ST Open Access Approved Transactions for month May-06

Last updated on Thu Oct 26 19:54:07 IST 2006
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
1 Feb-06/AP-2190
27-Feb-06
Ch-57/HPGC/PP-71
dt16-Feb-06
HPGCL
WBSEB
-HPGCL
01-May-06 31-May-06 0000-1700: 100 MW ER-NR
2 Feb-06/AP-2191
27-Feb-06
CC/NVVN/OA/02/1000
dt16-Feb-06
NVVN
Tripura
-HPGCL
01-May-06 31-May-06 1700-2300: 25 MW NER-ER-NR
3 Feb-06/AP-2192
27-Feb-06
CC/NVVN/OA/02/1019
dt19-Feb-06
NVVN
KSEB
-PSEB
01-May-06 31-May-06 0000-1700: 150 MW
1700-2300: 0 MW
2300-2400: 150 MW
SR-WR-NR
4 Feb-06/AP-2194
27-Feb-06
RETL/NRLDC/178
dt18-Feb-06
Reliance
WBSEB
-PSEB
01-May-06 31-May-06 0000-1700: 120 MW ER-NR
5 Feb-06/AP-2195
27-Feb-06
LEUL/OA/02
dt17-Feb-06
LEUL
WBSEB
-PSEB
01-May-06 31-May-06 0000-1700: 80 MW ER-NR
6 Feb-06/AP-2196
27-Feb-06
PTC/OA/NR/1466
dt18-Feb-06
PTC
GRIDCO
-HPGCL
01-Apr-06 31-May-06 0000-1700: 50 MW
1700-2300: 0 MW
2300-2400: 50 MW
ER-NR
7 Feb-06/AP-2197
27-Feb-06
PTC/OA/NR/1465
dt18-Feb-06
PTC
GRIDCO
-DTL
01-Apr-06 16-May-06 1700-2300: 50 MW ER-NR
8 Feb-06/AP-2197
27-Feb-06
PTC/OA/NR/1465
dt18-Feb-06
PTC
GRIDCO
-DTL
17-May-06 17-May-06 1700-2300: 50 MW ER-WR-NR
9 Feb-06/AP-2197
27-Feb-06
PTC/OA/NR/1465
dt18-Feb-06
PTC
GRIDCO
-DTL
18-May-06 31-May-06 1700-2300: 50 MW ER-NR
10 Feb-06/AP-2198
27-Feb-06
PTC/OA/NR/1464
dt18-Feb-06
PTC
GRIDCO
-DTL
01-May-06 16-May-06 0000-2400: 100 MW ER-NR
11 Feb-06/AP-2198
27-Feb-06
PTC/OA/NR/1464
dt18-Feb-06
PTC
GRIDCO
-DTL
17-May-06 17-May-06 0800-2400: 100 MW ER-WR-NR
12 Feb-06/AP-2198
27-Feb-06
PTC/OA/NR/1464
dt18-Feb-06
PTC
GRIDCO
-DTL
17-May-06 17-May-06 0000-0800: 100 MW ER-NR
13 Feb-06/AP-2198
27-Feb-06
PTC/OA/NR/1464
dt18-Feb-06
PTC
GRIDCO
-DTL
18-May-06 18-May-06 0000-0400: 100 MW
0400-0700: 50 MW
0700-2400: 100 MW
ER-WR-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
14 Feb-06/AP-2198
27-Feb-06
PTC/OA/NR/1464
dt18-Feb-06
PTC
GRIDCO
-DTL
19-May-06 31-May-06 0000-2400: 100 MW ER-NR
15 Feb-06/AP-2199
27-Feb-06
PTC/OA/NR/1467
dt18-Feb-06
PTC
GRIDCO
-PSEB
01-May-06 31-May-06 0000-1700: 50 MW
1700-2300: 0 MW
2300-2400: 50 MW
ER-NR
16 Feb-06/AP-2201
27-Feb-06
CC/NVVN/OA/02/1012
dt17-Feb-06
NVVN
KSEB
-HPGCL
01-May-06 31-May-06 0000-1700: 50 MW
1700-2300: 0 MW
2300-2400: 50 MW
SR-WR-NR
17 Apr-06/AP-0083
25-Apr-06
CC/NVVN/OA/04/1164
dt13-Apr-06
NVVN
WBSEB
-PSEB
25-May-06 30-May-06 0000-1700: 100 MW
1700-2300: 0 MW
2300-2400: 100 MW
ER-SR-WR-NR
18 Apr-06/AP-0083
25-Apr-06
CC/NVVN/OA/04/1164
dt13-Apr-06
NVVN
WBSEB
-PSEB
31-May-06 31-May-06 0600-1700: 100 MW ER-WR-NR
19 Apr-06/AP-0083
25-Apr-06
CC/NVVN/OA/04/1164
dt13-Apr-06
NVVN
WBSEB
-PSEB
31-May-06 31-May-06 0000-0600: 100 MW
2300-2400: 100 MW
ER-SR-WR-NR
20 Apr-06/AP-0084
28-Apr-06
PTC/OA/1587
dt25-Apr-06
PTC
MALANA
-HPGCL
01-May-06 31-May-06 0000-2400: 69 MW ----
21 Apr-06/AP-0085
30-Apr-06
PSEB/OA/J &K / 001
dt30-Apr-06
PSEB
J & K
-PSEB
01-May-06 01-May-06 0000-0500: 150 MW
0800-1900: 50 MW
----
22 Apr-06/AP-0086
30-Apr-06
PSEB/OA/J & K/002
dt30-Apr-06
PSEB
J & K
-PSEB
01-May-06 01-May-06 0800-1300: 75 MW ----
23 May-06/AP-0087
01-May-06
PSEB/OA/J&K/003
dt01-May-06
PSEB
J & K
-PSEB
02-May-06 02-May-06 0000-0500: 150 MW
0500-0800: 0 MW
0800-1200: 150 MW
----
24 May-06/AP-0088
01-May-06
PSEB/OA/J&K/004
dt01-May-06
PSEB
J & K
-PSEB
02-May-06 02-May-06 1200-1800: 50 MW ----
25 May-06/AP-0090
02-May-06
CC/NVVN/OA/04/1209
dt02-May-06
NVVN
DADRI_L
-DTL
02-May-06 02-May-06 1200-2400: 35 MW ----
26 May-06/AP-0092
02-May-06
PSEB/OA/J&K/005
dt02-May-06
PSEB
J & K
-PSEB
03-May-06 03-May-06 0000-0500: 150 MW
0800-1200: 150 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
27 May-06/AP-0093
02-May-06
PSEB/OA/J&K/006
dt02-May-06
PSEB
J & K
-PSEB
03-May-06 03-May-06 1200-1800: 50 MW ----
28 May-06/AP-0106
03-May-06
PSEB/OA/J&K/007
dt03-May-06
PSEB
J & K
-PSEB
04-May-06 04-May-06 0000-0500: 150 MW
0800-1200: 150 MW
----
29 May-06/AP-0107
03-May-06
PSEB/OA/J&K/008
dt03-May-06
PSEB
J & K
-PSEB
04-May-06 04-May-06 1200-1800: 50 MW ----
30 May-06/AP-0108
03-May-06
Ch-21/HPGCL/PP-77
dt03-May-06
HPGCL
UPCL
-HPGCL
04-May-06 04-May-06 0000-1700: 30 MW
1700-2300: 0 MW
2300-2400: 30 MW
----
31 May-06/AP-0109
04-May-06
Ch-22/HPGCL/PP-77
dt03-May-06
HPGCL
UPCL
-HPGCL
05-May-06 09-May-06 0000-1700: 30 MW
1700-2300: 0 MW
2300-2400: 30 MW
----
32 May-06/AP-0110
04-May-06
PSEB/OA/J&K/009
dt04-May-06
PSEB
J & K
-PSEB
05-May-06 05-May-06 0000-0500: 150 MW
0800-1200: 150 MW
----
33 May-06/AP-0111
04-May-06
PSEB/OA/J&K/010
dt04-May-06
PSEB
J & K
-PSEB
05-May-06 05-May-06 1200-1800: 50 MW ----
34 May-06/AP-0112
05-May-06
PSEB/OA/J&K/011
dt05-May-06
PSEB
J & K
-PSEB
06-May-06 06-May-06 0000-0500: 150 MW
0800-1300: 150 MW
----
35 May-06/AP-0113
05-May-06
PSEB/OA/J&K/012
dt05-May-06
PSEB
J & K
-PSEB
06-May-06 06-May-06 1300-1900: 50 MW ----
36 May-06/AP-0114
05-May-06
CC/NVVN/OA/03/1230
dt05-May-06
NVVN
ANTA_L
-DTL
06-May-06 06-May-06 0000-0600: 65 MW ----
37 May-06/AP-0115
05-May-06
CC/NVVN/OA/NR/1229
dt05-May-06
NVVN
DADRI_L
-DTL
06-May-06 06-May-06 0000-2400: 128.1 MW ----
38 May-06/AP-0116
06-May-06
PSEB/OA/J&K/013
dt06-May-06
PSEB
J & K
-PSEB
07-May-06 07-May-06 0000-0500: 150 MW
0800-1300: 150 MW
----
39 May-06/AP-0117
06-May-06
PSEB/OA/J&K/014
dt06-May-06
PSEB
J & K
-PSEB
07-May-06 07-May-06 1300-1900: 50 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
40 May-06/AP-0118
06-May-06
CC/NVVN/OA/05/1231
dt06-May-06
NVVN
DADRI_L
-DTL
07-May-06 07-May-06 0000-2400: 65 MW ----
41 May-06/AP-0119
07-May-06
PSEB/OA/J&K/015
dt07-May-06
PSEB
J & K
-PSEB
08-May-06 08-May-06 0000-0500: 150 MW
0800-1300: 150 MW
----
42 May-06/AP-0120
07-May-06
PSEB/OA/J&K/016
dt07-May-06
PSEB
J & K
-PSEB
08-May-06 08-May-06 1300-1900: 50 MW ----
43 May-06/AP-0121
07-May-06
CC/NVVN/OA/04/1233
dt07-May-06
NVVN
DADRI_L
-DTL
08-May-06 08-May-06 0000-2400: 90 MW ----
44 May-06/AP-0122
08-May-06
CC/NVVN/OA/05/1234
dt08-May-06
NVVN
ANTA_L
-DTL
08-May-06 08-May-06 0600-0900: 10 MW
0900-2400: 20 MW
----
45 May-06/AP-0123
02-May-06
CC/NVVN/OA/04/1210
dt02-May-06
NVVN
DADRI_L
-DTL
03-May-06 03-May-06 0000-2400: 43 MW ----
46 May-06/AP-0124
03-May-06
CC/NVVN/OA/1211
dt03-May-06
NVVN
DADRI_L
-DTL
04-May-06 04-May-06 0000-2400: 35 MW ----
47 May-06/AP-0125
04-May-06
CC/NVVN/OA/04/1228
dt04-May-06
NVVN
ANTA_L
-DTL
04-May-06 04-May-06 1800-2400: 85 MW ----
48 May-06/AP-0126
08-May-06
PSEB/OA/J&K/017
dt08-May-06
PSEB
J & K
-PSEB
09-May-06 09-May-06 0000-0500: 150 MW
0800-1300: 150 MW
----
49 May-06/AP-0127
08-May-06
PSEB/OA/J&K/018
dt08-May-06
PSEB
J & K
-PSEB
09-May-06 09-May-06 1300-1900: 50 MW ----
50 May-06/AP-0128
08-May-06
CC/NVVN/OA/05/1235
dt08-May-06
NVVN
DADRI_L
-DTL
09-May-06 09-May-06 0000-0145: 30 MW
1300-2400: 24.8 MW
----
51 May-06/AP-0129
08-May-06
CC/NVVN/OA/05/1236
dt08-May-06
NVVN
ANTA_L
-DTL
09-May-06 09-May-06 0000-2400: 30 MW ----
52 May-06/AP-0130
09-May-06
PSEB/OA/J&K/019
dt09-May-06
PSEB
J & K
-PSEB
10-May-06 10-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
53 May-06/AP-0131
09-May-06
PSEB/OA/J&K/020
dt09-May-06
PSEB
J & K
-PSEB
10-May-06 10-May-06 0800-1300: 150 MW ----
54 May-06/AP-0132
04-May-06
CC/NVVN/OA/05/1225
dt04-May-06
NVVN
DADRI_L
-DTL
05-May-06 05-May-06 0000-2400: 35 MW ----
55 May-06/AP-0133
04-May-06
CC/NVVN/OA/05/1226
dt04-May-06
NVVN
ANTA_L
-DTL
05-May-06 05-May-06 0000-2400: 65 MW ----
56 May-06/AP-0134
10-May-06
PSEB/OA/J&K/0021
dt10-May-06
PSEB
J & K
-PSEB
11-May-06 11-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
57 May-06/AP-0135
10-May-06
PSEB/OA/J&K/0022
dt10-May-06
PSEB
J & K
-PSEB
11-May-06 11-May-06 0800-1300: 150 MW ----
58 May-06/AP-0136
10-May-06
UPPCL/OA/NR/APST-UP/01
dt10-May-06
UPPCL
ARUNANCHAL
-UPPCL
11-May-06 11-May-06 0500-0900: 12 MW
0900-1700: 0 MW
1700-1800: 5 MW
1800-1900: 15 MW
1900-2000: 20 MW
2000-2100: 15 MW
2100-2200: 5 MW
NER-ER-NR
59 May-06/AP-0137
11-May-06
PSEB/OA/J&K/023
dt11-May-06
PSEB
J & K
-PSEB
12-May-06 12-May-06 0900-1300: 150 MW ----
60 May-06/AP-0138
11-May-06
PSEB/OA/J&K/024
dt11-May-06
PSEB
J & K
-PSEB
12-May-06 12-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
61 May-06/AP-0139
11-May-06
UPPCL/OA/NR/APST-UP/01
dt11-May-06
UPPCL
ARUNANCHAL
-UPPCL
12-May-06 12-May-06 0500-0900: 12 MW
0900-1700: 0 MW
1700-1800: 10 MW
1800-2100: 20 MW
2100-2245: 5 MW
NER-ER-NR
62 May-06/AP-0140
12-May-06
PSEB/OA/J&K/025
dt12-May-06
PSEB
J & K
-PSEB
13-May-06 13-May-06 0000-0500: 75 MW
0700-1900: 50 MW
----
63 May-06/AP-0141
12-May-06
PSEB/OA/J&K/026
dt12-May-06
PSEB
J & K
-PSEB
13-May-06 13-May-06 0800-1300: 150 MW ----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
64 May-06/AP-0142
12-May-06
UPPCL/OA/NR/APST-UP/01
dt12-May-06
UPPCL
ARUNANCHAL
-UPPCL
13-May-06 13-May-06 0500-0900: 14 MW
0900-1100: 13 MW
1600-1700: 15 MW
1700-1730: 12 MW
1730-2200: 20 MW
2200-2400: 10 MW
NER-ER-NR
65 May-06/AP-0143
09-May-06
CC/NVVN/OA/05/1237
dt09-May-06
NVVN
DADRI_L
-DTL
10-May-06 10-May-06 0000-1200: 40 MW
1215-2400: 101 MW
----
66 May-06/AP-0144
09-May-06
CC/NVVN/OA/05/1238
dt09-May-06
NVVN
ANTA_L
-DTL
10-May-06 10-May-06 0600-2200: 17 MW ----
67 May-06/AP-0151
15-May-06
CC/NVVN/OA/05/1245
dt12-May-06
NVVN
WBSEB
-PSEB
15-May-06 31-May-06 1700-1800: 200 MW ER-NR
68 May-06/AP-0145
13-May-06
PSEB/OA/J&K/027
dt13-May-06
PSEB
J & K
-PSEB
14-May-06 14-May-06 0800-1300: 150 MW ----
69 May-06/AP-0146
13-May-06
PSEB/OA/J&K/028
dt13-May-06
PSEB
J & K
-PSEB
14-May-06 14-May-06 0000-0500: 75 MW
0700-1900: 50 MW
----
70 May-06/AP-0147
13-May-06
UPPCL/OA/NR/APST-UP/01
dt13-May-06
UPPCL
ARUNANCHAL
-UPPCL
14-May-06 14-May-06 0500-0800: 12 MW
0800-1000: 11 MW
1600-1700: 10 MW
1700-1730: 5 MW
1730-1815: 12 MW
1815-2200: 15 MW
2200-2400: 10 MW
NER-ER-NR
71 May-06/AP-0148
14-May-06
PSEB/OA/J&K/029
dt14-May-06
PSEB
J & K
-PSEB
15-May-06 15-May-06 0000-0500: 75 MW
0700-1900: 50 MW
----
72 May-06/AP-0149
14-May-06
PSEB/OA/J&K/030
dt14-May-06
PSEB
J & K
-PSEB
15-May-06 15-May-06 0800-1300: 150 MW ----
73 May-06/AP-0150
14-May-06
UPPCL/NR/APST-UP/01
dt14-May-06
UPPCL
ARUNANCHAL
-UPPCL
15-May-06 15-May-06 0000-1600: 10 MW
1600-1700: 5 MW
1700-2000: 20 MW
2000-2030: 15 MW
2030-2200: 5 MW
2200-2300: 10 MW
2300-2400: 15 MW
NER-ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
74 May-06/AP-0152
15-May-06
PSEB/OA/J&K/031
dt15-May-06
PSEB
J & K
-PSEB
16-May-06 16-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
75 May-06/AP-0155
15-May-06
UPPCL/OA/NR/APST-UP/01
dt15-May-06
UPPCL
ARUNANCHAL
-UPPCL
16-May-06 16-May-06 0400-1000: 10 MW
1515-1800: 10 MW
1800-2000: 20 MW
2000-2030: 15 MW
2030-2200: 5 MW
2200-2400: 15 MW
NER-ER-NR
76 May-06/AP-0156
16-May-06
UPPCL/OA/NR/APST-UP/01
dt16-May-06
UPPCL
ARUNANCHAL
-UPPCL
17-May-06 17-May-06 0400-0800: 13 MW NER-ER-NR
77 May-06/AP-0157
17-May-06
UPPCL/OA/NR/APST-UP/01
dt17-May-06
UPPCL
ARUNANCHAL
-UPPCL
18-May-06 18-May-06 1800-2200: 15 MW
2200-2300: 10 MW
NER-ER-NR
78 May-06/AP-0159
11-May-06
CC/NVVN/OA/05/1241
dt11-May-06
NVVN
DADRI_L
-DTL
12-May-06 12-May-06 0000-2400: 70 MW ----
79 May-06/AP-0160
11-May-06
CC/NVVN/OA/05/1242
dt11-May-06
NVVN
ANTA_L
-DTL
12-May-06 12-May-06 0000-2400: 25 MW ----
80 May-06/AP-0161
12-May-06
CC/NVVN/OA/05/1243
dt12-May-06
NVVN
DADRI_L
-DTL
13-May-06 13-May-06 0000-2400: 65 MW ----
81 May-06/AP-0162
12-May-06
CC/NVVN/OA/05/1244
dt12-May-06
NVVN
ANTA_L
-DTL
13-May-06 13-May-06 0000-2400: 25 MW ----
82 May-06/AP-0163
13-May-06
CC/NVVN/OA/05/1246
dt13-May-06
NVVN
DADRI_L
-DTL
14-May-06 14-May-06 0600-0800: 74.3 MW
1130-1630: 31.3 MW
----
83 May-06/AP-0164
13-May-06
CC/NVVN/OA/05/1247
dt13-May-06
NVVN
ANTA_L
-DTL
14-May-06 14-May-06 0600-0800: 25.5 MW
1130-1630: 6.8 MW
----
84 May-06/AP-0158
18-May-06
PSEB/OA/J&K/033
dt18-May-06
PSEB
J & K
-PSEB
18-May-06 18-May-06 1300-1900: 100 MW ----
85 May-06/AP-0165
18-May-06
PSEB/OA/J&K/034
dt18-May-06
PSEB
J & K
-PSEB
19-May-06 19-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
86 May-06/AP-0166
16-May-06
CC/NVVN/OA/05/1256
dt16-May-06
NVVN
DADRI_L
-DTL
16-May-06 16-May-06 1600-2400: 50 MW ----
87 May-06/AP-0167
16-May-06
CC/NVVN/OA/05/1255
dt16-May-06
NVVN
ANTA_L
-DTL
16-May-06 16-May-06 1600-2400: 50 MW ----
88 May-06/AP-0168
18-May-06
UPPCL/OA/APST-UP/01
dt18-May-06
UPPCL
ARUNANCHAL
-UPPCL
19-May-06 19-May-06 1700-1745: 5 MW
1745-1800: 15 MW
1800-2100: 17 MW
2100-2200: 16 MW
2200-2300: 10 MW
NER-ER-NR
89 May-06/AP-0169
19-May-06
PSEB/OA/J&K/035
dt19-May-06
PSEB
J & K
-PSEB
20-May-06 20-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
90 May-06/AP-0171
20-May-06
PTC/OA/NR/1627
dt19-May-06
PTC
HPSEB
-HPGCL
22-May-06 31-May-06 0000-2400: 40 MW ----
91 May-06/AP-0172
20-May-06
PTC/OA/NR/1628
dt19-May-06
PTC
HPSEB
-DTL
22-May-06 31-May-06 0000-2400: 40 MW ----
92 May-06/AP-0173
20-May-06
PTC/OA/NR/1629
dt19-May-06
PTC
HPSEB
-PSEB
22-May-06 31-May-06 0000-2400: 40 MW ----
93 May-06/AP-0170
19-May-06
UPPCL/OA/NR/APST-UP/01
dt19-May-06
UPPCL
ARUNANCHAL
-UPPCL
20-May-06 20-May-06 1700-1800: 5 MW
1800-2200: 15 MW
2200-2300: 10 MW
NER-ER-NR
94 May-06/AP-0174
20-May-06
UPPCL/OA/NR/APST-UP/01
dt20-May-06
UPPCL
ARUNANCHAL
-UPPCL
21-May-06 21-May-06 1700-1800: 10 MW
1800-2100: 17 MW
2100-2200: 20 MW
2200-2300: 12 MW
NER-ER-NR
95 May-06/AP-0175
20-May-06
PSEB/OA/J&K/036
dt20-May-06
PSEB
J & K
-PSEB
21-May-06 21-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
96 May-06/AP-0176
21-May-06
PSEB/OA/J&K/037
dt21-May-06
PSEB
J & K
-PSEB
22-May-06 22-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
97 May-06/AP-0177
21-May-06
UPPCL/OA/NR/APST-UP/01
dt21-May-06
UPPCL
ARUNANCHAL
-UPPCL
22-May-06 22-May-06 1730-1830: 10 MW
1830-2200: 15 MW
2200-2300: 30 MW
2300-2400: 10 MW
NER-ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
98 May-06/AP-0178
22-May-06
PSEB/OA/J&K/038
dt22-May-06
PSEB
J & K
-PSEB
23-May-06 23-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
99 May-06/AP-0180
23-May-06
PSEB/OA/J&K/039
dt22-May-06
PSEB
J & K
-PSEB
24-May-06 29-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
100 May-06/AP-0179
22-May-06
UPPCL/OA/NR/APST-UP/01
dt22-May-06
UPPCL
ARUNANCHAL
-UPPCL
23-May-06 23-May-06 1730-1830: 5 MW
1830-1900: 20 MW
1900-2100: 17 MW
2100-2200: 16 MW
2200-2300: 30 MW
2300-2400: 10 MW
NER-ER-NR
101 May-06/AP-0181
23-May-06
PTC/OA/1163D
dt23-May-06
PTC
HPSEB
-UT-Chd
24-May-06 24-May-06 0000-2400: 10 MW ----
102 May-06/AP-0182
24-May-06
PTC/OA/NR/1634D
dt24-May-06
PTC
HPSEB
-UT-Chd
25-May-06 25-May-06 0000-2400: 10 MW ----
103 May-06/AP-0184
25-May-06
PTC/OA/1635
dt24-May-06
PTC
HPSEB
-UT-Chd
26-May-06 31-May-06 0000-2400: 10 MW ----
104 May-06/AP-0209
26-May-06
UPPCL/OA/NR/APST-UP/01
dt26-May-06
UPPCL
ARUNANCHAL
-UPPCL
27-May-06 27-May-06 0000-0500: 10 MW
0500-0800: 20 MW
0800-1900: 10 MW
1900-2315: 25 MW
2315-2400: 10 MW
NER-ER-NR
105 May-06/AP-0210
27-May-06
UPPCL/OA/NR/APST-UP
dt27-May-06
UPPCL
ARUNANCHAL
-UPPCL
28-May-06 28-May-06 0000-0500: 10 MW
0500-1000: 30 MW
1600-1700: 20 MW
1700-1830: 15 MW
1830-2400: 30 MW
NER-ER-NR
106 May-06/AP-0212
28-May-06
UPPCL/OA/NR/APST-UP
dt28-May-06
UPPCL
ARUNANCHAL
-UPPCL
29-May-06 29-May-06 0000-0500: 20 MW
0500-0800: 40 MW
0800-1745: 20 MW
1745-2400: 50 MW
NER-ER-NR
107 May-06/AP-0214
29-May-06
UPPCL/OA/NR/APST-UP
dt29-May-06
UPPCL
ARUNANCHAL
-UPPCL
30-May-06 30-May-06 0000-0500: 20 MW
0500-1715: 30 MW
1715-1800: 40 MW
1800-2400: 50 MW
NER-ER-NR
 
S.No RefNo/
AprNo
Application no Utilities FromDate ToDate Quantum Route
108 May-06/AP-0213
29-May-06
PSEB/OA/J&K/040
dt29-May-06
PSEB
J & K
-PSEB
30-May-06 30-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
109 May-06/AP-0215
30-May-06
PSEB/OA/J&K/043
dt30-May-06
PSEB
J & K
-PSEB
31-May-06 31-May-06 0000-0500: 50 MW
0700-1900: 50 MW
----
110 May-06/AP-0216
30-May-06
UPPCL/OA/NR/APST-UP
dt30-May-06
UPPCL
ARUNANCHAL
-UPPCL
31-May-06 31-May-06 0000-1700: 40 MW
1700-2400: 50 MW
NER-ER-NR
111 May-06/AP-0242
10-May-06
CC/NVVN/OA/05/1239
dt10-May-06
NVVN
DADRI_L
-DTL
11-May-06 11-May-06 0000-0700: 55 MW
1200-2030: 41.3 MW
----
112 May-06/AP-0243
10-May-06
CC/NVVN/OA/05/1240
dt10-May-06
NVVN
ANTA_L
-DTL
11-May-06 11-May-06 0000-0700: 20 MW
1200-2400: 18.6 MW
----
113 May-06/AP-0245
29-May-06
CC/NVVN/OA/05/1300
dt29-May-06
NVVN
DADRI_L
-DTL
30-May-06 30-May-06 1430-1900: 120 MW ----
114 May-06/AP-0246
29-May-06
CC/NVVN/OA/05/1298
dt29-May-06
NVVN
ANTA_L
-DTL
30-May-06 30-May-06 1345-1900: 40 MW ----
115 May-06/AP-0247
29-May-06
CC/NVVN/OA/05/1299
dt29-May-06
NVVN
AURAIYA_L
-DTL
30-May-06 30-May-06 1345-1900: 40 MW ----
116 May-06/AP-0248
30-May-06
CC/NVVN/OA/05/1301
dt30-May-06
NVVN
DADRI_L
-DTL
31-May-06 31-May-06 1445-1730: 100 MW ----
117 May-06/AP-0249
30-May-06
CC/NVVN/OA/05/1301
dt30-May-06
NVVN
ANTA_L
-DTL
31-May-06 31-May-06 1445-1630: 60 MW ----
118 May-06/AP-0244
30-May-06
CC/NVVN/OA/05/1302
dt30-May-06
NVVN
AURAIYA_L
-DTL
31-May-06 31-May-06 1445-1730: 40 MW ----