Northern Regional Load Despatch Centre
POSOCO Ltd LOGO
POSOCO
POSOCO Intranet E-Mail Hindi
POSOCO ISO 9001 Certified. ISO 1001 Certified OHSAS 18001 Certifiied ISO 27001 Certified
POSOCO
Skip Navigation Links
Home
Transfer capability
Expand Transfer capability
Scheduling
Expand Scheduling
Open Access
Commercial
Expand Commercial
Availability Verification
Reports
Expand Reports
Documents
Weather
Expand Weather
Disaster Management
Real-Time Data
Expand Real-Time Data
Tenders
Monthly ATC-Inter Country
Monthly ATC-Inter Regional
Monthly ATC-Intra Regional
Current IR Exchanges
Scroll up
Scroll down
Web Based Scheduling
Declared Capability
Entitlements
State Drawal Schedules
ISGS Injection Schedules
Injection Profile
URS - Details
Expand URS - Details
Transmission Constraint
Expand Transmission Constraint
IR Drawal Schedules
Implemented Schedules
Expand Implemented Schedules
Summary
Expand Summary
Applicable Losses
Applicable PoC Losses
Estimated Tx Loss
Peak Hours Declaration
Solar Forecast
Scroll up
Scroll down
Total Available URS
Expand Total Available URS
URS Sold Under STOA
Current Available URS
Expand Current Available URS
Re-Scheduled URS
Expand Re-Scheduled URS
Scroll up
Scroll down
Station
State
Scroll up
Scroll down
Thermal Stations
Gas Stations
Scroll up
Scroll down
Station Wise
State Wise
Scroll up
Scroll down
Station Wise
State Wise
Scroll up
Scroll down
Form-A
Form-B
Form-C
IR Drawal Schedules
Status Reports
URS
Expand URS
Scroll up
Scroll down
Station Wise
State Wise
Scroll up
Scroll down
Station Wise
State Wise
Scroll up
Scroll down
NR Pool Account
Expand NR Pool Account
Low Frequency Overdrawal/Undergeneration
SEM Data
SEM Calculations
Time Correction Procedure
NRLDC Fee and Charges
Expand NRLDC Fee and Charges
Violation Report
Expand Violation Report
Discrepancy Report
Scroll up
Scroll down
UI Disbursement
RE Disbursement
Reconciliation
UI/Reactive/Interest Letters
Scroll up
Scroll down
NRLDC F& C Billing/Payment Software
NRLDC Fee and Charges Order
NRLDC User Details
Bank Detail For Remmitting NRLDC Fee and Charges
Bill Details
F&C_Reconcilation
Truing-up Details
Scroll up
Scroll down
Zero Crossing Violation report
Deviaton report
Scroll up
Scroll down
Daily Reports
Expand Daily Reports
Annual Reports
Quarterly Reports
Monthly Reports
Weekly Reports
Trend Graphs
Expand Trend Graphs
RTU Availability
Telemetry Report
SCADA-SEM Comparision Report
Tripping Report
Expand Tripping Report
Data Entry by Constituents
Scroll up
Scroll down
Daily Regional Power Supply Position
Transmission Elements Outage Status
Generating Units Outage Status
Fog Report
Fog Report before 20 Dec 2011
Scroll up
Scroll down
Frequency Profile in NR
Shdl vs Act drawal of states in NR
Scroll up
Scroll down
Preliminary Report
Scroll up
Scroll down
Weather Forecast Details
IMD Website
Fog forecast(IMD)
Satellite Picture
Scroll up
Scroll down
SCADA
RE Initiative
Scroll up
Scroll down
Week - 2...
Master Data Base Raw Data Processed SEM Data Net Injection of ISGS - BBMB Net Drawal of States Schedule Vs Actual Schedule  Vs Actual Trends Exception Report Discrepancies Report
 

Master Data Base

     The file "Master.dat" contains location code, meter serial number, CT ratio, CVT ratio and location description for all the Special Energy Meters (SEMs) installed in the Northern Region.

Raw Data

      The file "NR-Raw.npc" contains raw data as received from the field for all SEMs in Northern Region.

Processed SEM Data

     Processed SEM data is in the form of datewise folders containing the files for different meters detailing the transaction of daily total MWh, high voltage MVARh, low voltage MVARh and each 15 minute time block MWH.

Net Injection of ISGS & BBMB

     These are seperate folders for BBMB, Inter Regional Exchange, NHPC, NTPC, NPC & shared projects containing the datewise files detailing each ISGS/BBMB stations'  net injection in MWh for each 15 minutes time block along with the frequency codes during the block.

Net Drawal of States  

     These have statewise folders indicating 15-minute MWh drawals at each inter-utility exchange point as well as the summated drawals of all these points as recorded by the SEMs.  Wherever required, suitable multiplication factors have been applied either due to losses on account of wheeling or where standby meters have been used.  Details of these would be available in the Discrepancies Report for the week and SEM Data Computations under Commercial link from the NRLDC Home Page.

Schedule Vs Actuals

      These are datewise files containing the comparision of schedules as implemented with all before-the-fact revisions vis-a-vis net injection of all ISGS/BBMB stations and net drawal of all state utilities as calculated from SEM data for each 15 minute time block along with frequency code.The power flow on some small radial feeders at 66 KV and below voltage levels have been included with effect from 10th February 2003. A folder for transmission loss computations for the week as well as assumptions for small feeders at   66 KV and below is also included for information with effect from 10th February 2003.

Schedule Vs Actuals Trends

      These are separate folders for each ISGS/BBMB station and state utility clubbed according to organisation containing the datewise files having graphical representation of daily schedule, actual injection/drawal and telemetered frequency.The power flow on some small radial feeders at 66 KV and below voltage levels have been included with effect from 10th February 2003.

Exception Report

      The file "Exception Report.doc" indicates the tripping/transmission constraints affecting the ISGS generation.

Discrepancy Report

      The file "Discrepancies.doc" gives the details of missing SEM data and observations on the SEM data received at NRLDC.

Reactive Energy Exchanges

      This contains 60 files for Inter-Utility reactive power exchanges for the week.  The help file "Reactive_Index" explains the various file types for reactive energy exchanges.  The file nomenclature adopted is ddmmyy.FileType.

NOTE: 

1. Frequency codes from "00" to "99" are for frequency range of 49.00 to 51.00 Hz ("00"  for frequency <= 49.00 Hz and "99" for frequency >= 51.00 Hz).

2. Post facto revision of schedules on account of nuclear power stations, BBMB generation, shared projects, inter-regional exchanges with ER has not been done and the same forms part of the account issued by NREB Secretariat. Likewise, the provisions of the Central Electricity Regulatory Commission's (CERC) orders on Availability Based Tariff have also not been incorporated & the same forms part of the UI account issued by NREB Secretariat.

3. The information above is purely for operational purposes & is intended to act as a guide to the power system operators in the Northern Region. NRLDC is not responsible for any commercial use of above data made by any utility. The weekly UI accounts and the monthly Regional Energy Accounts issued by NREB Secretariat is the ultimate reference for all inter-utility payments in line with the orders of the Central Electricity Regulatory Commission.

Reliability, Security and Economy in Power Transmission (Best viewed with 1280 by 800 Screen Resolution) Website Monitoring