Power System Network is expanding manifold and the need for monitoring network on Real Time basis to ensure optimum power system operation necessiated establishment of modern Computarised Load Despatch Centers.In order to achieve this objective a Unified Load Despatch And Communication Scheme is being implemented.
This Scheme has replaced , upgraded and augmented existing facilities.
This System Coordination and Control Project is being financed from a world bank Loan.
In order to implement NR ULDC Scheme following packages were taken up.
Highlights Of NR-ULDC Scheme
Benefits Of NR-ULDC Scheme
Real time monitoring, supervision & control of Power System.
Improved system security, reliability and reduction of undelivered Energy.
Savings in the Operating cost.
Avoidance/minimisation of Grid disturbances/failures
Quick restoration during Grid disturbances/failures
Capital Investment Saving
Better Management Information
Better System Operation and Control
Real Time Environment for Operator Training
Optimal utilisation of Resources and Economic Despatch of power.
Unified Load Despatch & Communication Scheme