19 MW
0700-1400: 20 MW
1400-1700: 22 MW
1700-1800: 27 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
76 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
24-Jul-06 29-Jul-06 0000-0200: 22 MW
0200-0700: 19 MW
0700-0800: 20 MW
0800-1400: 21 MW
1400-1700: 23 MW
1700-1800: 27 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
77 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
30-Jul-06 30-Jul-06 0000-0200: 22 MW
0200-0700: 19 MW
0700-1400: 20 MW
1400-1700: 22 MW
1700-1800: 27 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
78 Apr-06/AP-0070
25-Apr-06
LEUL/OA/04
dt17-Apr-06
LEUL
Sikkim
-PSEB
31-Jul-06 31-Jul-06 0000-0200: 22 MW
0200-0700: 19 MW
0700-0800: 20 MW
0800-1400: 21 MW
1400-1700: 23 MW
1700-1800: 27 MW
1800-2300: 50 MW
2300-2400: 40 MW
ER-NR
79 Apr-06/AP-0071
25-Apr-06
RETL/NRLDC/260
dt19-Apr-06
Reliance
NBFAL(AP)
-HPGCL
01-Jul-06 15-Jul-06 0000-2400: 20 MW SR-WR-NR
80 Apr-06/AP-0071
25-Apr-06
RETL/NRLDC/260
dt19-Apr-06
Reliance
NBFAL(AP)
-HPGCL
16-Jul-06 31-Jul-06 0000-2400: 16 MW SR-WR-NR
81 Apr-06/AP-0058
25-Apr-06
RETL/NRLDC/259
dt19-Apr-06
Reliance
CESC
-HPGCL
01-Jul-06 31-Jul-06 0200-0700: 12 MW ER-NR
82 Apr-06/AP-0059
25-Apr-06
PTC/OA/1588
dt19-Apr-06
PTC
KSEB
-PSEB
01-Jul-06 15-Jul-06 0000-1700: 54 MW
1700-2300: 0 MW
2300-2400: 54 MW
SR-WR-NR
83 Apr-06/AP-0059
25-Apr-06
PTC/OA/1588
dt19-Apr-06
PTC
KSEB
-PSEB
16-Jul-06 31-Jul-06 0000-1700: 40 MW
1700-2300: 0 MW
2300-2400: 40 MW
SR-WR-NR
84 May-06/AP-0205
25-May-06
CC/NVVN/OA/05/1264
dt19-May-06
NVVN
MeSEB
-PSEB
01-Jul-06 31-Jul-06 1800-2300: 25 MW NER-ER-NR
85 Jun-06/AP-0413
26-Jun-06
700007
dt09-Jun-06
ADANI
TNEB
-PSEB
01-Jul-06 15-Jul-06 1700-2300: 120 MW SR-WR-NR
86 Jun-06/AP-0413
26-Jun-06
700007
dt09-Jun-06
ADANI
TNEB
-PSEB
16-Jul-06 31-Jul-06 1700-2300: 57 MW SR-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
87 Jun-06/AP-0412
26-Jun-06
PTC/OA/1670
dt16-Jun-06
PTC
MALANA
-HPGCL
01-Jul-06 31-Jul-06 0000-2400: 81 MW ----
88 Jun-06/AP-0417
26-Jun-06
LEUL/OA/13
dt19-Jun-06
LEUL
KPCL
-PSEB
01-Jul-06 15-Jul-06 1700-2300: 60 MW SR-WR-NR
89 Jun-06/AP-0417
26-Jun-06
LEUL/OA/13
dt19-Jun-06
LEUL
KPCL
-PSEB
16-Jul-06 23-Jul-06 1700-2300: 29 MW SR-WR-NR
90 Jun-06/AP-0417
26-Jun-06
LEUL/OA/13
dt19-Jun-06
LEUL
KPCL
-PSEB
24-Jul-06 31-Jul-06 1700-2300: 28 MW SR-WR-NR
91 Jun-06/AP-0419
26-Jun-06
CC/NNVN/OA/06/1337
dt19-Jun-06
NVVN
KPCL
-HPGCL
01-Jul-06 15-Jul-06 1700-2300: 60 MW SR-WR-NR
92 Jun-06/AP-0419
26-Jun-06
CC/NNVN/OA/06/1337
dt19-Jun-06
NVVN
KPCL
-HPGCL
16-Jul-06 23-Jul-06 1700-2300: 28 MW SR-WR-NR
93 Jun-06/AP-0419
26-Jun-06
CC/NNVN/OA/06/1337
dt19-Jun-06
NVVN
KPCL
-HPGCL
24-Jul-06 31-Jul-06 1700-2300: 29 MW SR-WR-NR
94 Jun-06/AP-0480
29-Jun-06
05/2006-07
dt29-Jun-06
DTL
HPSEB
-DTL
01-Jul-06 15-Jul-06 0000-2400: 40 MW ----
95 Jun-06/AP-0492
30-Jun-06
PSEB/OA/J&K/066
dt29-Jun-06
PSEB
HPSEB
-PSEB
01-Jul-06 10-Jul-06 0000-2400: 100 MW ----
96 Jun-06/AP-0493
30-Jun-06
PSEB/OA/J&K/067
dt29-Jun-06
PSEB
J & K
-PSEB
01-Jul-06 10-Jul-06 0000-2400: 200 MW ----
97 Jun-06/AP-0494
30-Jun-06
PSEB/OA/HPSEB/069
dt30-Jun-06
PSEB
HPSEB
-PSEB
01-Jul-06 31-Jul-06 0000-2400: 50 MW ----
98 Jun-06/AP-0495
30-Jun-06
PSEB/OA/UPCL/070
dt29-Jun-06
PSEB
UPCL
-PSEB
01-Jul-06 10-Jul-06 0000-2400: 100 MW ----
99 Jun-06/AP-0496
30-Jun-06
PTC/OA/1679
dt29-Jun-06
PTC
HPSEB
-HPGCL
01-Jul-06 15-Jul-06 0000-2400: 47 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
100 Jun-06/AP-0497
30-Jun-06
PTC/OA/1680
dt29-Jun-06
PTC
HPSEB
-PSEB
01-Jul-06 15-Jul-06 0000-2400: 47 MW ----
101 Jun-06/AP-0498
30-Jun-06
PTC/OA/1681
dt29-Jun-06
PTC
HPSEB
-DTL
01-Jul-06 15-Jul-06 0000-2400: 46 MW ----
102 Jun-06/AP-0501
30-Jun-06
UPPCL/OA/NR/APST-UP
dt30-Jun-06
UPPCL
ARUNANCHAL
-UPPCL
01-Jul-06 01-Jul-06 1000-1400: 19 MW
1400-1500: 32 MW
1500-1700: 42 MW
1700-1800: 5 MW
1800-2300: 0 MW
2300-2345: 21 MW
2345-2400: 17 MW
NER-ER-NR
103 Jun-06/AP-0509
30-Jun-06
4DA/MIZORAM-PSEB/2006
dt30-Jun-06
JSWPTCL
Mizoram
-PSEB
01-Jul-06 01-Jul-06 1000-1700: 5 MW
2300-2400: 5 MW
NER-ER-NR
104 Jun-06/AP-0502
30-Jun-06
LEUL/OA/1001
dt30-Jun-06
LEUL
Sikkim
-PSEB
01-Jul-06 01-Jul-06 1000-1400: 8 MW
1400-1500: 13 MW
1500-1700: 12 MW
2300-2400: 3 MW
ER-NR
105 Jun-06/AP-0503
30-Jun-06
LEUL/OA/143
dt30-Jun-06
LEUL
KPCL
-PSEB
01-Jul-06 01-Jul-06 1000-1400: 39 MW
1400-1500: 65 MW
1500-1700: 60 MW
1700-1800: 3 MW
SR-ER-NR
106 Jun-06/AP-0504
30-Jun-06
LEUL/OA/144
dt30-Jun-06
LEUL
KPCL
-PSEB
01-Jul-06 01-Jul-06 2300-2345: 30 MW
2345-2400: 33 MW
SR-ER-NR
107 Jun-06/AP-0505
30-Jun-06
CC/NVVN/OA/06/1395
dt30-Jun-06
NVVN
ASEB
-HPGCL
01-Jul-06 01-Jul-06 1000-1400: 19 MW
1400-1500: 32 MW
1500-1700: 30 MW
1700-2300: 0 MW
2300-2345: 15 MW
2345-2400: 17 MW
NER-ER-NR
108 Jun-06/AP-0506
30-Jun-06
5DA/JSWEL-PSEB/2006
dt30-Jun-06
JSWPTCL
JSWEL
-PSEB
01-Jul-06 01-Jul-06 1000-1400: 19 MW
1400-1500: 32 MW
1500-1700: 30 MW
1700-1800: 3 MW
SR-ER-NR
109 Jun-06/AP-0499
30-Jun-06
PSEB/OA/UPCL/073
dt30-Jun-06
PSEB
UPCL
-PSEB
01-Jul-06 01-Jul-06 0000-1900: 30 MW
1900-2300: 0 MW
2300-2400: 30 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
110 Jun-06/AP-0500
30-Jun-06
PSEB/OA/RPPC/071
dt30-Jun-06
PSEB
RVPNL
-PSEB
01-Jul-06 01-Jul-06 0000-0600: 100 MW
1500-1900: 100 MW
----
111 Jun-06/AP-0507
30-Jun-06
PSEB/OA/RPPC/072
dt30-Jun-06
PSEB
RVPNL
-PSEB
02-Jul-06 07-Jul-06 0000-0600: 100 MW
1500-1900: 100 MW
----
112 Jun-06/AP-0508
30-Jun-06
CC/NVVN/0A/06/1397
dt30-Jun-06
NVVN
J & K
-HPGCL
01-Jul-06 01-Jul-06 0000-0500: 100 MW ----
113 Jul-06/AP-0510
01-Jul-06
CC/NVVN/OA/06/1399
dt01-Jul-06
NVVN
J & K
-HPGCL
02-Jul-06 02-Jul-06 0000-0500: 100 MW ----
114 Jul-06/AP-0511
01-Jul-06
SPL-1/HPGCL/
dt01-Jul-06
HPGCL
UPCL
-HPGCL
02-Jul-06 02-Jul-06 0000-0600: 50 MW
1000-1600: 50 MW
----
115 Jul-06/AP-0512
01-Jul-06
UPPCL/OA/NR/APST-UP
dt01-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
02-Jul-06 02-Jul-06 2300-2330: 61 MW
2330-2400: 50 MW
NER-ER-NR
116 Jul-06/AP-0513
01-Jul-06
LEUL/OA/1002
dt01-Jul-06
LEUL
Sikkim
-PSEB
02-Jul-06 02-Jul-06 2300-2330: 9 MW
2330-2400: 10 MW
ER-NR
117 Jul-06/AP-0514
02-Jul-06
UPPCL/OA/NR/APST-UP/01
dt02-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
03-Jul-06 03-Jul-06 0900-1000: 2 MW
1000-1400: 1 MW
1400-1700: 11 MW
1700-1715: 4 MW
1715-1800: 5 MW
1800-2300: 0 MW
2300-2400: 22 MW
NER-ER-NR
118 Jul-06/AP-0515
02-Jul-06
LEUL/OA/1003
dt02-Jul-06
LEUL
Sikkim
-PSEB
03-Jul-06 03-Jul-06 0900-1400: 1 MW
1400-1700: 6 MW
1700-1800: 1 MW
2300-2400: 4 MW
ER-NR
119 Jul-06/AP-0516
02-Jul-06
700077
dt02-Jul-06
ADANI
GUVNL
-HPGCL
03-Jul-06 03-Jul-06 0900-1000: 2 MW
1000-1100: 3 MW
1100-1400: 1 MW
1400-1700: 23 MW
1700-1715: 7 MW
1715-1800: 6 MW
1800-2300: 0 MW
2300-2400: 44 MW
WR-ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
120 Jul-06/AP-0517
02-Jul-06
No.399D/GUVNL-PSEB/2006-07
dt02-Jul-06
TATA
GUVNL
-PSEB
03-Jul-06 03-Jul-06 1100-1400: 2 MW
1400-1700: 35 MW
WR-ER-NR
121 Jul-06/AP-0518
02-Jul-06
PSEB/OA/J&K/074
dt02-Jul-06
PSEB
J & K
-PSEB
03-Jul-06 03-Jul-06 0000-0500: 100 MW ----
122 Jul-06/AP-0520
03-Jul-06
UPPCL/OA/NR/APST-UP
dt03-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
04-Jul-06 04-Jul-06 0000-2400: 50 MW NER-ER-WR-NR
123 Jul-06/AP-0521
03-Jul-06
LEUL/OA/1004
dt03-Jul-06
LEUL
Sikkim
-PSEB
04-Jul-06 04-Jul-06 2300-2400: 10 MW ER-NR
124 Jul-06/AP-0519
03-Jul-06
CC/NVVN/OA/07/1405
dt03-Jul-06
NVVN
J & K
-HPGCL
04-Jul-06 04-Jul-06 0000-0500: 100 MW ----
125 Jul-06/AP-0522
03-Jul-06
CH-25/HPGC/PP-77
dt03-Jul-06
HPGCL
UPCL
-HPGCL
04-Jul-06 04-Jul-06 0000-1900: 30 MW
1900-2300: 0 MW
2300-2400: 30 MW
----
126 Jul-06/AP-0523
03-Jul-06
UPPCL/OA/NR/APST-UP
dt04-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
05-Jul-06 05-Jul-06 2300-2400: 52 MW NER-ER-NR
127 Jul-06/AP-0524
04-Jul-06
CC/NVVN/OA/07/1406
dt04-Jul-06
NVVN
MPSEB
-DTL
04-Jul-06 04-Jul-06 1200-1800: 35 MW WR-NR
128 Jul-06/AP-0526
04-Jul-06
CC/NVVN/OA/07/1408
dt04-Jul-06
NVVN
GUVNL
-DTL
04-Jul-06 04-Jul-06 1800-2400: 85 MW WR-NR
129 Jul-06/AP-0527
04-Jul-06
400D/GUVNL-PSEB/2006-07
dt04-Jul-06
TATA
GUVNL
-PSEB
05-Jul-06 05-Jul-06 0000-2400: 21 MW WR-NR
130 Jul-06/AP-0525
04-Jul-06
PSEB/OA/J&K/075
dt04-Jul-06
PSEB
J & K
-PSEB
05-Jul-06 05-Jul-06 0000-0500: 100 MW ----
131 Jul-06/AP-0528
04-Jul-06
700080
dt04-Jul-06
ADANI
GUVNL
-HPGCL
05-Jul-06 05-Jul-06 0000-2400: 29 MW WR-NR
132 Jul-06/AP-0529
04-Jul-06
LEUL/OA/1005
dt04-Jul-06
LEUL
Sikkim
-PSEB
05-Jul-06 05-Jul-06 2300-2400: 7 MW ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
133 Jul-06/AP-0530
04-Jul-06
CC/NVVN/OA/07/1411
dt04-Jul-06
NVVN
APPCC
-PSEB
05-Jul-06 05-Jul-06 0000-1700: 29 MW
1700-2300: 0 MW
2300-2400: 29 MW
SR-WR-NR
134 Jul-06/AP-0531
04-Jul-06
CC/NVVN/OA/07/1412
dt04-Jul-06
NVVN
APPCC
-PSEB
05-Jul-06 05-Jul-06 1700-2300: 29 MW SR-WR-NR
135 Jul-06/AP-0532
04-Jul-06
PTC/OA/1682D
dt04-Jul-06
PTC
GRIDCO
-DTL
05-Jul-06 05-Jul-06 2300-2400: 11 MW ER-NR
136 Jul-06/AP-0533
04-Jul-06
CC/NVVN/OA/07/1410
dt04-Jul-06
NVVN
GUVNL
-DTL
05-Jul-06 05-Jul-06 0000-2400: 21 MW WR-NR
137 Jul-06/AP-0537
05-Jul-06
CC/NVVN/OA/07/1418
dt05-Jul-06
NVVN
APPCC
-PSEB
06-Jul-06 06-Jul-06 0000-1700: 29 MW
1700-2300: 0 MW
2300-2400: 29 MW
SR-WR-NR
138 Jul-06/AP-0538
05-Jul-06
CC/NVVN/OA/07/1419
dt05-Jul-06
NVVN
APPCC
-PSEB
06-Jul-06 06-Jul-06 1700-2300: 23 MW SR-WR-NR
139 Jul-06/AP-0539
05-Jul-06
700081
dt05-Jul-06
ADANI
GUVNL
-HPGCL
06-Jul-06 06-Jul-06 0000-1700: 29 MW
1700-1900: 31 MW
1900-2400: 29 MW
WR-NR
140 Jul-06/AP-0540
05-Jul-06
402D/GUVNL-PSEB/2006-07
dt05-Jul-06
TATA
GUVNL
-PSEB
06-Jul-06 06-Jul-06 0000-2400: 22 MW WR-NR
141 Jul-06/AP-0541
05-Jul-06
UPPCL/OA/NR/APST-UP
dt05-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
06-Jul-06 06-Jul-06 0000-0330: 15 MW
0330-1700: 11 MW
1700-1800: 12 MW
1800-1900: 16 MW
1900-2200: 18 MW
2200-2300: 16 MW
2300-2400: 11 MW
NER-ER-WR-NR
142 Jul-06/AP-0535
05-Jul-06
PSEB/OA/J&K/076
dt05-Jul-06
PSEB
J & K
-PSEB
06-Jul-06 06-Jul-06 0000-0500: 100 MW ----
143 Jul-06/AP-0543
05-Jul-06
LEUL/OA/1006
dt05-Jul-06
LEUL
Sikkim
-PSEB
06-Jul-06 06-Jul-06 2300-2400: 10 MW ER-NR
144 Jul-06/AP-0542
05-Jul-06
CC/NVVN/OA/07/1421
dt05-Jul-06
NVVN
GUVNL
-DTL
06-Jul-06 06-Jul-06 0000-2400: 14 MW WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
145 Jul-06/AP-0547
06-Jul-06
PTC/OA/1683
dt05-Jul-06
PTC
HPSEB
-PSEB
07-Jul-06 15-Jul-06 0000-2400: 60 MW ----
146 Jul-06/AP-0536
05-Jul-06
PTC/OA/1684D
dt05-Jul-06
PTC
HPSEB
-PSEB
06-Jul-06 06-Jul-06 0000-2400: 60 MW ----
147 Jul-06/AP-0544
05-Jul-06
403/GUVNL-PSEB/2006-07
dt05-Jul-06
TATA
GUVNL
-PSEB
06-Jul-06 06-Jul-06 0000-0200: 64 MW
0200-0300: 88 MW
WR-ER-NR
148 Jul-06/AP-0549
06-Jul-06
CC/NVVN/OA/07/1423
dt06-Jul-06
NVVN
APPCC
-PSEB
07-Jul-06 07-Jul-06 0000-1700: 26 MW
1700-2300: 0 MW
2300-2400: 26 MW
SR-WR-NR
149 Jul-06/AP-0550
06-Jul-06
CC/NVVN/OA/07/1424
dt06-Jul-06
NVVN
APPCC
-PSEB
07-Jul-06 07-Jul-06 1700-2300: 21 MW SR-WR-NR
150 Jul-06/AP-0551
06-Jul-06
404D/GUVNL/PSEB/2006-07
dt06-Jul-06
TATA
GUVNL
-PSEB
07-Jul-06 07-Jul-06 0000-2400: 21 MW WR-NR
151 Jul-06/AP-0546
06-Jul-06
700082
dt06-Jul-06
ADANI
GUVNL
-HPGCL
06-Jul-06 06-Jul-06 1700-2300: 120 MW WR-NR
152 Jul-06/AP-0545
06-Jul-06
PSEB/OA/J&K/077
dt06-Jul-06
PSEB
J & K
-PSEB
07-Jul-06 07-Jul-06 0000-0500: 100 MW ----
153 Jul-06/AP-0552
06-Jul-06
700083
dt06-Jul-06
ADANI
GUVNL
-HPGCL
07-Jul-06 07-Jul-06 0000-1700: 26 MW
1700-1800: 28 MW
1800-2100: 27 MW
2100-2300: 28 MW
2300-2400: 27 MW
WR-NR
154 Jul-06/AP-0553
06-Jul-06
LEUL/OA/1007
dt06-Jul-06
LEUL
Sikkim
-PSEB
07-Jul-06 07-Jul-06 0000-1700: 2 MW
1700-1800: 1 MW
ER-WR-NR
155 Jul-06/AP-0554
06-Jul-06
CC/NVVN/OA/1426
dt06-Jul-06
NVVN
GUVNL
-DTL
07-Jul-06 07-Jul-06 0000-2400: 21 MW WR-NR
156 Jul-06/AP-0555
06-Jul-06
UPPCL/OA/NR/APST-UP
dt06-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
07-Jul-06 07-Jul-06 0000-0500: 6 MW
0500-1100: 9 MW
1100-1700: 6 MW
1700-1800: 7 MW
1800-2300: 10 MW
2300-2400: 7 MW
NER-ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
157 Jul-06/AP-0548
06-Jul-06
RETL/NRLDC/DA/397
dt06-Jul-06
Reliance
GUVNL
-PSEB
06-Jul-06 06-Jul-06 1800-2300: 33 MW WR-NR
158 Jul-06/AP-0556
07-Jul-06
405D/GUVNL-PSEB/2006-07
dt06-Jul-06
TATA
GUVNL
-PSEB
07-Jul-06 07-Jul-06 0000-0100: 150 MW
0100-0200: 70 MW
WR-ER-NR
159 Jul-06/AP-0557
07-Jul-06
PSEB/OA/RPPC/081
dt07-Jul-06
PSEB
RVPNL
-PSEB
08-Jul-06 08-Jul-06 0000-0500: 150 MW
1500-1900: 200 MW
----
160 Jul-06/AP-0561
07-Jul-06
407D/GUVNL-PSEB/2006-07
dt07-Jul-06
TATA
GUVNL
-PSEB
08-Jul-06 08-Jul-06 0000-1700: 27 MW
1700-2300: 30 MW
2300-2400: 27 MW
WR-NR
161 Jul-06/AP-0559
07-Jul-06
LEUL/OA/2002
dt07-Jul-06
LEUL
GUVNL
-PSEB
07-Jul-06 07-Jul-06 1700-2300: 90 MW WR-NR
162 Jul-06/AP-0558
07-Jul-06
LEUL/OA/
dt07-Jul-06
LEUL
KPCL
-PSEB
07-Jul-06 07-Jul-06 1700-2300: 30 MW SR-WR-NR
163 Jul-06/AP-0560
07-Jul-06
CC/NVVN/OA/05/1436
dt07-Jul-06
NVVN
J & K
-HPGCL
08-Jul-06 08-Jul-06 0000-0500: 100 MW ----
164 Jul-06/AP-0562
07-Jul-06
CC/NVVN/OA/07/1433
dt07-Jul-06
NVVN
GUVNL
-DTL
08-Jul-06 08-Jul-06 0000-1700: 27 MW
1700-2300: 30 MW
2300-2400: 27 MW
WR-NR
165 Jul-06/AP-0563
07-Jul-06
LEUL/OA/1008
dt07-Jul-06
LEUL
Sikkim
-PSEB
08-Jul-06 08-Jul-06 0000-1700: 11 MW
2300-2400: 11 MW
ER-WR-NR
166 Jul-06/AP-0564
07-Jul-06
700085
dt07-Jul-06
ADANI
GUVNL
-HPGCL
08-Jul-06 08-Jul-06 0000-1700: 36 MW
1700-2300: 40 MW
2300-2400: 36 MW
WR-NR
167 Jul-06/AP-0591
10-Jul-06
PSEB/OA/upcl/078
dt07-Jul-06
PSEB
UPCL
-PSEB
11-Jul-06 20-Jul-06 0000-2400: 100 MW ----
168 Jul-06/AP-0592
10-Jul-06
PSEB/OA/HPSEB/079
dt07-Jul-06
PSEB
HPSEB
-PSEB
11-Jul-06 20-Jul-06 0000-2400: 100 MW ----
169 Jul-06/AP-0593
10-Jul-06
PSEB/OA/J&K/080
dt07-Jul-06
PSEB
J & K
-PSEB
11-Jul-06 20-Jul-06 0000-2400: 200 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
170 Jul-06/AP-0565
08-Jul-06
CC/NVVN/OA/05/1438
dt08-Jul-06
NVVN
AURAIYA_L
-DTL
08-Jul-06 08-Jul-06 1015-2400: 40 MW ----
171 Jul-06/AP-0566
08-Jul-06
PSEB/OA/RPPC/082
dt08-Jul-06
PSEB
RVPNL
-PSEB
09-Jul-06 09-Jul-06 0000-1000: 200 MW
1000-1500: 100 MW
1500-1900: 200 MW
----
172 Jul-06/AP-0567
08-Jul-06
PSEB/OA/RPPC/083
dt08-Jul-06
PSEB
RVPNL
-PSEB
09-Jul-06 09-Jul-06 1500-1900: 50 MW ----
173 Jul-06/AP-0568
08-Jul-06
PTC/OA/1686D
dt08-Jul-06
PTC
CESC
-PSEB
09-Jul-06 09-Jul-06 0930-1700: 4 MW ER-WR-NR
174 Jul-06/AP-0569
08-Jul-06
LEUL/OA/1009
dt08-Jul-06
LEUL
Sikkim
-PSEB
09-Jul-06 09-Jul-06 0000-1400: 5 MW
1400-1800: 4 MW
1800-2400: 3 MW
ER-WR-NR
175 Jul-06/AP-0570
08-Jul-06
CC/NVVN/OA/07/1439
dt08-Jul-06
NVVN
APPCC
-PSEB
09-Jul-06 09-Jul-06 0000-0930: 15 MW
0930-1700: 14 MW
1700-2300: 12 MW
2300-2400: 15 MW
SR-WR-NR
176 Jul-06/AP-0571
08-Jul-06
700086
dt08-Jul-06
ADANI
GUVNL
-HPGCL
09-Jul-06 09-Jul-06 0000-0930: 15 MW
0930-1700: 14 MW
1700-2300: 12 MW
2300-2400: 15 MW
WR-NR
177 Jul-06/AP-0572
08-Jul-06
UPPCL/OA/NR/APST-UP
dt08-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
09-Jul-06 09-Jul-06 0000-0500: 4 MW
0500-1000: 5 MW
1000-1700: 4 MW
1700-1800: 5 MW
1800-2200: 6 MW
2200-2400: 5 MW
NER-ER-WR-NR
178 Jul-06/AP-0573
08-Jul-06
409D/GUVNL-PSEB/2006-07
dt08-Jul-06
TATA
GUVNL
-PSEB
09-Jul-06 09-Jul-06 0000-0930: 15 MW
0930-1700: 14 MW
1700-2000: 15 MW
2000-2300: 16 MW
2300-2400: 15 MW
WR-NR
179 Jul-06/AP-0574
08-Jul-06
CC/NVVN/OA/07/1441
dt08-Jul-06
NVVN
GUVNL
-DTL
09-Jul-06 09-Jul-06 0000-1700: 11 MW
1700-2300: 12 MW
2300-2400: 11 MW
WR-NR
180 Jul-06/AP-0575
08-Jul-06
LEUL/OA/2003/2006-07
dt08-Jul-06
LEUL
GUVNL
-PSEB
09-Jul-06 09-Jul-06 0000-1700: 11 MW
1700-2300: 12 MW
2300-2400: 11 MW
WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
181 Jul-06/AP-0577
08-Jul-06
PTC/OA/1685D
dt08-Jul-06
PTC
GRIDCO
-DTL
09-Jul-06 09-Jul-06 0000-1700: 10 MW
1700-2300: 0 MW
2300-2400: 70 MW
ER-NR
182 Jul-06/AP-0578
09-Jul-06
CC/NVVN/OA/03/1443
dt08-Jul-06
NVVN
GUVNL
-DTL
09-Jul-06 09-Jul-06 0100-0930: 24 MW
0930-1700: 23 MW
1700-2300: 25 MW
2300-2400: 24 MW
WR-NR
183 Jul-06/AP-0579
09-Jul-06
PSEB/OA/RPPC/085
dt09-Jul-06
PSEB
RVPNL
-PSEB
10-Jul-06 10-Jul-06 1500-1900: 150 MW ----
184 Jul-06/AP-0580
09-Jul-06
PSEB/OA/RPPC/084
dt09-Jul-06
PSEB
RVPNL
-PSEB
10-Jul-06 10-Jul-06 0000-1900: 100 MW ----
185 Jul-06/AP-0581
09-Jul-06
LEUL/OA/10010
dt09-Jul-06
LEUL
Sikkim
-PSEB
10-Jul-06 10-Jul-06 0000-1700: 1 MW
1700-1800: 10 MW
1800-1900: 6 MW
1900-2000: 5 MW
2000-2100: 7 MW
2100-2400: 5 MW
ER-NR
186 Jul-06/AP-0582
09-Jul-06
LEUL/OA/2004
dt09-Jul-06
LEUL
GUVNL
-PSEB
10-Jul-06 10-Jul-06 0000-1700: 12 MW
1700-2300: 13 MW
2300-2400: 12 MW
WR-NR
187 Jul-06/AP-0583
09-Jul-06
CC/NVVN/OA/07/1444
dt09-Jul-06
NVVN
APPCC
-PSEB
10-Jul-06 10-Jul-06 0000-1700: 16 MW
1700-2300: 13 MW
2300-2400: 16 MW
SR-WR-NR
188 Jul-06/AP-0584
09-Jul-06
CC/NVVN/OA/07/1446
dt09-Jul-06
NVVN
GUVNL
-DTL
10-Jul-06 10-Jul-06 0000-1700: 12 MW
1700-2300: 13 MW
2300-2400: 12 MW
WR-NR
189 Jul-06/AP-0586
09-Jul-06
700087
dt09-Jul-06
ADANI
GUVNL
-HPGCL
10-Jul-06 10-Jul-06 0000-1700: 16 MW
1700-2300: 17 MW
2300-2400: 16 MW
WR-NR
190 Jul-06/AP-0587
09-Jul-06
411D/GUVNL-PSEB/2006-07
dt09-Jul-06
TATA
GUVNL
-PSEB
10-Jul-06 10-Jul-06 0000-1700: 12 MW
1700-2300: 13 MW
2300-2400: 12 MW
WR-NR
191 Jul-06/AP-0588
09-Jul-06
PTC/OA/1687D
dt09-Jul-06
PTC
GRIDCO
-DTL
10-Jul-06 10-Jul-06 0000-1700: 9 MW
2300-2400: 65 MW
ER-NR
192 Jul-06/AP-0589
09-Jul-06
UPPCL/OA/NR/APST-UP
dt09-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
10-Jul-06 10-Jul-06 0000-0500: 4 MW
0500-1000: 6 MW
1000-1700: 4 MW
1700-2400: 6 MW
NER-ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
193 Jul-06/AP-0590
10-Jul-06
CC/NVVN/OA/07/1448
dt09-Jul-06
NVVN
GUVNL
-DTL
11-Jul-06 11-Jul-06 0100-2400: 26 MW WR-NR
194 Jul-06/AP-0596
10-Jul-06
CC/NVVN/OA/07/1449
dt10-Jul-06
NVVN
GUVNL
-DTL
11-Jul-06 11-Jul-06 0000-1700: 12 MW
1700-2300: 13 MW
2300-2400: 12 MW
WR-NR
195 Jul-06/AP-0597
10-Jul-06
LEUL/OA/2005/2006-07
dt10-Jul-06
LEUL
GUVNL
-PSEB
11-Jul-06 11-Jul-06 0000-1700: 12 MW
1700-2300: 13 MW
2300-2400: 12 MW
WR-NR
196 Jul-06/AP-0598
10-Jul-06
CC/NVVN/OA/1451
dt10-Jul-06
NVVN
APPCC
-PSEB
11-Jul-06 11-Jul-06 0000-1700: 16 MW
1700-2300: 13 MW
2300-2400: 16 MW
SR-WR-NR
197 Jul-06/AP-0599
10-Jul-06
700088
dt10-Jul-06
ADANI
GUVNL
-HPGCL
11-Jul-06 11-Jul-06 0000-1700: 16 MW
1700-2300: 17 MW
2300-2400: 16 MW
WR-NR
198 Jul-06/AP-0601
10-Jul-06
413D/GUVNL-PSEB/2006-07
dt10-Jul-06
TATA
GUVNL
-PSEB
11-Jul-06 11-Jul-06 0000-1700: 12 MW
1700-2300: 13 MW
2300-2400: 12 MW
WR-NR
199 Jul-06/AP-0602
10-Jul-06
UPPCL/OA/NR/APST-UP
dt10-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
11-Jul-06 11-Jul-06 0000-1700: 6 MW
1700-2300: 7 MW
2300-2400: 6 MW
NER-ER-WR-NR
200 Jul-06/AP-0603
10-Jul-06
LEUL/OA/10011
dt10-Jul-06
LEUL
Sikkim
-PSEB
11-Jul-06 11-Jul-06 2300-2400: 15 MW ER-NR
201 Jul-06/AP-0594
10-Jul-06
PSEB/OA/RPPC/086
dt10-Jul-06
PSEB
RVPNL
-PSEB
11-Jul-06 11-Jul-06 0600-1900: 100 MW ----
202 Jul-06/AP-0595
10-Jul-06
PSEB/OA/RPPC/087
dt10-Jul-06
PSEB
RVPNL
-PSEB
11-Jul-06 11-Jul-06 1500-1900: 50 MW ----
203 Jul-06/AP-0604
10-Jul-06
PTC/OA/1691D
dt10-Jul-06
PTC
GRIDCO
-DTL
11-Jul-06 11-Jul-06 2300-2400: 65 MW ER-NR
204 Jul-06/AP-0605
10-Jul-06
CC/NVVN/OA/07/1453
dt10-Jul-06
NVVN
GUVNL
-DTL
11-Jul-06 11-Jul-06 0200-1700: 26 MW
1700-2300: 27 MW
2300-2400: 26 MW
WR-NR
205 Jul-06/AP-0606
11-Jul-06
PSEB/OA/RPPC/088
dt11-Jul-06
PSEB
RVPNL
-PSEB
12-Jul-06 12-Jul-06 0100-0700: 50 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
206 Jul-06/AP-0607
11-Jul-06
PSEB/OA/RPPC/089
dt11-Jul-06
PSEB
RVPNL
-PSEB
12-Jul-06 12-Jul-06 0700-1900: 100 MW ----
207 Jul-06/AP-0610
11-Jul-06
700089
dt11-Jul-06
ADANI
GUVNL
-HPGCL
12-Jul-06 12-Jul-06 0000-1700: 16 MW
1700-1900: 17 MW
1900-2200: 19 MW
2200-2300: 17 MW
2300-2400: 16 MW
WR-NR
208 Jul-06/AP-0611
11-Jul-06
UPPCL/OA/NR/APST-UP
dt11-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
12-Jul-06 12-Jul-06 0000-1730: 6 MW
1730-1900: 7 MW
1900-2200: 8 MW
2200-2230: 7 MW
2230-2400: 6 MW
NER-ER-WR-NR
209 Jul-06/AP-0612
11-Jul-06
CC/NVVN/OA/1455
dt11-Jul-06
NVVN
APPCC
-PSEB
12-Jul-06 12-Jul-06 0000-1700: 16 MW
1700-1900: 13 MW
1900-2200: 14 MW
2200-2300: 13 MW
2300-2400: 16 MW
SR-WR-NR
210 Jul-06/AP-0614
11-Jul-06
CC/NVVN/OA/1457
dt11-Jul-06
NVVN
GUVNL
-DTL
12-Jul-06 12-Jul-06 0000-1700: 12 MW
1700-1900: 13 MW
WR-NR
211 Jul-06/AP-0615
11-Jul-06
LEUL/OA/2006
dt11-Jul-06
LEUL
GUVNL
-PSEB
12-Jul-06 12-Jul-06 0000-1700: 12 MW
1700-1900: 13 MW
1900-2200: 14 MW
2200-2300: 13 MW
2300-2400: 12 MW
WR-NR
212 Jul-06/AP-0608
11-Jul-06
LEUL/OA/10012
dt11-Jul-06
LEUL
Sikkim
-PSEB
12-Jul-06 12-Jul-06 2300-2400: 3 MW ER-NR
213 Jul-06/AP-0609
11-Jul-06
PTC/OA/1692D
dt11-Jul-06
PTC
GRIDCO
-DTL
12-Jul-06 12-Jul-06 2300-2400: 67 MW ER-NR
214 Jul-06/AP-0616
11-Jul-06
416D/GUVNL-PSEB/2006-07
dt11-Jul-06
TATA
GUVNL
-PSEB
12-Jul-06 12-Jul-06 0000-1700: 12 MW
1700-1900: 13 MW
1900-2200: 0 MW
2200-2300: 13 MW
2300-2400: 12 MW
WR-NR
215 Jul-06/AP-0617
11-Jul-06
CC/NVVN/OA/07/1458
dt11-Jul-06
NVVN
GUVNL
-DTL
12-Jul-06 12-Jul-06 0200-1700: 26 MW
1700-1900: 27 MW
WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
216 Jul-06/AP-0620
12-Jul-06
CC/NVVN/OA/07/1460
dt12-Jul-06
NVVN
APPCC
-PSEB
13-Jul-06 13-Jul-06 0000-1700: 32 MW
1700-1900: 26 MW
1900-2200: 65 MW
2200-2300: 68 MW
2300-2400: 32 MW
SR-WR-NR
217 Jul-06/AP-0621
12-Jul-06
UPPCL/OA/NR/APST-UP
dt12-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
13-Jul-06 13-Jul-06 0000-0900: 13 MW
0900-1700: 11 MW
1700-1800: 12 MW
1800-1900: 14 MW
1900-2200: 35 MW
2200-2300: 32 MW
2300-2400: 11 MW
NER-ER-WR-NR
218 Jul-06/AP-0622
12-Jul-06
417D/GUVNL-PSEB/2006-07
dt12-Jul-06
TATA
GUVNL
-PSEB
13-Jul-06 13-Jul-06 0000-1700: 24 MW
1700-1900: 26 MW
1900-2300: 0 MW
2300-2400: 24 MW
WR-NR
219 Jul-06/AP-0623
12-Jul-06
LEUL/OA/2007/2006-07
dt12-Jul-06
LEUL
GUVNL
-PSEB
13-Jul-06 13-Jul-06 0000-1700: 32 MW
1700-1800: 35 MW
1800-1900: 34 MW
1900-2300: 0 MW
2300-2400: 32 MW
WR-NR
220 Jul-06/AP-0618
12-Jul-06
PSEB/OA/RPPC/90
dt12-Jul-06
PSEB
RVPNL
-PSEB
13-Jul-06 13-Jul-06 0100-0700: 50 MW ----
221 Jul-06/AP-0619
12-Jul-06
PSEB/OA/RPPC/91
dt12-Jul-06
PSEB
RVPNL
-PSEB
13-Jul-06 13-Jul-06 0700-1900: 100 MW ----
222 Jul-06/AP-0624
13-Jul-06
PTC/OA/1694D
dt13-Jul-06
PTC
GRIDCO
-DTL
13-Jul-06 13-Jul-06 1100-1700: 15 MW
2300-2400: 80 MW
ER-NR
223 Jul-06/AP-0636
14-Jul-06
PTC/OA/1696
dt13-Jul-06
PTC
HPSEB
-DTL
16-Jul-06 31-Jul-06 0000-2400: 50 MW ----
224 Jul-06/AP-0658
15-Jul-06
PTC/OA/1697
dt13-Jul-06
PTC
HPSEB
-HPGCL
16-Jul-06 31-Jul-06 0000-2400: 50 MW ----
225 Jul-06/AP-0627
13-Jul-06
PTC/OA/1698
dt13-Jul-06
PTC
HPSEB
-PSEB
16-Jul-06 31-Jul-06 0000-2400: 50 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
226 Jul-06/AP-0628
13-Jul-06
PTC/OA/1699
dt13-Jul-06
PTC
HPSEB
-PSEB
16-Jul-06 31-Jul-06 0000-2400: 60 MW ----
227 Jul-06/AP-0629
13-Jul-06
CC/NVVN/OA/07/1464
dt13-Jul-06
NVVN
APPCC
-PSEB
14-Jul-06 14-Jul-06 0000-1700: 21 MW
1700-1900: 16 MW
1900-2200: 35 MW
2200-2300: 36 MW
2300-2400: 24 MW
SR-WR-NR
228 Jul-06/AP-0630
13-Jul-06
UPPCL/OA/NR/APST-UP
dt13-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
14-Jul-06 14-Jul-06 0000-0500: 5 MW
0500-1000: 7 MW
1000-1645: 5 MW
1645-1700: 7 MW
1700-1800: 8 MW
1800-1900: 9 MW
1900-2200: 19 MW
2200-2300: 17 MW
2300-2400: 9 MW
NER-ER-WR-NR
229 Jul-06/AP-0631
13-Jul-06
700091
dt13-Jul-06
ADANI
GUVNL
-HPGCL
14-Jul-06 14-Jul-06 0000-1700: 21 MW
1700-1900: 22 MW
1900-2200: 47 MW
2200-2300: 48 MW
2300-2400: 24 MW
WR-NR
230 Jul-06/AP-0632
13-Jul-06
418D/GUVNL-PSEB/2006-07
dt13-Jul-06
TATA
GUVNL
-PSEB
14-Jul-06 14-Jul-06 0000-0500: 16 MW
0500-1000: 15 MW
1000-1645: 16 MW
1645-1700: 15 MW
1700-1900: 16 MW
1900-2300: 0 MW
2300-2400: 18 MW
WR-NR
231 Jul-06/AP-0633
13-Jul-06
PTC/OA/1700D
dt13-Jul-06
PTC
GRIDCO
-DTL
14-Jul-06 14-Jul-06 2300-2400: 70 MW ER-NR
232 Jul-06/AP-0634
13-Jul-06
CC/NVVN/OA/07/1465
dt13-Jul-06
NVVN
GUVNL
-DTL
14-Jul-06 14-Jul-06 0000-0500: 16 MW
0500-1000: 15 MW
1000-1645: 16 MW
1645-1700: 15 MW
1700-1900: 16 MW
WR-NR
233 Jul-06/AP-0635
13-Jul-06
LEUL/OA/2008/2006-07
dt13-Jul-06
LEUL
GUVNL
-PSEB
14-Jul-06 14-Jul-06 0000-1700: 21 MW
1700-1900: 22 MW
1900-2300: 0 MW
2300-2400: 24 MW
WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
234 Jul-06/AP-0625
13-Jul-06
PSEB/OA/RPPC/092
dt13-Jul-06
PSEB
RVPNL
-PSEB
14-Jul-06 14-Jul-06 0100-0700: 50 MW ----
235 Jul-06/AP-0626
13-Jul-06
PSEB/OA/RPPC/093
dt13-Jul-06
PSEB
RVPNL
-PSEB
14-Jul-06 14-Jul-06 0700-1900: 100 MW ----
236 Jul-06/AP-0637
14-Jul-06
06/2006-07
dt13-Jul-06
DTL
HPSEB
-DTL
16-Jul-06 31-Jul-06 0000-2400: 40 MW ----
237 Jul-06/AP-0640
14-Jul-06
UPPCL/OA/NR/APST-UP
dt14-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
15-Jul-06 15-Jul-06 0000-0500: 6 MW
0500-1100: 9 MW
1100-1630: 6 MW
1630-1700: 9 MW
1700-2300: 8 MW
2300-2400: 10 MW
NER-ER-WR-NR
238 Jul-06/AP-0641
14-Jul-06
700093
dt14-Jul-06
ADANI
GUVNL
-HPGCL
15-Jul-06 15-Jul-06 1700-2300: 20 MW WR-NR
239 Jul-06/AP-0642
14-Jul-06
PTC/OA/1701D
dt14-Jul-06
PTC
GRIDCO
-DTL
15-Jul-06 15-Jul-06 2300-2400: 70 MW ER-NR
240 Jul-06/AP-0643
14-Jul-06
CC/NVVN/OA/1468
dt14-Jul-06
NVVN
GUVNL
-DTL
15-Jul-06 15-Jul-06 0000-1700: 19 MW
1700-2300: 16 MW
2300-2400: 18 MW
WR-NR
241 Jul-06/AP-0644
14-Jul-06
CC/NVVN/OA/07/1467
dt14-Jul-06
NVVN
APPCC
-PSEB
15-Jul-06 15-Jul-06 0000-0500: 25 MW
0500-1100: 24 MW
1100-1630: 25 MW
1630-1700: 24 MW
1700-2300: 16 MW
2300-2400: 24 MW
SR-WR-NR
242 Jul-06/AP-0645
14-Jul-06
LEUL/OA/2009
dt14-Jul-06
LEUL
GUVNL
-PSEB
15-Jul-06 15-Jul-06 0000-0500: 25 MW
0500-1100: 24 MW
1100-1630: 25 MW
1630-1700: 24 MW
1700-2300: 20 MW
2300-2400: 24 MW
WR-NR
243 Jul-06/AP-0638
14-Jul-06
PSEB/OA/RPPC/094
dt14-Jul-06
PSEB
RVPNL
-PSEB
15-Jul-06 15-Jul-06 0100-0700: 25 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
244 Jul-06/AP-0639
14-Jul-06
PSEB/OA/RPPC/095
dt14-Jul-06
PSEB
RVPNL
-PSEB
15-Jul-06 15-Jul-06 0700-1900: 100 MW ----
245 Jul-06/AP-0646
14-Jul-06
419D/GUVNL-PSEB/2006-07
dt14-Jul-06
TATA
GUVNL
-PSEB
15-Jul-06 15-Jul-06 0000-0500: 25 MW
0500-1100: 24 MW
1100-1630: 25 MW
1630-1700: 24 MW
1700-2300: 20 MW
2300-2400: 24 MW
WR-NR
246 Jul-06/AP-0650
15-Jul-06
CC/NVVN/OA/07/1472
dt15-Jul-06
NVVN
APPCC
-PSEB
16-Jul-06 16-Jul-06 0000-0930: 20 MW
0930-1700: 19 MW
1700-1730: 16 MW
1730-2300: 15 MW
2300-2400: 20 MW
SR-WR-NR
247 Jul-06/AP-0651
15-Jul-06
700094
dt15-Jul-06
ADANI
GUVNL
-HPGCL
16-Jul-06 16-Jul-06 0000-0930: 20 MW
0930-1700: 19 MW
1700-1800: 21 MW
1800-2200: 20 MW
2200-2300: 21 MW
2300-2400: 20 MW
WR-NR
248 Jul-06/AP-0652
15-Jul-06
PTC/OA/1702D
dt15-Jul-06
PTC
CESC
-PSEB
16-Jul-06 16-Jul-06 0930-1700: 5 MW ER-WR-NR
249 Jul-06/AP-0653
15-Jul-06
420D/GUVNL-PSEB/2006-07
dt15-Jul-06
TATA
GUVNL
-PSEB
16-Jul-06 16-Jul-06 0000-0930: 20 MW
0930-1700: 19 MW
1700-1800: 21 MW
1800-2200: 20 MW
2200-2300: 21 MW
2300-2400: 20 MW
WR-NR
250 Jul-06/AP-0654
15-Jul-06
UPPCL/OA/NR/APST-UP
dt15-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
16-Jul-06 16-Jul-06 0000-0500: 5 MW
0500-1000: 7 MW
1000-1730: 5 MW
1730-1800: 7 MW
1800-2200: 8 MW
2200-2330: 7 MW
2330-2400: 5 MW
NER-ER-WR-NR
251 Jul-06/AP-0647
15-Jul-06
CC/NVVN/OA/07/1475
dt15-Jul-06
NVVN
J & K
-HPGCL
16-Jul-06 16-Jul-06 0000-0500: 100 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
252 Jul-06/AP-0648
15-Jul-06
PSEB/OA/RPPC/096
dt15-Jul-06
PSEB
RVPNL
-PSEB
16-Jul-06 16-Jul-06 0100-0700: 50 MW ----
253 Jul-06/AP-0649
15-Jul-06
PSEB/OA/RPPC/097
dt15-Jul-06
PSEB
RVPNL
-PSEB
16-Jul-06 16-Jul-06 0700-1900: 100 MW ----
254 Jul-06/AP-0655
15-Jul-06
LEUL/OA/20010
dt15-Jul-06
LEUL
GUVNL
-PSEB
16-Jul-06 16-Jul-06 0000-0930: 20 MW
0930-1700: 19 MW
1700-1800: 21 MW
1800-2200: 20 MW
2200-2300: 21 MW
2300-2400: 20 MW
WR-NR
255 Jul-06/AP-0656
15-Jul-06
CC/NVVN/OA/07/1473
dt15-Jul-06
NVVN
GUVNL
-DTL
16-Jul-06 16-Jul-06 0000-0930: 15 MW
0930-1700: 14 MW
1700-1730: 16 MW
1730-2400: 15 MW
WR-NR
256 Jul-06/AP-0657
15-Jul-06
PTC/OA/1703
dt15-Jul-06
PTC
GRIDCO
-DTL
16-Jul-06 16-Jul-06 2300-2400: 80 MW ER-NR
257 Jul-06/AP-0659
16-Jul-06
700097
dt16-Jul-06
ADANI
GUVNL
-HPGCL
16-Jul-06 16-Jul-06 0000-1800: 38 MW WR-ER-NR
258 Jul-06/AP-0660
16-Jul-06
700095
dt16-Jul-06
ADANI
GUVNL
-HPGCL
16-Jul-06 16-Jul-06 0000-1700: 110 MW
1700-2300: 150 MW
2300-2400: 110 MW
WR-NR
259 Jul-06/AP-0664
16-Jul-06
CC/NVVN/OA/07/1478
dt16-Jul-06
NVVN
APPCC
-PSEB
17-Jul-06 17-Jul-06 0000-0600: 26 MW
0600-0900: 43 MW
0900-1700: 44 MW
1700-1800: 37 MW
1800-2000: 35 MW
2000-2300: 37 MW
2300-2400: 44 MW
SR-WR-NR
260 Jul-06/AP-0665
16-Jul-06
UPPCL/OA/NR/APST-UP
dt16-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
17-Jul-06 17-Jul-06 0000-0500: 7 MW
0500-0600: 8 MW
0600-0900: 13 MW
0900-1700: 11 MW
1700-1800: 15 MW
1800-2000: 18 MW
2000-2300: 15 MW
2300-2400: 11 MW
NER-ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
261 Jul-06/AP-0661
16-Jul-06
PSEB/OA/RPPC/098
dt16-Jul-06
PSEB
RVPNL
-PSEB
17-Jul-06 17-Jul-06 0100-0700: 50 MW ----
262 Jul-06/AP-0662
16-Jul-06
PSEB/OA/RPPC/099
dt16-Jul-06
PSEB
RVPNL
-PSEB
17-Jul-06 17-Jul-06 0700-1900: 100 MW ----
263 Jul-06/AP-0663
16-Jul-06
CC/NVVN/OA/07/1481
dt16-Jul-06
NVVN
J & K
-HPGCL
17-Jul-06 17-Jul-06 0000-0500: 150 MW ----
264 Jul-06/AP-0666
16-Jul-06
421D/GUVNL-PSEB/2006-07
dt16-Jul-06
TATA
GUVNL
-PSEB
17-Jul-06 17-Jul-06 0000-0600: 13 MW WR-NR
265 Jul-06/AP-0667
16-Jul-06
LEUL/OA/20011/2006-07
dt16-Jul-06
LEUL
GUVNL
-PSEB
17-Jul-06 17-Jul-06 0000-0500: 27 MW
0500-0600: 26 MW
WR-NR
266 Jul-06/AP-0668
16-Jul-06
700098
dt16-Jul-06
ADANI
GUVNL
-HPGCL
17-Jul-06 17-Jul-06 0000-0500: 27 MW
0500-0600: 26 MW
0600-0900: 43 MW
0900-1700: 44 MW
1700-1800: 48 MW
1800-2000: 47 MW
2000-2300: 48 MW
2300-2400: 44 MW
WR-NR
267 Jul-06/AP-0669
16-Jul-06
PTC/OA/1704D
dt16-Jul-06
PTC
GRIDCO
-DTL
17-Jul-06 17-Jul-06 2300-2400: 80 MW ER-NR
268 Jul-06/AP-0671
17-Jul-06
CC/NVVN/OA/07/1485
dt17-Jul-06
NVVN
APPCC
-PSEB
18-Jul-06 18-Jul-06 0000-1700: 42 MW
1700-1800: 51 MW
1800-2100: 49 MW
2100-2200: 51 MW
2200-2300: 52 MW
2300-2400: 42 MW
SR-WR-NR
269 Jul-06/AP-0672
17-Jul-06
UPPCL/OA/NR/APST-UP
dt17-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
18-Jul-06 18-Jul-06 0000-1700: 10 MW
1700-1800: 24 MW
1800-2100: 26 MW
2100-2200: 24 MW
2200-2300: 21 MW
2300-2400: 10 MW
NER-ER-WR-NR
270 Jul-06/AP-0670
17-Jul-06
PSEB/OA/RPPC/100
dt17-Jul-06
PSEB
RVPNL
-PSEB
18-Jul-06 18-Jul-06 0100-0700: 50 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
271 Jul-06/AP-0673
17-Jul-06
PTC/OA/1706D
dt17-Jul-06
PTC
GRIDCO
-DTL
18-Jul-06 18-Jul-06 2300-2400: 80 MW ER-NR
272 Jul-06/AP-0674
17-Jul-06
CC/NVVN/OA/07/1490
dt17-Jul-06
NVVN
KPCL
-DTL
18-Jul-06 18-Jul-06 0000-1700: 31 MW
1700-1800: 51 MW
1800-2100: 49 MW
2100-2200: 51 MW
2200-2300: 52 MW
2300-2400: 31 MW
SR-WR-NR
273 Jul-06/AP-0675
17-Jul-06
PTC/OA/1707D
dt17-Jul-06
PTC
GRIDCO
-DTL
18-Jul-06 18-Jul-06 0000-1700: 42 MW
1700-2300: 0 MW
2300-2400: 42 MW
ER-WR-NR
274 Jul-06/AP-0676
18-Jul-06
CC/NVVN/OA/1494
dt18-Jul-06
NVVN
KPCL
-DTL
19-Jul-06 19-Jul-06 0000-1700: 35 MW
1700-2300: 62 MW
2300-2400: 42 MW
SR-WR-NR
275 Jul-06/AP-0677
18-Jul-06
CC/NVVN/OA/07/1493
dt18-Jul-06
NVVN
APPCC
-PSEB
19-Jul-06 19-Jul-06 0000-1700: 47 MW
1700-2300: 63 MW
2300-2400: 55 MW
SR-WR-NR
276 Jul-06/AP-0678
18-Jul-06
PTC/OA/1708D
dt18-Jul-06
PTC
GRIDCO
-DTL
19-Jul-06 19-Jul-06 0000-1700: 42 MW
1700-2300: 0 MW
2300-2400: 28 MW
ER-WR-NR
277 Jul-06/AP-0679
18-Jul-06
PTC/OA/1709D
dt18-Jul-06
PTC
GRIDCO
-DTL
19-Jul-06 19-Jul-06 2300-2400: 80 MW ER-NR
278 Jul-06/AP-0680
19-Jul-06
PSEB/OA?HPSEB/101
dt18-Jul-06
PSEB
HPSEB
-PSEB
21-Jul-06 31-Jul-06 0000-2400: 100 MW ----
279 Jul-06/AP-0682
19-Jul-06
PSEB/OA/UPCL/102
dt18-Jul-06
PSEB
UPCL
-PSEB
21-Jul-06 31-Jul-06 0000-2400: 100 MW ----
280 Jul-06/AP-0681
19-Jul-06
PSEB/OA/J&K/103
dt18-Jul-06
PSEB
J & K
-PSEB
21-Jul-06 31-Jul-06 0000-2400: 200 MW ----
281 Jul-06/AP-0683
19-Jul-06
PTC/OA/1710D
dt19-Jul-06
PTC
GRIDCO
-DTL
20-Jul-06 20-Jul-06 0000-1700: 39 MW
1700-2300: 0 MW
2300-2400: 24 MW
ER-WR-NR
282 Jul-06/AP-0684
19-Jul-06
PTC/OA/1711D
dt19-Jul-06
PTC
GRIDCO
-DTL
20-Jul-06 20-Jul-06 2300-2400: 80 MW ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
283 Jul-06/AP-0685
19-Jul-06
UPPCL/OA/NR/APST-UP
dt19-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
20-Jul-06 20-Jul-06 0000-1700: 11 MW
1700-1800: 17 MW
1800-2100: 19 MW
2100-2400: 17 MW
NER-ER-WR-NR
284 Jul-06/AP-0686
19-Jul-06
CC/NVVN/OA/07/1511
dt19-Jul-06
NVVN
APPCC
-PSEB
20-Jul-06 20-Jul-06 0000-1700: 43 MW
1700-1800: 36 MW
1800-2100: 35 MW
2100-2300: 36 MW
2300-2400: 48 MW
SR-WR-NR
285 Jul-06/AP-0687
19-Jul-06
CC/NVVN/OA/07/1512
dt19-Jul-06
NVVN
KPCL
-DTL
20-Jul-06 20-Jul-06 0000-1700: 32 MW
1700-1800: 36 MW
1800-2100: 35 MW
2100-2400: 36 MW
SR-WR-NR
286 Jul-06/AP-0688
19-Jul-06
433D/MPSEB-DTL/2006
dt19-Jul-06
TATA
MPSEB
-DTL
20-Jul-06 20-Jul-06 1700-1800: 36 MW
1800-2100: 35 MW
2100-2300: 36 MW
WR-NR
287 Jul-06/AP-0689
19-Jul-06
PSEB/OA/RPPC/104
dt19-Jul-06
PSEB
RVPNL
-PSEB
20-Jul-06 20-Jul-06 0100-0700: 50 MW
1500-1900: 100 MW
----
288 Jul-06/AP-0691
20-Jul-06
CC/NVVN/OA/07/1520
dt20-Jul-06
NVVN
KPCL
-DTL
21-Jul-06 21-Jul-06 0000-0500: 28 MW
0500-0900: 27 MW
0900-1700: 28 MW
1700-1800: 41 MW
1800-2100: 39 MW
2100-2200: 40 MW
2200-2300: 42 MW
2300-2400: 31 MW
SR-WR-NR
289 Jul-06/AP-0692
20-Jul-06
UPPCL/OA/NR/APST-UP
dt20-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
21-Jul-06 21-Jul-06 0000-0500: 9 MW
0500-0900: 13 MW
0900-1700: 9 MW
1700-1800: 16 MW
1800-2100: 21 MW
2100-2200: 19 MW
2200-2300: 14 MW
2300-2400: 10 MW
NER-ER-WR-NR
290 Jul-06/AP-0690
20-Jul-06
PSEB/OA/RPPC/105
dt20-Jul-06
PSEB
RVPNL
-PSEB
21-Jul-06 21-Jul-06 0700-1900: 100 MW ----
291 Jul-06/AP-0693
20-Jul-06
PTC/OA/1719D
dt20-Jul-06
PTC
GRIDCO
-DTL
21-Jul-06 21-Jul-06 2300-2400: 80 MW ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
292 Jul-06/AP-0694
20-Jul-06
PTC/OA/1720D
dt20-Jul-06
PTC
GRIDCO
-DTL
21-Jul-06 21-Jul-06 0000-0500: 33 MW
0500-0900: 32 MW
0900-1700: 33 MW
1700-2300: 0 MW
2300-2400: 21 MW
ER-WR-NR
293 Jul-06/AP-0695
20-Jul-06
CC/NVVN/OA/07/1519
dt20-Jul-06
NVVN
APPCC
-PSEB
21-Jul-06 21-Jul-06 0000-0500: 37 MW
0500-0900: 36 MW
0900-1700: 37 MW
1700-1800: 41 MW
1800-2100: 39 MW
2100-2200: 40 MW
2200-2400: 42 MW
SR-WR-NR
294 Jul-06/AP-0696
20-Jul-06
CC/NVVN/OA/07/1521
dt20-Jul-06
NVVN
GRIDCO
-DTL
21-Jul-06 21-Jul-06 0000-1700: 18 MW
1700-1800: 27 MW
1800-2100: 26 MW
2100-2200: 27 MW
2200-2300: 28 MW
2300-2400: 21 MW
ER-WR-NR
295 Jul-06/AP-0699
21-Jul-06
CC/NVVN/OA/07/1525
dt21-Jul-06
NVVN
APPCC
-PSEB
22-Jul-06 22-Jul-06 0000-0600: 23 MW
0600-1700: 29 MW
1700-2300: 25 MW
2300-2400: 33 MW
SR-WR-NR
296 Jul-06/AP-0700
21-Jul-06
435D/MPSEB-DTL/2006
dt21-Jul-06
TATA
MPSEB
-DTL
22-Jul-06 22-Jul-06 1700-2300: 25 MW WR-NR
297 Jul-06/AP-0697
21-Jul-06
PSEB/OA/RPPC/106
dt21-Jul-06
PSEB
RVPNL
-PSEB
22-Jul-06 22-Jul-06 0700-1900: 100 MW ----
298 Jul-06/AP-0701
21-Jul-06
UPPCL/OA/NR/APST-UP
dt21-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
22-Jul-06 22-Jul-06 0000-0600: 6 MW
0600-0800: 8 MW
0800-1700: 9 MW
1700-2400: 10 MW
NER-ER-WR-NR
299 Jul-06/AP-0702
21-Jul-06
PTC/OA/1722D
dt21-Jul-06
PTC
GRIDCO
-DTL
22-Jul-06 22-Jul-06 2300-2400: 53 MW ER-NR
300 Jul-06/AP-0703
21-Jul-06
PTC/OA/1723D
dt21-Jul-06
PTC
GRIDCO
-DTL
22-Jul-06 22-Jul-06 0000-0600: 20 MW
0600-1700: 26 MW
1700-2300: 0 MW
2300-2400: 16 MW
ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
301 Jul-06/AP-0698
21-Jul-06
PTC/OA/1742D
dt21-Jul-06
PTC
HPSEB
-PSEB
22-Jul-06 22-Jul-06 0000-2000: 100 MW
2000-2300: 50 MW
2300-2400: 100 MW
----
302 Jul-06/AP-0704
21-Jul-06
CC/NVVN/OA/07/1524
dt21-Jul-06
NVVN
KPCL
-DTL
22-Jul-06 22-Jul-06 0000-0600: 17 MW
0600-1700: 22 MW
1700-2400: 25 MW
SR-WR-NR
303 Jul-06/AP-0705
21-Jul-06
CC/NVVN/OA/07/1526
dt21-Jul-06
NVVN
ASEB
-HPGCL
22-Jul-06 22-Jul-06 2300-2400: 27 MW NER-ER-NR
304 Jul-06/AP-0706
21-Jul-06
CC/NVVN/OA/07/1522
dt21-Jul-06
NVVN
GRIDCO
-DTL
22-Jul-06 22-Jul-06 0000-0600: 11 MW
0600-0800: 15 MW
0800-1700: 14 MW
1700-2400: 16 MW
ER-WR-NR
305 Jul-06/AP-0707
21-Jul-06
700109
dt21-Jul-06
ADANI
GUVNL
-HPGCL
22-Jul-06 22-Jul-06 0000-0600: 23 MW WR-NR
306 Jul-06/AP-0708
22-Jul-06
PSEB/OA/RPPC/107
dt22-Jul-06
PSEB
RVPNL
-PSEB
23-Jul-06 23-Jul-06 0700-1900: 100 MW ----
307 Jul-06/AP-0710
22-Jul-06
PTC/OA/1725D
dt22-Jul-06
PTC
GRIDCO
-DTL
23-Jul-06 23-Jul-06 0000-0930: 18 MW
0930-1700: 17 MW
1700-2300: 0 MW
2300-2400: 11 MW
ER-WR-NR
308 Jul-06/AP-0711
22-Jul-06
PTC/OA/1726D
dt22-Jul-06
PTC
GRIDCO
-DTL
23-Jul-06 23-Jul-06 2300-2400: 80 MW ER-NR
309 Jul-06/AP-0712
22-Jul-06
PTC/OA/1728D
dt22-Jul-06
PTC
GUVNL
-DTL
23-Jul-06 23-Jul-06 0000-1700: 15 MW
1700-2300: 19 MW
2300-2400: 16 MW
WR-NR
310 Jul-06/AP-0709
22-Jul-06
PTC/OA/1727D
dt22-Jul-06
PTC
HPSEB
-PSEB
23-Jul-06 23-Jul-06 0000-0600: 100 MW
0600-2300: 50 MW
2300-2400: 100 MW
----
311 Jul-06/AP-0713
22-Jul-06
CC/NVVN/OA/07/1529
dt22-Jul-06
NVVN
GRIDCO
-DTL
23-Jul-06 23-Jul-06 0000-1700: 10 MW
1700-2300: 13 MW
2300-2400: 11 MW
ER-WR-NR
312 Jul-06/AP-0714
22-Jul-06
CC/NVVN/OA/1531
dt22-Jul-06
NVVN
KPCL
-DTL
23-Jul-06 23-Jul-06 0000-1700: 15 MW
1700-2300: 19 MW
2300-2400: 16 MW
SR-WR-NR
313 Jul-06/AP-0715
22-Jul-06
UPPCL/OA/NR/APST-UP
dt22-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
23-Jul-06 23-Jul-06 0000-1700: 6 MW
1700-2300: 8 MW
2300-2400: 6 MW
NER-ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
314 Jul-06/AP-0716
22-Jul-06
CC/NVVN/OA/07/1532
dt22-Jul-06
NVVN
APPCC
-PSEB
23-Jul-06 23-Jul-06 0000-0930: 20 MW
0930-2300: 19 MW
2300-2400: 22 MW
SR-WR-NR
315 Jul-06/AP-0717
22-Jul-06
700113
dt22-Jul-06
ADANI
GUVNL
-HPGCL
23-Jul-06 23-Jul-06 0000-0930: 20 MW
0930-1700: 19 MW
1700-2300: 25 MW
2300-2400: 22 MW
WR-NR
316 Jul-06/AP-0718
22-Jul-06
CC/NVVN/OA/07/1533
dt22-Jul-06
NVVN
GUVNL
-DTL
23-Jul-06 23-Jul-06 0000-1700: 15 MW
1700-2300: 19 MW
2300-2400: 16 MW
WR-NR
317 Jul-06/AP-0719
22-Jul-06
RETL/NRLDC/DA/404
dt22-Jul-06
Reliance
CESC
-PSEB
23-Jul-06 23-Jul-06 0930-1700: 5 MW ER-WR-NR
318 Jul-06/AP-0720
23-Jul-06
PSEB/OA/RPPC/108
dt23-Jul-06
PSEB
RVPNL
-PSEB
24-Jul-06 24-Jul-06 0100-0700: 50 MW
1600-1900: 100 MW
----
319 Jul-06/AP-0722
23-Jul-06
CC/NVVN/OA/07/1538
dt23-Jul-06
NVVN
KPCL
-DTL
24-Jul-06 24-Jul-06 0000-1700: 11 MW
1700-1800: 37 MW
1800-1900: 36 MW
1900-2100: 40 MW
2100-2200: 42 MW
2200-2300: 38 MW
2300-2400: 12 MW
SR-WR-NR
320 Jul-06/AP-0723
23-Jul-06
CC/NVVN/OA/07/1539
dt23-Jul-06
NVVN
APPCC
-PSEB
24-Jul-06 24-Jul-06 0000-1700: 15 MW
1700-1800: 37 MW
1800-1900: 36 MW
1900-2100: 40 MW
2100-2200: 42 MW
2200-2300: 38 MW
2300-2400: 15 MW
SR-WR-NR
321 Jul-06/AP-0724
23-Jul-06
UPPCL/OA/NR/APST-UP
dt23-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
24-Jul-06 24-Jul-06 0000-0600: 4 MW
0600-1000: 5 MW
1000-1700: 4 MW
1700-1800: 15 MW
1800-1900: 17 MW
1900-2100: 19 MW
2100-2200: 14 MW
2200-2300: 13 MW
2300-2400: 4 MW
NER-ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
322 Jul-06/AP-0725
23-Jul-06
442D/GUVNL-PSEB/2006-07
dt23-Jul-06
TATA
GUVNL
-PSEB
24-Jul-06 24-Jul-06 0000-1700: 11 MW
1700-2300: 0 MW
2300-2400: 12 MW
WR-NR
323 Jul-06/AP-0726
23-Jul-06
443D/GUVNL-DTL/2006-07
dt23-Jul-06
TATA
GUVNL
-DTL
24-Jul-06 24-Jul-06 0000-1700: 11 MW
1700-2300: 0 MW
2300-2400: 12 MW
WR-NR
324 Jul-06/AP-0727
23-Jul-06
PTC/OA/1729D
dt23-Jul-06
PTC
GRIDCO
-DTL
24-Jul-06 24-Jul-06 0000-1700: 13 MW
1700-2300: 0 MW
2300-2400: 8 MW
ER-WR-NR
325 Jul-06/AP-0728
23-Jul-06
PTC/OA/1730D
dt23-Jul-06
PTC
GRIDCO
-DTL
24-Jul-06 24-Jul-06 2300-2400: 80 MW ER-NR
326 Jul-06/AP-0721
23-Jul-06
PTC/OA/1731D
dt23-Jul-06
PTC
HPSEB
-PSEB
24-Jul-06 24-Jul-06 0000-0600: 100 MW
0600-2300: 50 MW
2300-2400: 100 MW
----
327 Jul-06/AP-0729
23-Jul-06
PTC/OA/1732D
dt23-Jul-06
PTC
GUVNL
-DTL
24-Jul-06 24-Jul-06 0000-1700: 11 MW
1700-2300: 0 MW
2300-2400: 12 MW
WR-NR
328 Jul-06/AP-0730
23-Jul-06
CC/NVVN/OA/07/1536
dt23-Jul-06
NVVN
GRIDCO
-DTL
24-Jul-06 24-Jul-06 0000-1700: 7 MW
1700-1800: 25 MW
1800-1900: 24 MW
1900-2100: 27 MW
2100-2200: 28 MW
2200-2300: 25 MW
2300-2400: 8 MW
ER-WR-NR
329 Jul-06/AP-0731
23-Jul-06
CC/NVVN/OA/07/1540
dt23-Jul-06
NVVN
GUVNL
-DTL
24-Jul-06 24-Jul-06 0000-1700: 11 MW
1700-2300: 0 MW
2300-2400: 12 MW
WR-NR
330 Jul-06/AP-0732
23-Jul-06
700114
dt23-Jul-06
ADANI
GUVNL
-HPGCL
24-Jul-06 24-Jul-06 0000-1700: 15 MW
1700-1900: 12 MW
1900-2200: 0 MW
2200-2300: 13 MW
2300-2400: 15 MW
WR-NR
331 Jul-06/AP-0733
23-Jul-06
LEUL/OA/20014
dt23-Jul-06
LEUL
GUVNL
-PSEB
24-Jul-06 24-Jul-06 0000-1700: 15 MW
2300-2400: 15 MW
WR-NR
332 Jul-06/AP-0737
24-Jul-06
PTC/OA/1733D
dt24-Jul-06
PTC
GRIDCO
-DTL
25-Jul-06 25-Jul-06 2300-2400: 53 MW ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
333 Jul-06/AP-0734
24-Jul-06
PTC/OA/1734D
dt24-Jul-06
PTC
GRIDCO
-DTL
25-Jul-06 25-Jul-06 0000-1200: 15 MW ER-WR-NR
334 Jul-06/AP-0735
24-Jul-06
CC/NVVN/OA/07/1543
dt24-Jul-06
NVVN
GRIDCO
-DTL
25-Jul-06 25-Jul-06 0000-1200: 8 MW ER-WR-NR
335 Jul-06/AP-0738
24-Jul-06
CC/NVVN/OA/07/1544
dt24-Jul-06
NVVN
KPCL
-DTL
25-Jul-06 25-Jul-06 0000-1200: 12 MW
1200-1700: 15 MW
1700-2300: 14 MW
2300-2400: 15 MW
SR-WR-NR
336 Jul-06/AP-0739
24-Jul-06
CC/NVVN/OA/07/1545
dt24-Jul-06
NVVN
APPCC
-PSEB
25-Jul-06 25-Jul-06 0000-1200: 16 MW
1200-1700: 21 MW
1700-2300: 14 MW
2300-2400: 21 MW
SR-WR-NR
337 Jul-06/AP-0740
24-Jul-06
LEUL/OA/20016
dt24-Jul-06
LEUL
GUVNL
-PSEB
25-Jul-06 25-Jul-06 0000-1200: 16 MW
1200-1700: 21 MW
1700-2300: 19 MW
2300-2400: 21 MW
WR-NR
338 Jul-06/AP-0741
24-Jul-06
700117
dt24-Jul-06
ADANI
GUVNL
-HPGCL
25-Jul-06 25-Jul-06 0000-1200: 16 MW
1200-1700: 21 MW
1700-2300: 19 MW
2300-2400: 21 MW
WR-NR
339 Jul-06/AP-0736
24-Jul-06
UPPCL/OA/NR/APST-UP
dt24-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
25-Jul-06 25-Jul-06 0000-0500: 4 MW
0500-0945: 6 MW
0945-1045: 5 MW
1045-1200: 4 MW
NER-ER-WR-NR
340 Jul-06/AP-0742
24-Jul-06
444D/GUVNL-PSEB/2006-07
dt24-Jul-06
TATA
GUVNL
-PSEB
25-Jul-06 25-Jul-06 0000-1200: 12 MW
1200-1700: 15 MW
1700-2300: 14 MW
2300-2400: 15 MW
WR-NR
341 Jul-06/AP-0743
24-Jul-06
445D/GUVNL-DTL/2006-07
dt24-Jul-06
TATA
GUVNL
-DTL
25-Jul-06 25-Jul-06 1700-2300: 14 MW WR-NR
342 Jul-06/AP-0744
24-Jul-06
CC/NVVN/OA/06/1548
dt24-Jul-06
NVVN
ASEB
-HPGCL
25-Jul-06 25-Jul-06 2300-2400: 27 MW NER-ER-NR
343 Jul-06/AP-0745
24-Jul-06
CC/NVVN/OA/07/1546
dt24-Jul-06
NVVN
GUVNL
-DTL
25-Jul-06 25-Jul-06 0000-1200: 12 MW
1200-1700: 15 MW
1700-2300: 14 MW
2300-2400: 15 MW
WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
344 Jul-06/AP-0746
24-Jul-06
PTC/OA/1735D
dt24-Jul-06
PTC
HPSEB
-PSEB
25-Jul-06 25-Jul-06 0000-0600: 50 MW ----
345 Jul-06/AP-0747
24-Jul-06
PTC/OA/1736D
dt24-Jul-06
PTC
GUVNL
-DTL
25-Jul-06 25-Jul-06 0000-1200: 12 MW
1200-1700: 15 MW
1700-2300: 14 MW
2300-2400: 15 MW
WR-NR
346 Jul-06/AP-0748
24-Jul-06
PSEB/OA/RPPC/109
dt24-Jul-06
PSEB
RVPNL
-PSEB
25-Jul-06 25-Jul-06 0100-0700: 50 MW
1600-1900: 100 MW
----
347 Jul-06/AP-0749
25-Jul-06
CC/NVVN/OA/03/1548
dt25-Jul-06
NVVN
AURAIYA_L
-DTL
25-Jul-06 25-Jul-06 0000-2400: 26 MW ----
348 Jul-06/AP-0750
25-Jul-06
PSEB/OA/RPPC/110
dt25-Jul-06
PSEB
RVPNL
-PSEB
26-Jul-06 26-Jul-06 0000-0600: 50 MW
1600-1900: 100 MW
----
349 Jul-06/AP-0781
25-Jul-06
PTC/OA/1737D
dt25-Jul-06
PTC
GRIDCO
-DTL
26-Jul-06 26-Jul-06 2300-2400: 80 MW ER-NR
350 Jul-06/AP-0782
25-Jul-06
PTC/OA/1738D
dt25-Jul-06
PTC
GUVNL
-DTL
26-Jul-06 26-Jul-06 0000-1700: 54 MW
1700-2300: 0 MW
2300-2400: 54 MW
WR-NR
351 Jul-06/AP-0783
25-Jul-06
CC/NVVN/OA/07/1553
dt25-Jul-06
NVVN
GUVNL
-DTL
26-Jul-06 26-Jul-06 0000-1700: 71 MW
1700-2300: 0 MW
2300-2400: 71 MW
WR-NR
352 Jul-06/AP-0784
25-Jul-06
447D/MPSEB-DTL/2006-07
dt25-Jul-06
TATA
MPSEB
-DTL
26-Jul-06 26-Jul-06 1700-2300: 125 MW WR-NR
353 Jul-06/AP-0785
26-Jul-06
PSEB/OA/RPPC/111
dt26-Jul-06
PSEB
RVPNL
-PSEB
27-Jul-06 27-Jul-06 0700-1900: 50 MW ----
354 Jul-06/AP-0786
26-Jul-06
PTC/OA/1739D
dt26-Jul-06
PTC
GRIDCO
-DTL
27-Jul-06 27-Jul-06 2300-2400: 80 MW ER-NR
355 Jul-06/AP-0790
26-Jul-06
PTC/OA/1740D
dt26-Jul-06
PTC
GUVNL
-DTL
27-Jul-06 27-Jul-06 0000-0500: 22 MW
0500-0600: 34 MW
WR-NR
356 Jul-06/AP-0787
26-Jul-06
CC/NVVN/OA/07/1557
dt26-Jul-06
NVVN
APPCC
-PSEB
27-Jul-06 27-Jul-06 0000-0500: 14 MW
1700-2300: 15 MW
SR-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
357 Jul-06/AP-0788
26-Jul-06
CC/NVVN/OA/07/1558
dt26-Jul-06
NVVN
KPCL
-DTL
27-Jul-06 27-Jul-06 0000-0500: 22 MW
1700-2300: 44 MW
SR-WR-NR
358 Jul-06/AP-0791
26-Jul-06
CC/NVVN/OA/07/1560
dt26-Jul-06
NVVN
GUVNL
-DTL
27-Jul-06 27-Jul-06 0000-0500: 29 MW
0500-0600: 45 MW
WR-NR
359 Jul-06/AP-0792
26-Jul-06
LEUL/OA/20018
dt26-Jul-06
LEUL
GUVNL
-PSEB
27-Jul-06 27-Jul-06 0000-0500: 29 MW
0500-0600: 45 MW
WR-NR
360 Jul-06/AP-0789
26-Jul-06
UPPCL/OA/NR/APST-UP
dt26-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
27-Jul-06 27-Jul-06 0000-0500: 10 MW
1700-2300: 23 MW
NER-ER-SR-WR-NR
361 Jul-06/AP-0793
26-Jul-06
449D/MPSEB-DTL/2006-07
dt26-Jul-06
TATA
MPSEB
-DTL
27-Jul-06 27-Jul-06 1700-2300: 43 MW WR-NR
362 Jul-06/AP-0794
26-Jul-06
08/2006
dt26-Jul-06
DTL
HPGCL
-DTL
27-Jul-06 27-Jul-06 1000-1900: 100 MW ----
363 Jul-06/AP-0795
27-Jul-06
LEUL/OA/20019/2006-07
dt27-Jul-06
LEUL
GUVNL
-PSEB
27-Jul-06 27-Jul-06 1315-1700: 50 MW WR-NR
364 Jul-06/AP-0796
27-Jul-06
PTC/OA/1741D
dt27-Jul-06
PTC
GUVNL
-DTL
27-Jul-06 27-Jul-06 1345-1700: 50 MW
1700-2300: 0 MW
2300-2400: 50 MW
WR-NR
365 Jul-06/AP-0797
27-Jul-06
PTC/OA/1742D
dt27-Jul-06
PTC
GRIDCO
-DTL
28-Jul-06 28-Jul-06 2300-2400: 80 MW ER-NR
366 Jul-06/AP-0800
27-Jul-06
PTC/OA/1743D
dt27-Jul-06
PTC
GUVNL
-DTL
28-Jul-06 28-Jul-06 1000-1700: 17 MW
1700-2300: 16 MW
2300-2400: 17 MW
WR-NR
367 Jul-06/AP-0801
27-Jul-06
CC/NVVN/OA/07/1564
dt27-Jul-06
NVVN
APPCC
-PSEB
28-Jul-06 28-Jul-06 0000-1000: 25 MW
1000-1700: 11 MW
1700-2300: 5 MW
2300-2400: 11 MW
SR-WR-NR
368 Jul-06/AP-0802
27-Jul-06
CC/NVVN/OA/07/1567
dt27-Jul-06
NVVN
GUVNL
-DTL
28-Jul-06 28-Jul-06 1000-1700: 23 MW
1700-2300: 21 MW
2300-2400: 23 MW
WR-NR
369 Jul-06/AP-0803
27-Jul-06
LEUL/OA/20020
dt27-Jul-06
LEUL
GUVNL
-PSEB
28-Jul-06 28-Jul-06 0000-1000: 100 MW
1000-1700: 45 MW
1700-2300: 42 MW
2300-2400: 45 MW
WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
370 Jul-06/AP-0804
27-Jul-06
CC/NVVN/OA/1365
dt27-Jul-06
NVVN
KPCL
-DTL
28-Jul-06 28-Jul-06 1000-1700: 17 MW
1700-2300: 16 MW
2300-2400: 17 MW
SR-WR-NR
371 Jul-06/AP-0805
27-Jul-06
450D/GUVNL-DTL/2006-07
dt27-Jul-06
TATA
GUVNL
-DTL
28-Jul-06 28-Jul-06 1000-1700: 11 MW
1700-2300: 10 MW
2300-2400: 11 MW
WR-NR
372 Jul-06/AP-0806
27-Jul-06
451D/MPSEB-DTL/2006-07
dt27-Jul-06
TATA
MPSEB
-DTL
28-Jul-06 28-Jul-06 1700-2300: 16 MW WR-NR
373 Jul-06/AP-0798
27-Jul-06
PSEB/RPPC/112
dt27-Jul-06
PSEB
RVPNL
-PSEB
28-Jul-06 28-Jul-06 0700-1900: 50 MW ----
374 Jul-06/AP-0799
27-Jul-06
10/2006
dt27-Jul-06
DTL
HPGCL
-DTL
28-Jul-06 28-Jul-06 1000-1900: 150 MW ----
375 Jul-06/AP-0807
28-Jul-06
452D/MPSEB-DTL/2006-07
dt28-Jul-06
TATA
MPSEB
-DTL
28-Jul-06 28-Jul-06 1730-2300: 150 MW WR-NR
376 Jul-06/AP-0808
28-Jul-06
PSEB/OA/RPPC/113
dt28-Jul-06
PSEB
RVPNL
-PSEB
29-Jul-06 29-Jul-06 0900-1900: 100 MW ----
377 Jul-06/AP-0810
28-Jul-06
PTC/OA/1744D
dt28-Jul-06
PTC
GRIDCO
-DTL
29-Jul-06 29-Jul-06 2300-2400: 62 MW ER-NR
378 Jul-06/AP-0811
28-Jul-06
PTC/OA/1745D
dt28-Jul-06
PTC
GUVNL
-DTL
29-Jul-06 29-Jul-06 0000-0800: 14 MW
0800-2400: 15 MW
WR-NR
379 Jul-06/AP-0812
28-Jul-06
CC/NVVN/OA/07/1570
dt28-Jul-06
NVVN
APPCC
-PSEB
29-Jul-06 29-Jul-06 0000-0600: 10 MW
0600-0800: 9 MW
0800-1700: 10 MW
1700-2300: 5 MW
2300-2400: 10 MW
SR-WR-NR
380 Jul-06/AP-0813
28-Jul-06
CC/NVVN/OA/07/1572
dt28-Jul-06
NVVN
KPCL
-DTL
29-Jul-06 29-Jul-06 0000-0800: 14 MW
0800-2400: 15 MW
SR-WR-NR
381 Jul-06/AP-0814
28-Jul-06
CC/NVVN/OA/07/1573
dt28-Jul-06
NVVN
GUVNL
-DTL
29-Jul-06 29-Jul-06 0000-0800: 19 MW
0800-2400: 20 MW
WR-NR
382 Jul-06/AP-0815
28-Jul-06
CC/NVVN/OA/07/1575
dt28-Jul-06
NVVN
KAWAS
-DTL
29-Jul-06 29-Jul-06 0000-0600: 29 MW
0600-0800: 28 MW
0800-1700: 30 MW
1700-2100: 29 MW
2100-2400: 30 MW
WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
383 Jul-06/AP-0816
28-Jul-06
UPPCL/OA/NR/APST-UP
dt28-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
29-Jul-06 29-Jul-06 0000-0600: 5 MW
0600-0800: 7 MW
0800-1700: 1 MW
1700-2100: 8 MW
2100-2200: 7 MW
2200-2300: 6 MW
NER-ER-SR-WR-NR
384 Jul-06/AP-0817
28-Jul-06
UPPCL/OA/NR/APST-UP
dt28-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
29-Jul-06 29-Jul-06 2300-2400: 18 MW NER-ER-NR
385 Jul-06/AP-0809
28-Jul-06
11/2006
dt28-Jul-06
DTL
HPGCL
-DTL
29-Jul-06 29-Jul-06 1000-1900: 150 MW ----
386 Jul-06/AP-0818
28-Jul-06
LEUL/OA/20021
dt28-Jul-06
LEUL
GUVNL
-PSEB
29-Jul-06 29-Jul-06 0000-0800: 14 MW
0800-2400: 15 MW
WR-NR
387 Jul-06/AP-0819
28-Jul-06
435D/GUVNL-PSEB/2006-07
dt28-Jul-06
TATA
GUVNL
-PSEB
29-Jul-06 29-Jul-06 0000-0800: 19 MW
0800-2400: 20 MW
WR-NR
388 Jul-06/AP-0820
29-Jul-06
455D/MPSEB-DTL/2006-07
dt29-Jul-06
TATA
MPSEB
-DTL
29-Jul-06 29-Jul-06 1700-2300: 100 MW WR-NR
389 Jul-06/AP-0821
29-Jul-06
PSEB/OA/RPPC/116
dt29-Jul-06
PSEB
RVPNL
-PSEB
30-Jul-06 30-Jul-06 0000-1900: 200 MW ----
390 Jul-06/AP-0822
29-Jul-06
15/2006
dt29-Jul-06
DTL
HPGCL
-DTL
30-Jul-06 30-Jul-06 1000-1900: 100 MW ----
391 Jul-06/AP-0823
29-Jul-06
LEUL/OA/20022
dt29-Jul-06
LEUL
GUVNL
-PSEB
30-Jul-06 30-Jul-06 0000-0600: 53 MW
0600-1000: 52 MW
1000-1700: 38 MW
1700-1900: 40 MW
1900-2100: 39 MW
2100-2400: 40 MW
WR-NR
392 Jul-06/AP-0824
29-Jul-06
700126
dt29-Jul-06
ADANI
GUVNL
-HPGCL
30-Jul-06 30-Jul-06 0000-1000: 26 MW
1000-1700: 19 MW
1700-2400: 20 MW
WR-NR
393 Jul-06/AP-0825
29-Jul-06
454D/GUVNL-PSEB/2006-07
dt29-Jul-06
TATA
GUVNL
-PSEB
30-Jul-06 30-Jul-06 0000-1000: 26 MW
1000-1700: 19 MW
1700-2400: 20 MW
WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
394 Jul-06/AP-0826
29-Jul-06
PTC/OA/1750D
dt29-Jul-06
PTC
GRIDCO
-DTL
30-Jul-06 30-Jul-06 2300-2400: 62 MW ER-NR
395 Jul-06/AP-0827
29-Jul-06
CC/NVVN/OA/07/1578
dt29-Jul-06
NVVN
APPCC
-PSEB
30-Jul-06 30-Jul-06 0000-1000: 13 MW
1000-1700: 10 MW
1700-2300: 5 MW
2300-2400: 10 MW
SR-WR-NR
396 Jul-06/AP-0828
29-Jul-06
CC/NVVN/OA/07/1580
dt29-Jul-06
NVVN
KPCL
-DTL
30-Jul-06 30-Jul-06 1000-1700: 14 MW
1700-2400: 15 MW
SR-WR-NR
397 Jul-06/AP-0829
29-Jul-06
CC/NVVN/OA/1581
dt29-Jul-06
NVVN
GUVNL
-DTL
30-Jul-06 30-Jul-06 1000-1700: 19 MW
1700-2400: 20 MW
WR-NR
398 Jul-06/AP-0831
29-Jul-06
UPPCL/OA/NR/APST-UP
dt29-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
30-Jul-06 30-Jul-06 0000-0600: 7 MW
0600-1000: 8 MW
1000-1900: 6 MW
1900-2100: 7 MW
2100-2300: 6 MW
NER-ER-SR-WR-NR
399 Jul-06/AP-0830
29-Jul-06
UPPCL/OA/APST-UP
dt29-Jul-06
UPPCL
ARUNANCHAL
-UPPCL
30-Jul-06 30-Jul-06 2300-2400: 18 MW NER-ER-NR
400 Jul-06/AP-0832
30-Jul-06
456D/MPSEB-DTL/2006-07
dt30-Jul-06
TATA
MPSEB
-DTL
30-Jul-06 30-Jul-06 1930-2300: 100 MW WR-NR
401 Jul-06/AP-0833
30-Jul-06
PSEB/OA/RPPC/118
dt30-Jul-06
PSEB
RVPNL
-PSEB
31-Jul-06 31-Jul-06 0000-1900: 100 MW ----
402 Jul-06/AP-0834
30-Jul-06
16/2006
dt30-Jul-06
DTL
HPGCL
-DTL
31-Jul-06 31-Jul-06 1000-1930: 100 MW ----
403 Jul-06/AP-0840
30-Jul-06
LEUL/OA/20023
dt30-Jul-06
LEUL
GUVNL
-PSEB
31-Jul-06 31-Jul-06 0000-1000: 48 MW
1000-1700: 42 MW
1700-2300: 43 MW
2300-2400: 42 MW
WR-NR
404 Jul-06/AP-0841
30-Jul-06
PTC/OA/1752D
dt30-Jul-06
PTC
GRIDCO
-DTL
31-Jul-06 31-Jul-06 2300-2400: 80 MW ER-NR
405 Jul-06/AP-0842
30-Jul-06
PTC/OA/1754D
dt30-Jul-06
PTC
GUVNL
-DTL
31-Jul-06 31-Jul-06 1000-2400: 16 MW WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
406 Jul-06/AP-0843
30-Jul-06
457D/GUVNL-PSEB/2006-07
dt30-Jul-06
TATA
GUVNL
-PSEB
31-Jul-06 31-Jul-06 0000-1000: 24 MW
1000-1700: 21 MW
1700-2300: 22 MW
2300-2400: 21 MW
WR-NR
407 Jul-06/AP-0844
30-Jul-06
CC/NVVN/OA/07/1584
dt30-Jul-06
NVVN
APPCC
-PSEB
31-Jul-06 31-Jul-06 0000-1000: 12 MW
1000-1700: 10 MW
1700-2300: 5 MW
2300-2400: 10 MW
SR-WR-NR
408 Jul-06/AP-0845
30-Jul-06
CC/NVVN/OA/07/1586
dt30-Jul-06
NVVN
KPCL
-DTL
31-Jul-06 31-Jul-06 0000-1000: 18 MW
1000-2400: 16 MW
SR-WR-NR
409 Jul-06/AP-0846
30-Jul-06
CC/NVVN/OA/07/1587
dt30-Jul-06
NVVN
GUVNL
-DTL
31-Jul-06 31-Jul-06 0000-1000: 24 MW
1000-1700: 21 MW
1700-2300: 22 MW
2300-2400: 21 MW
WR-NR
410 Jul-06/AP-0847
30-Jul-06
PSEB/OA/RPPC/121
dt30-Jul-06
PSEB
RVPNL
-PSEB
31-Jul-06 31-Jul-06 0000-1900: 100 MW ----
411 Jul-06/AP-0861
22-Jul-06
CC/NVVN/OA/05/1535
dt22-Jul-06
NVVN
AURAIYA_L
-DTL
23-Jul-06 23-Jul-06 0000-1700: 15.6 MW ----
412 Jul-06/AP-0862
23-Jul-06
CC/NVVN/OA/07/---
dt23-Jul-06
NVVN
AURAIYA_L
-DTL
24-Jul-06 24-Jul-06 1915-2400: 26 MW ----